Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC AT B 30 MARUTI NAGAR 8TH LANEM SIDHAMAHAVIAR DIST PURI | PURI | ODISHA | 752001 | ₹6.9 L | L1 | Accepted-AOC M/S. BALIYARSINGH ELECTRICAL ENGINEERING and CONSTRUCTION has deposited requisite amount of APS and ISD |
| 2 | L1₹6.9 LRejected-Finance | ₹6.9 L | L1 | Rejected-Finance Looser on lottery |
| 3 | L1₹6.9 LRejected-Finance KHATA NO 903 PLOT NO 423 TALASAHI KHORDHA | KHORDHA | ODISHA | 751001 | ₹6.9 L | L1 | Rejected-Finance Looser on lottery |
| 4 | Rejected-Technical | - | - | Rejected-Technical OTHER THAN L1 BIDDER |
| 5 | Rejected-Technical AT DUMDUMA KHANDAGIRI PO PS KHANDAGIRI BHUBANESWAR DIST KHORDHA ODISHA | KHORDHA | ODISHA | 751019 | - | - | Rejected-Technical OTHER THAN L1 BIDDER |
Tender Value
₹8.1 L
EMD Value
₹8,081
Closing Date
9 Sept 2024, 5:00 pmClosed
Executive Engineer, R.W EL.DIVN.BBSR
Executive Engineer, D.A.O-II, and Estimator of R.W EL.DIVN.BBSR
Shifting and Construction of 3Ph 3W 11Kv line, 3Ph 4W LT line, 25kva S/S-1no and 16 KVA Sub-StationS-1no from Bhoiani Nalla to Tarini near Panchubatia
2024_CERWI_104550_1
EERWELBBSR 06/ 2024-25
Open Tender
Electrical Works
Percentage
90 days
Balugaon
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹8,081
Yes
24 Oct 2024
2 Sept 2024
10 Sept 2024
2 Sept 2024
9 Sept 2024
2 Sept 2024
eProcurement System Government of Odisha Created By: Tapan Kumar Mohanty Created Date/Time: 24-Sep-2024 12:16 PM Tender Title: Shifting and Construction of 3Ph 3W 11Kv line, 3Ph 4W LT line, 25kva S/S-1no and 16 KVA Sub-StationS-1no from Bhoiani Nalla to Tarini near Panchubatia Tender ID: 2024_CERWI_104550_1
Tender Inviting Authority: Executive Engineer R.W Electrical Division Bhubaneswar
Name of Work: Shifting and Construction of 3Ph 3W 11Kv line, 3Ph 4W LT line, 25kva S/S-1no & 16 kva S/S-1no from Bhoiani Nalla to Tarini near Panchubatia
Contract No: EERWELBBSR 06/ 2024-25
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 AD9 SYNTHETIC & SPORTS (P) LTD. (GSTN-21AANCA2295D1ZY) BID ID -2542343 808144.000 -14.990 687003.214 Six Lakh Eighty Seven Thousand Three
2.00 M/S. M.C.C. ASSOCIATES (GSTN-21AHYPB6787G1ZY) BID ID -2542934 808144.000 -14.990 687003.214 Six Lakh Eighty Seven Thousand Three
3.00 MANGALA PRASANNA NAYAK (GSTN-21ACQPN9405L2Z7) BID ID -2543470 808144.000 -9.990 727410.414 Seven Lakh Twenty Seven Thousand Four Hundred and Ten
4.00 M/S. BALIYARSINGH ELECTRICAL ENGINEERING & CONSTRUCTION (GSTN-21ALAPD8635M2Z6) BID ID -2543486 808144.000 -14.990 687003.214 Six Lakh Eighty Seven Thousand Three
5.00 M/S ORISSA TRADING HOUSE, PROP. RITU MODI (GSTN-21ACYPM6789Q1ZA) BID ID -2543511 808144.000 -0.100 807335.856 Eight Lakh Seven Thousand Three Hundred and Thirty Five
Lowest Amount Quoted BY: AD9 SYNTHETIC & SPORTS (P) LTD.,M/S. M.C.C. ASSOCIATES,M/S. BALIYARSINGH ELECTRICAL ENGINEERING & CONSTRUCTION(687003.214)
BOQ Summary Details Tender Title: Shifting and Construction of 3Ph 3W 11Kv line, 3Ph 4W LT line, 25kva S/S-1no and 16 KVA Sub-StationS-1no from Bhoiani Nalla to Tarini near Panchubatia Tender ID: 2024_CERWI_104550_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 AD9 SYNTHETIC & SPORTS (P) LTD. 687003.214 L1
2 M/S. M.C.C. ASSOCIATES 687003.214 L1
3 M/S. BALIYARSINGH ELECTRICAL ENGINEERING & CONSTRUCTION 687003.214 L1
4 MANGALA PRASANNA NAYAK 727410.414 L2
5 M/S ORISSA TRADING HOUSE, PROP. RITU MODI 807335.856 L3
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_505812.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .