Tender Value
₹2.3 Cr
EMD Value
₹2.6 L
Closing Date
4 Aug 2025, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
WORKS
18 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
With the submission of the certificate/affidavit as mentioned, the practice of verification of tenderer's documents by the Railway dispensed with. Instruction for bidders, in this regards are:
Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification of lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway thereunder.
In case of any wrong information submitted by tenderer, the contract shall be terminated, Earnest Money Deposit (EMD),Performance Guarantee (PG) and Security Deposit (SD) of contract forfeited and agency barred for doing business on entire Indian Railways for 5 (five) years.
With such a system of self-certification of credentials, tender finalization should also be speeded up. The Tenderer(s) shall keep the offer open for a minimum period of 60 days (in case of two packet system of tendering 90days) from the date of closing of the Tender.
144 conditions · 1 needing a document upload
Any payment required for E-Tendering is accepted through Net Banking or Payment Gateway only.
Credentials in support of fulfillment of eligibility criteria ( Without these documents the offer is liable to be rejected) as per details stipulated in Tender documents. Each and every pages of the supporting documents should be signed with proper seal and date.
Details of technical personnel with qualification and experience employed by the firm.
Details of special equipments , tools and plants, machinery etc available with the firm for execution of contract works.
If working through contract labour , the contractor must resgister with Labour Commissioner and necessary license to be submitted with tender or to be produced before signing of contract agreement.
Partnership deed, if any, constitution of the firm and copies of power of attorney and other connected legal documents to be submitted.
Submission of requisite information for Financial Eligibility criteria as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
All required documents duly attested as per Para 14.0 of IRGCC must be submitted.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Execution of Signaling & Telecommunication work in connection with: (1) Diversion of Road to RUB at Km. 832/29-31 for closing of LC No. 419 at Km. 832/11-13 in Raipur-Durg section, (2) Reliability improvement of earthing over Raipur Division.
SNT-R-2025-12
SNT-R-2025-12
Open
Works - General
6 Months
Raipur, Chhattisgarh
₹0
₹2.6 L
4 Aug 2025
9 Jul 2025
67 items across 3 schedules · ₹2,28,68,988.96 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Excavation of trench Depth 1.0 Mtr. & width 0.3 Mtr andclearing of roots of trees, bushes, ballast andreconditioning etc., including bailing out water and disposal of extra soil in all soils including soft rocky area. | Kilometre | 0.50 | 76,590 | 38,295 |
| 2 | Excavation of trench in all kinds of soils including soft rockyarea and clearing of roots of trees, bushes, rocks, ballastetc., to a depth of 1 Mtr. & width 0.3M for track/pucca road/Platform crossing/ level crossing and any other place asadvised by the Engineer- incharge including supply,transportation and laying of RCC pipe with collars (forjointing pipe) 150mm nominal dia to Spec.No:IS-458 intrench and drawing of Signalling/ Power/ Quad cablesthrough pipe including back filling and ramming after cablelaying as specified in Technical Circular No.2 of 1988issued by CSTE/S.E.Rly. This includes repairing andplastering of platform/pucca road after cable laying. RCCpipe shall be inspected by the Rep.of Sr. DSTE /R beforelaying. NOTE:-Power cable,signalling cable, Quad cable asmentioned above,where required shall be laid in the same trench as signalling cable but in a separate pipe. | Metre | 20.00 | 1,008.8 | 20,176 |
| 3 | Laying and Fixing of galvanised iron pipe (GI Pipe) with threadedcollars (for jointing pipe) of 80 mm nominal dia Spec.No.IS- 1239medium grade, on bridges, culverts, drains including supply andtransportation of GI pipes and all other materials required forfixing the pipe to Drg.No.Con/SK/T/2 and drawing ofSignal/Power/Quad cables inside the pipe with masonary worksover the entire length of the bridge and at entry and exit of theculvert and curing for 72 hrs, drilling of holes on the pipe at 10 cmapart to be clamped 2 Mtrs apart on culvert, for the Signalling,quad, power cable. | Metre | 50.00 | 761 | 38,050 |
| 4 | Excavation of trench and clearing of roots of trees, bushes, ballastand reconditioning etc., including bailing out water and disposal ofextra soil in Hard rocky area including concreting. Chase cuttingand smoothening of inside surface of sizes 0.08 m deep and 0.17m width at platform and cemented floor area. | Metre | 10.00 | 115 | 1,150 |
| 5 | Excavation of trenches including clearing of roots of treesetc. in hard rocky soil by chiseling up to a depth of 0.5m to0.8 Mtr. At the bottom, supply and placing half round RCCpipe on sieved soil of 30 mm over cable and concretingthroughout the lenght upto a layerof 75 mm approximately(1:2:4) , as advised by the site engineer & Guide lines onSignalling cable Laying issued by Signal DirectorateResearch,Design & Standards organisation Ministry ofRailways Manak Nagar Lucknow- 226011,Version-1.0,Effective from dt 31.10.2011 . Then digging and backfillingthe trench by digging and carrying earth from a lead ofmaximum 30Mtrs and then ramming the soil after cablelaying. This includes supply of half round RCC pipe. | Metre | 100.00 | 372 | 37,200 |
| 6 | Excavation of trench and clearing of roots of trees, bushes, ballastand reconditioning etc., including bailing out water and disposal ofextra soil. Track crossing, Road Crossing by pushing method(HDD method) at culverts/ track / pucca road crossing at a depthnot less than 1 meter with reference to bottom of rail/road surfaceincluding supply of GI pipe with 76 mm dia, Spec. No. - 1239medium grade (for the length of pushing more than 05 meters). | Metre | 60.00 | 2,246 | 1,34,760 |
| 7 | Cement Concrete of proportion 1:3:6 with graded aggregate of size 25mm. and below. | cum | 2.00 | 2,943 | 5,886 |
| 8 | Laying of Signalling Cable/Power/Quad cable / PIJF cablein the excavated trench toDrg.No:CON/SK/T/5.Transportation, supply of 'U' clampsand anchoring of cable at every 10 Mtrs with 'U' clamp toDrg.No:CSTE/C/Cable/81 including back filling withexcavated earth and ramming of trenches after cablelaying. Note: The contractor has to conduct detailed sitesurvey of the cable route, prepare a plan to get approval ofthe Railway, putting white lime powder marking beforeexcavation of earth under supervision of railways authorised representative. | Kilometre | 2.50 | 16,740 | 41,850 |
| 9 | The excavation of pit, casting of concrete foundation includingsurrounding earthwork along the foundation, erection, installationand wiring of steel appartus case, fixing of terninals, fuse blocks,signal transformer, current transformer, filament switching unit,track battery chargers, adjustable/fixed resistances, choke coils,Fuses, Relays, E type locks , termination of cables, cableinsertion, wiring to draw 110V AC therefore in the new apparatuscase as required, testing, commissioning including subsequentalterations (if required), bunching of cables, earthing of cable,armours etc. Painting of the apparatus case inside and outsideafter clearing the surface thoroughly and first coating of anti -corrosive paint and subsequent two coatings of Alluminium paintoutside and Red Oxide inside and lettering. 18 mm Hylum sheetfor location box shelf and 12 mm for cable termination in locationbox.Steel appartus case (Large) to Drg.No. CON/SK/T/8 with 4Nos. of foundation bolts 20mm x 460mm to Drg.No. SA-112 A/Mor latest. | Numbers | 3.00 | 17,067 | 51,201 |
| 10 | Alteration/ Modifications in the existing location boxes, fixing ofequipments, cable insertion, termination, wiring, testing &commissioning, two coat painting, lettering to suit the circuits asper approved wiring diagrams. This includes filling with sand and plastering the same. | Numbers | 2.00 | 2,548 | 5,096 |
| 11 | Transportation, installation of optical fibre joint closure and splicing of Optical fibre cable (2 x 24 fibres) and testing, Optical fibre cable splicing shall be done in the presence of Railway's representative. Only joint closure shall issued by the Railway. All other tools/test equipments required shall be arranged by the Contractor. This also includes excavation of earth for construction of masonary pit of bricks (inside complete plastered), the inner size of pit 1.2m x 1.2m (depth 0.75m) in all types of soils for keeping cable coils at the location of OFC joints, filling the pit with sand after jointing of cables, ramming and covering with RCC slab as per Drg. and instructions of site incharge of Railway. | Numbers | 2.00 | 19,019 | 38,038 |
| 12 | Installation, testing and commissioning of Permanent and Maintenance Free Earth pits.Installation charges : Earthpit (1 Set) It includes: (1) Civil works related to earth pit digging, PMF earth pit installation,,backfilling and chamber making, (2) Materials for chamber including Chamber Cover. | Numbers | 105.00 | 5,882 | 6,17,610 |
| 13 | Excavation of earth pit, transportation, placing and fixing of earth electrode with construction of cement encloser to Drg.No.CON/SK/T/9 and CON/SK/T/9A and drawal of GI wire wrapped on MS strip (35 x 6 mm) from earth electrode to all signalling equipments, including fixing and soldering of lugs at both end of the wire. | Numbers | 5.00 | 1,941 | 9,705 |
| 14 | Transportation including loading/unloading of HDPE pipe from the stores of railway to the work site, laying of the same in excavated trench/already laid GI/RCC pipes/tubes, jointing, levelling and end sealing the pipes. | Kilometre | 0.50 | 7,762 | 3,881 |
| 15 | Transportation, loading/unloading of OFC from the stores of railway to the work site with care, pushing/pulling OFC through the HDPE pipes, sealing of the duct by sealling /caps plugs. The cable is to be laid by mechanised means. At inaccessible places where mechanised laying is not possible, the cable is to be laid manually. This also includes testing of cable drums in the store premises before transportation and submissions of results thereof. Empty cable drums to be returned by the contractor. The cable drums with unused cable at site to be returned by the contractor to the stores depot of Consignee. | Kilometre | 0.50 | 18,672 | 9,336 |
| 16 | Execution of Quad cable joint using thermoshrink/Universaljointing kit for derivation/termination joints with VF Transformerson Quad/jelly filled Telecom Cable. | Numbers | 2.00 | 1,385 | 2,770 |
| 17 | Supply, Installation and commissioning of Surge & Lightning protection arrangement in the cable huts/OFC huts for all the equipments including all the circuits derived from MUX at the stations and Ring Earth (Six Earth pits). Each earth shall be as per RDSO Specification No. RDSO/SPN/197/2008 or latest and RDSO TAN (STS/E/TAN/3006 Ver.3.1 or latest) (Copy enclosed) should be followed strictly. | Numbers | 5.00 | 49,643 | 2,48,215 |
| 18 | Fixing of concrete cable route marker at 30- 40 meter andat diversion point including supply & transportation of cableroute marker at site. Detail size & fixing of cable route marker should be followed as per drawing no. SDO/Cablelaying/020. | Numbers | 15.00 | 415 | 6,225 |
| 19 | Provision of cement concrete enclosure for earth electrodes as per DRG. NO. S&T/C- 36(NKG). This includes supply of all materials by the contractor duly inspected by representative of SrDSTE/R. | Numbers | 500.00 | 481.35 | 2,40,675 |
| 20 | Transportation of released materials from site to the stores ofSSE(Sig/Tele)/R or BIA or BYT or DRZ or to GSD. This includesloading, unloading and stacking of materials. | Per Trip | 2.00 | 3,661.1 | 7,322.2 |
| 21 | Transportation and fixing of following types of C.T.Box and termination of cable as per details of jointing schedule approved by the Railway Engineers. (b) 20 pair C.T.Box (wago type) | Numbers | 2.00 | 792 | 1,584 |
| 22 | Alteration of existing Q-series/Composite Relay Racks and cable termination racks. | Numbers | 2.00 | 19,785 | 39,570 |
| 23 | Installation of signal posts for Multiple Aspect Colour LightSignals complete with signal units, bases, LED unit, fixingand wiring of current transformers of LED units, ladders &other fittings, excavation of pit, casting of cement concretefoundations with necessary water outlets, erection andfixing of complete fittings of the signal/signal post withnecessary earthed screen protection arrangement,including drawing of cable through signal posts,termination of cables, wiring, testing and commissioning,two coat painting and lettering, supply and fixing of speedboards if required for the following:- NOTE:- Thefoundation for Multiple Aspect Colour Light Signal Postdrg. No. Con/SK/T/12 and and the foundation bolts shallbe of sizes 24 mm x 915 mm to Drg. No. SA- 116A/M andbolts for each foundation for above shall be of size 20 mmx 305 mm to Drg. No. SA- 110A/M ( 4 nos. for each) withtwo nuts and two washers each per bolt. (a) 3 ASPECT/4ASPECT | Numbers | 1.00 | 19,551 | 19,551 |
| 24 | Design & Preparation of SWR & GWR in English & Hindi for execution to be made by the contractor as per SECRly practice in conformity with GR, SR & SEM provisions and in accordance with CSTE/OL/GRC's circular No.3 of 1984 with the latest alterations & amendments based on IP (tentative/approved) (to be supplied by the Rlys). | Numbers | 1.00 | 8,197.6 | 8,197.6 |
| 25 | Execution to be made by the contractor in Autocad as perfollowing :-1. SECRailwayPractice in conformity with GR,SR& SEM. 2 . As per latest typicalcircuit diagram andguidelinesof SEC railway. Design &Preparation ofCircuits and drawingsDesign,Preparation & checking of documents and Circuit diagram and drawings(a) Design and development of Circuit Diagram in size B(A3) as per SEM sheet including contact analysis. | Sheet | 30.00 | 1,004 | 30,120 |
| 26 | Supply & installation of Fencing (Picket Type Tie Bar fencing) work around S&T apparatus case or building/office etc. as per instruction of Railway representative. | Kg | 2000.00 | 199.05 | 3,98,100 |
| 27 | Supply of active lightening arrester of Class A for building protection as per NBC 2016. Non resettable type counter shall also be supplied to count the number of lightening occurrences. It also includes supply of 50 sq mm copper-bonded steel conductor for connecting Class A device to the earth pit. This include installation, testing and commissioning of Class A device on the top of the building. This device shall be installed at suitable height on the roof of the building using a GI mast as per instructions of Railway engineer at Site. The device shall be connected to earth pit using a 50 sq mm copper-bonded steel conductor. This shall be run firmly only the site of the mast with the help of spacers. It shall also be ensured that the down conductor shall not touch the building throughout. the down conductor shall be connected to the earth electrode using exothermic welding. A counter shall be installed at appropriate space to count the number of occurrence. All the material & accessories like spacers, welding material etc. required for installation shall be supplied by the contractor. Isolated Spark Gap (ISG) of rating 100 KA shall be used to interconnect lightning arrestor earth pit to signal ring earth as per RDSO TAN No. STS/E/TAN/3006 Ver.3.1 dated 25.06.2025 or Latest. | Numbers | 7.00 | 66,992.1 | 4,68,944.7 |
| 28 | Dismantling of Lifting barrier complete and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 1.00 | 3,623 | 3,623 |
| 29 | Dismantling of operation cum indication panel and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 1.00 | 2,415 | 2,415 |
| 30 | Dismantling of Signal posts/BSLB/SLB/Stop Board and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 4.00 | 232 | 928 |
| 31 | Dismantling of Relay racks with all fittings, battery racks complete, Equipment rack complete, SM's slide and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 2.00 | 360 | 720 |
| 32 | Dismantling of Steel apparatus case with fittings and stacking as per instruction of Rep.of Sr.DSTE/R. | Numbers | 4.00 | 232 | 928 |
| 33 | Dismantling of Emergency sliding barrier and stacking asper instruction of Rep.of Sr.DSTE/R. | Set | 2.00 | 3,556.8 | 7,113.6 |
| 34 | Dismantling of Location Foundation(By hydraulic breaker). | Numbers | 2.00 | 1,087 | 2,174 |
| 35 | Dismantling of Signal Foundation(upto ground level by hydraulic breaker). | Numbers | 4.00 | 2,174 | 8,696 |
| 36 | Modification in existing Hitachi Make EI system of Automatic Signaling in connection with closure of LC No. Closure of LC No. 419 between Sarona-Raipur (i) Redesign of EI Systems with related application logic & interface circuit. (ii) Factory Acceptance Test (FAT) -(This includes one round of IFAT & one round of CFAT). Testing & Commissioning support. (iii) Installation of Modified Program & proposed changes as per approved Signaling Plan. (iv) Supply of Document (It shall be supplied in CD with one set of Application Logic Circuit & Interface Circuit in A3 size only) | Job | 1.00 | 33,63,000 | 33,63,000 |
| 37 | Supply and provision of Perimetric/Ring Earth with Maintenance Free Earth arrangement as per RDSO TAN No. STS/E/TAN/3006 Ver.3.1 dated 25.06.2025 or Latest. Supply of all requites material as per latest RDSO Guide Line. Earthing shall comply all guidelines (arrangement, parameters, pre- commissioning check list, warranty of 60 months etc.) specified in RDSO TAN no. STS/E/TAN/3006 Ver.3.1 dated 25.06.2025. NOTE: (1) The overall Earth resistance value for the earth connected with MEEB shall be less than 1 ohm, (2) The earth pits shall be interlinked using a 25 x 2 mm copper tape /Solid copper round conductor of 8mm dia/GI tape of 50X6mm (for theft prone areas only) with proper exothermic welding, (3) The interconnecting conductor shall be buried at a depth of not less than 500 mm below the ground level. This conductor shall also be covered with approximately 30 kg of earth enhancement compound for every 3 meters of its length, (4) PVC insulated multi-strand single core 4 X 35 sq. mm copper cable or 2nos of 25 X 2 mm copper tape to be used for connecting MEEB to nearest earth electrode, (5) Provision of Bonding Ring Conductor (BRC)of 25 x 2 mm copper tape shall be provided at Relay Room & IPS Room and all equipments & racks should be connected to BRC as per RDSO TAN, (6) All the required Materials for providing Earthing & Bonding as per schedule will be supplied by Contractor and from RDSO approved firm only. | Station | 20.00 | 2,46,283.6 | 49,25,672 |
| 38 | (a) Digging a trench to a min depth of 0.5 meter laying 50x6 mm bare Galvanized steel tape connecting all the eight earth pits (minimum) (b) Routing and laying 50x6 mm Galvanized steel tape connecting all the eight earth pits (minimum) (c) Carrying out exothermic weld connections on all the eight earth electrodes (minimum) to Galvanized steel tape of size 50x6 mm for interconnecting the earth pits.(d) It shall be ensured that the distance between any two earth electrodes shall be minimum 3 m and max up to twice the length of the earth electrode to avoid mutual resistance effects. | Metre | 112.00 | 60.7 | 6,798.4 |
| Schedule total | ₹1,08,45,576.5 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .