| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 LAccepted-AOC 1ST FLOOR FLAT NO A 104 ANANT EMEGINE SOCIETY PURANA BUS STAND KORBA DISTT KORBA C G 495678 | 495678 | L1 | Accepted-AOC Techno-commercially accepted by TC and approved by GM | |
| 2 | Rejected-Technical MISSION HOSPITAL CHOWK KEDARPUR AMBIKAPUR DIST SURGUJA CG 497001 | SURGUJA | CHHATTISGARH | 497001 | - | Rejected-Technical Rejected being L2 bidder | |
| 3 | Rejected-Technical 615 BHAIROTAL BAZA DAFAI BHAIROTAL KORBA CG 495454 | KORBA | CHHATTISGARH | 495454 | - | Rejected-Technical Rejected being L3 bidder |
Tender Value
₹34.6 L
EMD Value
₹43,300
Closing Date
15 Dec 2022, 11:00 amClosed
STAFF OFFICER (EandM),SECL KUSMUNDA AREA
OFFICE OF THE STAFF OFFICER (EandM),SECL KUSMUNDA AREA P.O.KUSMUNDA COLLIERY 495454 DISTT. KORBA (CG)
Assistance on regular basis for electrical maintenance and repair work of HT/LT switch gear panels at phase-I and AC-4, CHP, KOCP
2022_SECL_263968_1
SECL/GM/KSM/EnM/ eTender/22-23/50 dtd 03.12.2022
Open Tender
Electrical and Maintenance Works
Item Rate
360 days
CHP KUSMUNDA PROJECT
Please refer Tender documents.
6 documents required · 6 mandatory
₹43,300
13 Mar 2023
3 Dec 2022
16 Dec 2022
3 Dec 2022
15 Dec 2022
5 Dec 2022
5 Dec 2022 - 8 Dec 2022
Amount
Description of Work
Work for Assistance for day to day repair & maintenance as under- (i) Assistance in routine maintenance of transformer, VCB electrical switches and other equipments (ii) Jumper checking repairing/replacement and maintenance of jumper on overhead line (HT/LT) as and when required (iii) Carrying, lifting and shifting of equipments such as megger discharge rods, brackets and cables, ICTP, MCCB, Starters, ladders etc and other materials required (iv) maintenance of power HT/LT Control panels inside the substation and conveyor gantry (v) Regular grass root cleaning inside and near the vicinity of s/stn. yard. Note: All above assistance job per day with the help of 06 nos. well experienced/ trained (1 no. skilled & 1 no. semi-skilled in each shift) of labours in three shift.
Total impact of GST for the purpose of CTC
MS R.P. JAISWAL
S N Agrawal
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .