Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹3.0 L−₹15,797.95 (4.35%)Accepted-AOC | L2 | Accepted-AOC L1 | |
| 2 | L1₹3.6 LRejected-AOC | L1 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | PARVATHI ENTERPRISES L1 | SRI SATHYA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for transporting the ILMS and its control panel from Coal jetty II to work shop. | 1 | Operation | 3,823 ₹4,511.14 Lowest | 3,996 ₹4,715.28 |
| 2.00 | Charges for tilting the ILMS and dismantling of ILMS side covers, top frame, removing the inner and outer coils. | 1 | Operation | 11,585 ₹13,670.3 Lowest | 12,111 ₹14,290.98 |
| 3.00 | Charges for removing the worn out insulation of the coils, thorough cleaning of the coils and applying two coats of epoxy gel insulation, varnishing the coil and body of ILMS. | 1 | Operation | 13,006 ₹15,347.08 Lowest | 13,597 ₹16,044.46 |
| 4.00 | Charges for reconditioning of ILMS coil including of materials like magnetic bar, conductor, leatheroid paper and end termination for each set of coil. | 1 | Operation | 26,466 ₹31,229.88 Lowest | 27,669 ₹32,649.42 |
| 5.00 | Charges for assembling of ILMS coils, packing, welding, tilting the coils and assembling the endless belt, pulleys and gear box, then fixing the top frame and side covers. | 1 | Operation | 9,363 ₹11,048.34 Lowest | 9,788 ₹11,549.84 |
| 6.00 | Charges for dismantling of power and control cables, dismantling of conveyor 65 ILMS control panel from its position to '0' mtr level and removing of existing damaged contactors relays, timers and relaying of internal wiring for panel and re-erecting the ILMS control panel on the angle(welded) platform at ground floor to required position in conveyor 48B and laying of new Power & control cable and connecting to the ILMS panel including cost of materials such as contactors, relays ,etc.., complete. | 1 | Operation | 1,13,064 ₹1,33,415.52 Lowest | 1,18,204 ₹1,39,480.72 |
| 7.00 | Charges for painting 1 coat of red oxide and two coats of grey paint on the ILMS and its control Panel. | 29.9 | Sq.mtr. | 6,249.1 ₹7,373.94 Lowest | 6,548.1 ₹7,726.76 |
| 8.00 | Charges for hot oil circulation till the IR value of the ILMS winding & breakdown value of the oil reaches the required level and attending to the connected & related works.. | 1 | Operation | 8,870 ₹10,466.6 Lowest | 9,273 ₹10,942.14 |
| 9.00 | Charges for transporting the overhauled ILMS from work shop to PCH-II and lifting upto the top floor of PCH-II by hoist. | 1 | Operation | 8,449 ₹9,969.82 Lowest | 8,834 ₹10,424.12 |
| 10.00 | Charges for loading and unloading the ILMS in the contractor vehicle during sending from Coal jetty-II to Workshop and workshop to PCH-II / TTPS. | 2 | Operation | 6,320 ₹7,457.6 Lowest | 6,606 ₹7,795.08 |
Tender Value
Refer Docs
EMD Value
₹3,500
Closing Date
28 Mar 2025, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
TTPS- ECHP-II- Erection of In-line magnetic separator dismantled from Conveyor-65 Coal Jetty-II in Conveyor-48B head end at PCH-II top floor inside TTPS campus with complete overhauling work.
2025_EB_532452_1
CE/SE/MI/TTPS/187/2024-2025
Open Tender
Miscellaneous Works
Works
30 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,500
Yes
16 Dec 2025
14 Mar 2025
29 Mar 2025
14 Mar 2025
28 Mar 2025
14 Mar 2025
Charges for transporting the ILMS and its control panel from Coal jetty II to work shop.
Charges for tilting the ILMS and dismantling of ILMS side covers, top frame, removing the inner and outer coils.
Charges for removing the worn out insulation of the coils, thorough cleaning of the coils and applying two coats of epoxy gel insulation, varnishing the coil and body of ILMS.
Charges for reconditioning of ILMS coil including of materials like magnetic bar, conductor, leatheroid paper and end termination for each set of coil.
Charges for assembling of ILMS coils, packing, welding, tilting the coils and assembling the endless belt, pulleys and gear box, then fixing the top frame and side covers.
Charges for dismantling of power and control cables, dismantling of conveyor 65 ILMS control panel from its position to '0' mtr level and removing of existing damaged contactors relays, timers and relaying of internal wiring for panel and re-erecting the ILMS control panel on the angle(welded) platform at ground floor to required position in conveyor 48B and laying of new Power & control cable and connecting to the ILMS panel including cost of materials such as contactors, relays ,etc.., complete.
Charges for painting 1 coat of red oxide and two coats of grey paint on the ILMS and its control Panel.
Charges for hot oil circulation till the IR value of the ILMS winding & breakdown value of the oil reaches the required level and attending to the connected & related works..
Charges for transporting the overhauled ILMS from work shop to PCH-II and lifting upto the top floor of PCH-II by hoist.
Charges for loading and unloading the ILMS in the contractor vehicle during sending from Coal jetty-II to Workshop and workshop to PCH-II / TTPS.
Charges for Providing Rubber Lagging on ILMS pulleys using 10mm thick rubber sheets including the cost of vulcanizing solution hardener, rubber sheet, etc.., complete.
Charges for providing cold vulcanizing joint in 1800mm width ILMS belt including the cost of vulcanizing solution, hardener, etc.., complete.
Charges for Lifting, assembling and erecting the tested ILMS in its original position including wiring termination and other related works in conveyor in 48B at PCH-II top floor.
SRI SATHYA ENTERPRISES (BID ID -1280034)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .