Gulbarga Electricity Supply Company Limited
SE Projects
Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis
GESCOM/2026-27/SS/WORK_INDENT305
GESCOM/2026-27/SS/WORK_INDENT305
Open
Sub-Station
Two Tender Document System(Two Cover)
GESCOM Superintending Engineer Projects Corporate Office Gulbarga
3 documents required · 3 mandatory
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
The Bidder should have satisfactorily executed the electrical works relating to new Sub-Station works/ Augmentation/ Enhancement of Sub-Station works of value not less than 90 percentage of the Amount Put to Tender in any One year during the previous 05 financial years i.e. FY 2021-22, 2022-23, 2023-24, 2024-25 and 2025-26 on PTK/TTK basis in any ESCOMs/ State/ Central Government/ Distribution Companies/ PSUs on PTK/TTK Basis as on the date of bid submission. Which shall be in satisfactory service for at least one year from the date of commissioning. Note Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10 percentage per year to bring them to the price level of the FY in which the tenders are invited. Scanned copy of the DWA and satisfactory Work commissioning /Performance Certificate duly indicating Qty. & amount of executed works with date of completion issued by an officer not below the rank of Executive Engineer or equivalent officer of the concerned ESCOMs/Govt. Utilities /PSUs shall be uploaded.
The Bidder should have satisfactorily executed the work of minimum 50 percentage of Amount Put to Tender relating to Construction of atleast one work of 33kV/66kV/110kV/220kV voltage Class Sub-Station OR Augmentation of Sub Station work by providing atleast one additional 5MVA(33/11kV) Power Transformer/ above capacity with Terminal Bay work on PTK/TTK Basis in any ESCOMs/ State/ Central Government/ Distribution Companies/ PSUs during any one year of the previous 05 financial years i.e. FY 2021-22, 2022-23, 2023-24, 2024-25 and 2025-26 as on the date of bid submission. Which shall be in satisfactory service for at least one year from the date of commissioning. Note Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10 percentage per year to bring them to the price level of the FY in which the tenders are invited. Scanned copy of the DWA and Commissioning/Performance certificate duly indicating Qty. & amount of executed works with date of completion issued by an officer not below the rank of Executive Engineer or equivalent officer of the concerned ESCOMs/ Govt. Utilities/ PSUs shall be uploaded.
The Bidder should be a registered sole proprietorship Firm or a partnership Firm under Partnership Act, 1932 in India or a limited liability partnership (LLP firm) act 2008 or a registered company incorporated in India under companies Act 1956/2013. Scanned copy of Certificate of Incorporation in case of Registered Company/Partnership deed in case of Partnership Firm or Certification of Incorporation issued by Registrar of Companies in case of LLP Firm or PAN & GST registration certificate in case of sole proprietorship firm is to be uploaded.
The Bidder should possess a valid Super Grade License / Class-I Electrical Contractors License issued by the Govt. of Karnataka as on the date of submission of bid. The valid Super Grade License / Class I Electrical Contractors License certificate issued by Electrical Inspectorate, GoK is to be scanned and uploaded.
Bidder shall upload the valid documents of EPF, ESI & GST Registration certificate. Documents in original shall be scanned and uploaded.
The Bidder shall not have been Defaulted /Barred/Black Listed against any Work against any of the previous Orders placed by any State/Central Government/Public sector under takings/Private Sector in the last 05 Years as on the date of submission of bid. The self-declaration shall be uploaded.
Turnover: The bidder should have achieved in at least Two Financial years, a minimum financial turnover of not less than two times the amount put to tender during the 05 Financial years FY 2020-21, 2021-22, 2022-23, 2023-24 and 2024-25. Note Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10 percentage per year to bring them to the price level of the FY in which the tenders are invited. The bidder should upload the copy of Audited Annual Financial Statements (Including Profit & Loss Account), Balance sheets for the respective Financial Years duly signed by proprietor/Director & certified by Chartered Accountant with UDI No.
Liquid Assets: The Bidder should have Liquid assets and/or availability of Credit Facilities of not less than 25 percentage of amount put to tender as on the date of NIT or later before submission of bid, consisting of cash at bank, term deposits with maturity date and availability of fund based credit facility. a certificate issued by any Nationalized Bank/ Scheduled commercial Bank. The bidder should upload the copy of the Credit Certificate should possess the name of the firm, tender indent number and credit facility to be issued in the name of the Chief Engineer (Ele) Operation, Corporate Office, GESCOM Kalaburagi. The Liquid Asset certificate shall be uploaded in the format enclosed as per Annexure-A. If bidder uploads in any other format, then such bids will be rejected. The conditional credit facility certificates are liable for rejection
Assessed Available Tender Capacity the Bidder has to furnish the details of works in hand as on date of submission of bids duly indicating date of award, awarded amount, percentage of work completion and work description which is to be certified by the officer not below the rank of Executive Engineer. The available tender capacity shall not be less than the Total Amount Put to Tender. The assessed available tender capacity equal to AxNx1.5 minus B Where, Where, A equal to Maximum value of Infrastructure works executed in any one year during the last 5 years (Updated to FY in which tenders are invited), taking into account the completed as well as works in progress. N equal to Number of years prescribed for completion of works for which tenders are invited. B equal to value at CSR 2025-26 price level of existing commitments and ongoing works to be completed during the next 12 months (Period of completion of the works for which tenders are invited). Note Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10 percentage per year to bring them to the price level of the FY in which the tenders are invited. The bidder should upload statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed shall be counter signed by the employer in charge, not below the rank of Executive Engineer or Equivalent. The statement shall be as per the format prescribed in Annexure-B. The bidder shall note that the value of pending work should be considered based on financial progress achieved in the particular work.
Cumulative clause: If the bidder has participated for more than one enquiry, then the bidder shall fulfill the financial requirements of B(1&2) cumulatively for all enquiries participated relating to bid enquiry Nos.641,642&643. If this condition is not met then the offer of the bidder will be considered to the enquiry for which the bidder is eligible based on the chronological order of the bid enquiry for which the bidder has participated at the discretion of GESCOM. If the Bidder participated in all Bid Enquiries & found responsive as L1 Bidder for all Bids, then the Bidder will be eligible for award only 02 Bids as per chronological order.
₹5,000
₹11.7 L
7 Sept 2026
7 Sept 2026
12 Oct 2026
17 Sept 2026
18 Sept 2026
Gulbarga Electricity Supply Company Limited.
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR 643/2026-27/ 46456-71 Dtd:20.08.2026.
“Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis” including supply of all equipment’s/materials, erection (Including Civil Works), testing and commissioning.
TECHNO - COMMERCIAL SHEETS
Gulbarga Electricity Supply Company Limited.
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR 643/2026-27/ 46456-71 Dtd:20.08.2026.
“Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis” including supply of all equipment’s/materials, erection (Including Civil Works), testing and commissioning.
BID PROPOSAL SHEET
Bidder's Name & Address :
Bid Proposal Reference :
Person to be contacted :
E-Mail Address:
The Chief Engineer (Electy.), (Operations), Corporate Office, GESCOM, Kalaburagi - 585102.
Gulbarga Electricity Supply Company Limited.
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR 643/2026-27/ 46456-71 Dtd:20.08.2026.
SCHEDULE-1 CHECK LIST-1
SHEET FOR TECHNOCOMMERCIAL OPENING
“Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis” including supply of all equipment’s/materials, erection (Including Civil Works), testing and commissioning.
Bidders Name and Address: To,
The Chief Engineer (Electy.), (Operations), Corporate Office, GESCOM, Kalaburagi - 585102.
STATEMENT OF COMMERCIAL TERMS AND CONDITIONS
Sl. No. Particulars Details
1 Bid proposal form furnished. (YES/NO)
2 No deviation certificate furnished. (YES/NO)
3 Bid Security (EMD) to be paid through e-procurement portal only
4 Validity of the Bid. (To be coated)
5 Qualifying Requirements. (Furnished/ Not furnoshed)
6 Financial capability (Furnished/Not furnished)
7 Price Basis. (Accepted/Not accepted)
8 Taxes & Duties (Furnished/Not furnished)
9 Completion Schedule (Accepted/Not accepted)
10 Guarantee (Accepted/Not accepted)
11 Payment Terms (Accepted/Not accepted)
Place Designation
Name of the Company
GULBARGA ELECTRICITY SUPPLY COMPANY LIMITED
SCHEDULE - 10 PERFORMANCE GUARANTEE
SHEET FOR TECHNOCOMMERCIAL OPENING
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR 643/2026-27/ 46456-71 Dtd:20.08.2026.
“Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis” including supply of all equipment’s/materials, erection (Including Civil Works), testing and commissioning.
Bidders Name and Address
The Chief Engineer (Electy.), (Operations), Corporate Office, GESCOM, Kalaburagi - 585102.
We Declare that the ratings and performance figures of the equipment furnished by us under the Turnkey Package are Guaranteed. We further declare that in the event of any deficiencies in meeting the guarantees in repect of the characteristics as established after conducting the performance test,you may at your discretion, reject the equipment, in which case we shall replace the same with equipment as per specification and meeting the guarantee, free of charge and within a resonable time, to be mutually agreed.
Place Designation
Name of the Company
Gulbarga Electricity Supply Company Limited
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR 643/2026-27/ 46456-71 Dtd:20.08.2026.
“Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis” including supply of all equipment’s/materials, erection (Including Civil Works), testing and commissioning.
No deviation certificate ( the bidder shall upload this certificate)
DECLARATION BY THE BIDDER
With reference to the bid proposal Enquiry
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR 643/2026-27/ 46456-71 Dtd:20.08.2026.
“Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis” including supply of all equipment’s/materials, erection (Including Civil Works), testing and commissioning.
we confirm that we have read the bid conditions and stipulations and all the clauses are acceptable to us and we have not taken any deviations whatsoever. Any deviations mentioned anywhere in the document shall be ignored.
Name of the Bidder:
Gulbarga Electricity Supply Company Limited
“Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis” including supply of all equipment’s/materials, erection (Including Civil Works), testing and commissioning.
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR 643/2026-27/ 46456-71 Dtd:20.08.2026.
The bidder must furnish relevant documents in support of qualifying requirements while submitting bid.
Name and address of Bidder:
QUALIFYING REQUIREMENTS YES/NO
A. Technical: Documents
1 The Bidder should be a registered sole proprietorship Firm or a partnership Firm under Partnership Act, 1932 in India or a limited liability partnership (LLP firm) act 2008 or a registered company incorporated in India under companies Act 1956/2013. Scanned copy of Certificate of Incorporation in case of Registered Company/Partnership deed in case of Partnership Firm or Certification of Incorporation issued by Registrar of Companies in case of LLP Firm or PAN & GST registration certificate in case of sole proprietorship firm is to be uploaded.
2 The Bidder should possess a valid Super Grade License / Class-I Electrical Contractors License issued by the Govt. of Karnataka as on the date of submission of bid. The valid Super Grade License / Class-I Electrical Contractors License certificate issued by Electrical Inspectorate, GoK is to be scanned and uploaded.
3 Bidder shall upload the valid documents of EPF, ESI & GST Registration certificate. Documents in original shall be scanned and uploaded.
4 The Bidder shall not have been Defaulted /Barred/Black Listed against any Work against any of the previous Orders placed by any State/Central Government/Public sector under takings/Private Sector in the last 05 Years as on the date of submission of bid. The self-declaration shall be uploaded.
5 The Bidder should have satisfactorily executed the electrical works relating to new Sub-Station works/ Augmentation/ Enhancement of Sub-Station works of value not less than 90% of the Amount Put to Tender in any One year during the previous 05 financial years i.e. FY 2021-22, 2022-23, 2023-24, 2024-25 and 2025-26 on PTK/TTK basis in any ESCOMs/ State/ Central Government/ Distribution Companies/ PSUs on PTK/TTK Basis as on the date of bid submission. Which shall be in satisfactory service for at least one year from the date of commissioning. Note: Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited. Scanned copy of the DWA and satisfactory Work commissioning /Performance Certificate duly indicating Qty. & amount of executed works with date of completion issued by an officer not below the rank of Executive Engineer or equivalent officer of the concerned ESCOMs/Govt. Utilities /PSUs shall be uploaded.
6 The Bidder should have satisfactorily executed the work of minimum 50% of Amount Put to Tender relating to Construction of atleast one work of 33kV/66kV/110kV/220kV voltage Class Sub-Station OR Augmentation of Sub Station work by providing atleast one additional 5MVA(33/11kV) Power Transformer/ above capacity with Terminal Bay work on PTK/TTK Basis in any ESCOMs/ State/ Central Government/ Distribution Companies/ PSUs during any one year of the previous 05 financial years i.e. FY 2021-22, 2022-23, 2023-24, 2024-25 and 2025-26 as on the date of bid submission. Which shall be in satisfactory service for at least one year from the date of commissioning. Note: Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited. Scanned copy of the DWA and Commissioning/Performance certificate duly indicating Qty. & amount of executed works with date of completion issued by an officer not below the rank of Executive Engineer or equivalent officer of the concerned ESCOMs/ Govt. Utilities/ PSUs shall be uploaded.
1 Turnover: The bidder should have achieved in at least Two Financial years, a minimum financial turnover of not less than two times the amount put to tender during the 05 Financial years ie. FY 2020-21, 2021-22, 2022-23, 2023-24 and 2024-25. Note-Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited. The bidder should upload the copy of Audited Annual Financial Statements (Including Profit & Loss Account), Balance sheets for the respective Financial Years duly signed by proprietor/Director & certified by Chartered Accountant with UDI No.
2 Liquid Assets: The Bidder should have Liquid assets and/or availability of Credit Facilities of not less than 25% of amount put to tender as on the date of NIT or later before submission of bid, consisting of cash at bank, term deposits with maturity date and availability of fund based credit facility. a certificate issued by any Nationalized Bank/ Scheduled commercial Bank. The bidder should upload the copy of the Credit Certificate should possess the name of the firm, tender indent number and credit facility to be issued in the name of the Chief Engineer (Ele)., Operation, Corporate Office, GESCOM Kalaburagi. The Liquid Asset certificate shall be uploaded in the format enclosed as per Annexure-A. If bidder uploads in any other format, then such bids will be rejected. The conditional credit facility certificates are liable for rejection.
3 Assessed Available Tender Capacity: The Bidder has to furnish the details of works in hand as on date of submission of bids duly indicating date of award, awarded amount, % of work completion and work description which is to be certified by the officer not below the rank of Executive Engineer. The available tender capacity shall not be less than the Total Amount Put to Tender. The assessed available tender capacity = A*N*1.5 – B Where, Where, A= Maximum value of Infrastructure works executed in any one year during the last 5 years (Updated to FY in which tenders are invited), taking into account the completed as well as works in progress. N= Number of years prescribed for completion of works for which tenders are invited. B= value at CSR 2025-26 price level of existing commitments and ongoing works to be completed during the next 12 months (Period of completion of the works for which tenders are invited). Note: Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited. The bidder should upload statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed shall be counter signed by the employer in charge, not below the rank of Executive Engineer or Equivalent. The statement shall be as per the format prescribed in Annexure-B. The bidder shall note that the value of pending work should be considered based on financial progress achieved in the particular work.
4 Cumulative clause: If the bidder has participated for more than one enquiry, then the bidder shall fulfill the financial requirements of B(1&2) cumulatively for all enquiries participated relating to bid enquiry Nos.641, 642 & 643. If this condition is not met then the offer of the bidder will be considered to the enquiry for which the bidder is eligible based on the chronological order of the bid enquiry for which the bidder has participated at the discretion of GESCOM. If the Bidder participated in all Bid Enquiries & found responsive as L1 Bidder for all Bids, then the Bidder will be eligible for award only 02 Bids as per chronological order. The self-declaration shall be uploaded.
GULBARGA ELECTRICITY SUPPLY COMPANY LIMITED
Bill of Materials for "Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis”.
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR643/2026-27/46456-71 Dtd:20.08.2026.
Sl. No. Particulars Unit Station Qty. CSR 2025-26 Unit Rates with 10% OH + 10% CP + ASL/3 (Excl. GST) Total Amount
Supply Portion: Station.
A.1 Transformers:
1 Power Transformers: 33/11KV, 5MVA, DELTA / STAR, DYn11. 3Ph, 50Hz, Core type winding with OLTC, RTCC Panel etc.complete filled with Transil oil and 10% spare oil. Nos 2 7917120.052040816 2
2 Distribution Transformer (Cable Entry type): 63KVA, 11/443V 3 Phase 50 Cycles stacked CRGO Core DT BEE Star 2 (5 Star) Rated with Oil Al. Winding (Provided with Tap changer). No. 1 208996.90408163265 1
A.2 33kV SF6 Circuit Breakers: CB with Semi-Pneumatic/ Pneumatic operated / Spring type operating mechanism, including mounting Structures arrangements with rigid, bi-metallic terminal connectors complete suitable for Lynx ACSR and mounting structures. 3
3 33KV, 800A, 25KA SF6 Circuit Breaker with Termincal Connector suitable for Al. Tube/Conductor with spring operating mechanism & Mounting Structure. Nos 3 616187.2346938775 2
A.2a 11kV PCVCB's: 11kV, 350MVA, 25kA, Porcelain Clad VCB Switchgear (1250A for Incomer and 800A for feeders), outdoor type, (Remote Announciation cum Control panel) with CTs & PTs etc., complete as per technical specification. Note: 1. Simplex type Annunciator panel shall be provided for switchgear(consisting of incomer,feeders and BC). 2.For Capacitor Bank: The Capacitor Bank panel shall be same as that of the 11kV bank i.e. incomer panel in all respect.In addition to relays provided in the I/C, the following addition relays to be provided. i) Circulating current relay with timer. ii) Under voltage relay. iii) Timer relay. 3. The Electronic Trivector meters with ABT features has to be provided. 6
4 11KV PCVCB, 350MVA, 25KA, 1250A Outdoor type incomer Panel (SCADA Compatible) with 03 Nos CT Ratio 600-300/1-1-1A & one 3Ph Potential Transformers 11KV√3 110V/√3-110V/√3-110V/√3. Set 2 869298.0520408164 2
5 11KV PCVCB, 350MVA, 25KA, 800A, Out door type Feeder Panel (SCADA Compatible) with 03 Nos CT Ratio 200-100/1-1A. Set 6 669566.0173469387 2
6 11KV PCVCB, 350MVA, 25KA, 800A, Out door type Feeder Panel for Capacitor Bank (SCADA Compatible). with 03 Nos CT Ratio 400-200/1-1-1A. Set 2 783106.8520408163 3
7 Announciator Panel for 1I/C+4F for PCVCB. Set 2 151779.65204081632 6
A.3 CTs: Oil Filled CT's 0.2s Class with Terminal Connector including marshalling boxes, Single phase, oil filled outdoor type with rigid bimetallic terminal connectors suitable for Lynx ACSR conductor 2
8 33KV, 31.5KA CT of ratio 400-200/1-1-1A for Lines. Nos 3 46222.034693877555 3
9 33KV, 31.5KA CT of ratio 200-100/1-1-1A for Transformer. Nos 6 46110.81734693878 0.3
10 11KV NCT of ratio 600-300/1-1-1A for REFR protection (25kA SWG). Nos 2 51590.45204081632 0.65
A.4 PTs: Single phase, oil filled outdoor type with rigid bimetallic terminal connectors suitable for Lynx ACSR with marshalling box as per technical specifications. 32
11 33KV Single phase, oil filled, outdoor type : Ratio: 33KV√3 110V/√3 - 110V/√3 Nos 3 50165.23469387755 6
A.5 ACSR Conductors: 12
12 Lynx Conductor. Kms 0.3 220624.34693877553 1
13 Coyote Conductor. Kms 0.65 160626.62166405024 4
14 9 Mtr. Long 145 Kg W/L RCC pole for ODS & DP's. Nos 32 7552.053252551021 11
15 DP Structure for 9Mtr RCC Poles,145Kg WL incl. 5Kg, 8 SWG GI Wire for Structure grounding for feeders.(Excl. Poles cost) Set 6 6668.017346938775 1
16 8 Mtr. Long 115 KG W.L. RCC Poles for yard lighting Nos 12 5702.808673469387 7
A.7 Isolators: Isolator with rigid-bi-metallic terminal connections suitabel for Lynx ACSR with Cu earth bonds. 7
17 33KV, 800A, 31.5KA Class Double break Upright mounting type with earth switch. (Live point height 3750mm). set 1 98392.90408163265 9
18 33KV, 800A, 31.5KA Class Double break Upright mounting type without earth switch. (Live point height 3750mm). set 4 81139.22602040817 27
19 11kV 400A Special Roaster GOS set 6 16065.217346938776 1
20 11KV 400A, Double Break GOS set 11 24660.66400742115 2
21 11kV 200A, Single Break GOS (Polymer Type Post Insulator). set 1 11542.904081632652 1
22 H-Frame Set for fixing 11kV GOS. Set 7 4279.72915451895 2
23 Insulated GOS Operating Rods. No. 7 508.1291545189505 6
A.9 Lightning Arrestors. 12
24 30KV, 10KA Lightening Arrestor, Normal Duty Polymeric Discharge Class-2. Nos 9 13973.744897959183 6
25 10KV 5KA, LA Polymeric type with Ground Disconnector. Nos 27 2106.7149659863944 6
A.10 Battery Set/Battery Charger: 6
26 Battery Set (Plante Type) 110V, 200AH. set 1 634461.7040816327 120
27 Battery Charger 110V, 15A float & 30A boost (with float & boost battery charger as per technical specifications). set 1 189711.70408163266 6
A.11 Capacitor Bank with 0.2% Series reactor & NCT 12.1kV, 2.9MVAr star connected Capacitor Bank Design, engineering, supply, erection of Capacitor Bank with internal fuses, terminal connector, Neutral CTs & 0.2% series reactors on neutral side with elevating /mounting structure and with 10% spare capacitors complete (This does not include breaker, panel, civil works like excavation and foundation concreting works) including testing & commissioning. set 2 621590.4520408163 3
A.12 Control & Relay Panel Simplex 110V DC compatible to SCADA complete as per technical specification: Note: 1. All the C&R Panels and associated panels shall be of one and the same make for uniformily and interchangeability of Components. 2. The accuracy class of metering core of CTs and VTs and ETV meter of C&R Panels shall be 0.2s accuracy class irrespective of what has been indicated else where in the bid document. 3. The electronic tri-vector meter with ABT & TOD features, DLMS protocol energy meter has to be provided. 5
28 33kV Line Panel for Over Head Line. set 1 269846.50408163265 9
29 33/11kV Transformer Panel. set 2 794185.2520408164 3
A.13 Insulators: 9
30 Post Insulators solid core 33kV class Nos 6 3886.417346938775 6
31 Post Insulators solid core 33kV or 11kV class Nos 12 3830.8086734693875 2
32 33kV 90 KN Polymer Disc Insulators Nos 6 674.0173469387755 12
33 33KV Polymeric Pin Insulators. Nos. 6 1018.4173469387755 2
34 11 kV 5KN Polymeric Pin Insulators (24mm Dia FRP Rod). No 6 346.41734693877555 24
35 11 kV 45KN composite/polymeric insulators No 120 219.16086734693874 24
A.14 Station Structures: (Supply Fabrication & Galvanization). Incl. Bolt & Nuts ISS:5358-1969. 18
A.15 Mounting Structures: Incl. Bolt & Nuts ISS:5358-1969. 1
38 For 33KV Isolators - 0.25 MT, NB-0.007 Set 5 32921.28401632653 1
39 For 33KV Current Transformers - 0.0885MT, NB-0.004 Set 9 11885.313497959181 1
40 For 33KV Voltage Transformers - 0.0885 MT, NB-0.004 Set 3 12033.603293877548 20
41 For 33KV Lightning Arrestors - 0.082 MT, NB-0.005 Set 9 11191.475297959183 8
44 For High P.I. Support with horizontal structure for fixing 3 nos. of 33KV Pin Insulator (Bolted type foundation) - 0.22MT, NB-0.011. Set 12 29558.506273469393 42
45 S.M.Rail and M.S. angle iron for Transformer plinth (2 nos. of 3m long) SM rail and 65x65x6 mm angle iron 8 mtr long 0.22 MT each. Set 2 28360.156040816328 80
A.16 11KV ODS: Beam out of chanel for stringing conductor. 3
47 1B2 - 4.0 mtrs long wt 0.036MT, NB-0.0081 (channels 100x50mm) Nos 24 5701.1220967346935 12
48 Angles 65x65x6 mm of 2.50 mtrs long for fixing 11KV GOS handle support (wt 0.010 MT) Nos 18 1311.0044489795919 12
A.17 Grounding of equiments 50
49 CI Pipes of 100 mm ID 13mm thickness, 2.75 Mtrs with 2 part clamp out of GI Flat 50x6mm contineously welded alround the pipe using cast iron welding electrodes (as per approved R&D KPTCL drawing) Nos 40 14218.682602040819 66
50 Sodium Bentonite Clay for earthing Kgs. 1500 28.044869387755103 6
A.18 Hardware Materials for Auxiliary Transformer 1
51 Double Pole TC Set complete for 63kVA Star Rated Transformer (Including 2Nos of Poles 9Mtr RCC 145Kg WL). CDS-25 Set 1 32536.904081632652 1
52 GI Wire 8 SWG (4.064mm Dia) Kg 0 1
53 11kV, Solid Core type HG Fuse Unit Set/3Nos 1 1815.704081632653 1
54 LT Distribution Box with MCCB Nos 1 27621.70408163265 150
A.19 LT Wiring (For Aux Transformer) 500
55 Al Lead Wire - 95Sq.mm Mtrs 20 190.64920408163263 800
56 Copper Lugs - 95Sq.mm. Nos 8 268.2130102040816 200
57 Spacers for DTC Wiring. Nos 3 264.43469387755107 1500
58 Fish Plate with complete Nos 6 375.2173469387755 600
A.20 Bolted Type Tension Clamp 600
59 Single Lynx ACSR Conductor 70/90 KN 16mm Nos. 42 1545.8881924198251 75
60 Single Coyote ACSR Conductor 70/90 KN 16mm Nos 80 1444.7413010204082 75
A.21 Bolted Type Suspesion Clamp 100
61 Single Lynx ACSR Conductor 70/90 KN 16mm Nos 3 1588.034693877551 100
62 Single Coyote ACSR Conductor 70/90 KN 16mm Nos 3 1460.834693877551 50
A.22 Post Insulator Clamps 100
63 Single Lynx ACSR Conductor 127/76mm Nos 12 1076.8086734693877 38
64 Single Coyote ACSR Conductor 127/76mm Nos 12 1001.2086734693877 15
A.23 "T" Clamp for ACSR Conductor 50
65 Single Lynx to Single Lynx Nos 50 637.346081632653 25
66 Single Coyote to Coyote Nos 66 604.110667903525 75
67 Coyote to Coyote (C Type Wedge Connector) Nos 6 875.6173469387755 250
A.24 Pad Clamps 5
68 For Coyote ACSR Nos 0 9
69 For Lynx ACSR Nos 0 35
A.25 LTAC Panel: 10
70 AC Distribution Box Single front (outdoor type) 6 Terminal one I/C of 100A MCCB 20kA + 6 O/G MCB 16 A+1 O/G of 100A, HRC fuse Nos 1 84432.10408163266 8
71 LTAC/ACDB Panel (Indoor), 415V as per technical specification comprising of voltmeter and ammeter, 1 I/C MCCB 200A + 2 nos. 3-Phase 63A O/G SFU, + 2 nos. 3 Phase 32A O/G SFU 100A + 14 O/G SFU, 6 nos. 3 Phase 16A SFU etc. complete Nos 1 99789.70408163265 6
72 DC Distribution panel (Outdoor) as per technical specification comprising of earth fault indicator, indication circuit for AC mains failure, 1 no. 100A SFU for I/C + 12 nos. 32A SFU for O/G Nos 1 60699.70408163265 2
73 DC Distribution panel (Indoor) as per technical specification comprising of earth fault indicator, indication circuit for AC mains failure, 1 no. 100A SFU for I/C + 12 nos. 32A SFU for O/G Nos 1 60699.70408163265 1
A.27 Power Cable: 1.1kV Armoured Al. Cable. (With Glands/Lugs/ Ferruels) 1
74 1.1kV 4Core 95Sq.mm Aluminium Cable, . Mtrs 150 882.8486938775509 2
75 1.1kV, 4Core 6Sq.mm Aluminium Cable for street light Mtrs 500 115.3346081632653 6
A.28 Cu Control Cable with Accessories: (With Glands/Lugs/Ferruels) 2
A.29 PVC Pipes:Providing PVC ringtite pipes conforming to IS 4985:2000. 2
A.30 Bends: Supply and delivery at site special moulded variety PVC bend as per IS 7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark with its latest amendments. 4
A.31 Faraday's caging: 3
92 Earth Wire 7/3.15mm G.I. Wire for Ground Conductor Mtrs 250 92.6692163265306 3
A.32 Name Boards: 3
93 Danger Boards Nos 5 461.0608163265306 3
94 Phase Plates Each Nos 9 165.34489795918367 2
95 Name plates for equipment/Earth pit Nos 35 346.6658309037901 2
96 Name plate for feeders and capacitor bank Nos 10 394.3304081632653 1
A.33 Fire Fighting Equipments with necessary mounting stand: 1
97 Foam type extinguisher(Mech) 9.00 Ltr. Capacity Nos 8 4834.213010204081 1
98 Carbon dioxide type 4.5Kg capacity Nos 6 10138.417346938775 1
99 Sand type G.I.Bucket 9 Ltr. Capacity. Nos 6 807.2173469387754 1
100 Steel Mounting stand for buckets.(Each stand for 3 buckets) Nos 2 3058.8520408163267 2
A.34 Station Service Equipments: 1
101 Single line diagram Nos 1 4267.304081632653 1
102 Name Board for S/S Nos 1 6667.304081632653 6
103 First Aid Box Nos 2 1096.8520408163265 1
104 Rubber mat 10mm Thick (1x2 mtr as per specification) Nos 6 2391.217346938776 2
105 Shock Treatment / First Aid charts with lamination. Nos 2 2877.6520408163265 2
106 Drinking Water Purifier RO Nos 1 16867.304081632654 1
107 Door locks Nos 4 526.8260204081632 1
109 Calling bell Nos 1 962.5040816326531 2
110 Supply & fixing Ceiling Fan (48" Sweep (1200 mm) Regular model) Nos 4 4125.626020408164 6
111 Supply & fixing Exhaust Fan of 1440 RPM of 300 mm (12") size. Nos 2 2714.4520408163266 4
A.35 Furniture: 4
112 Steel Almirah 6 1/2 feet Nos 2 10509.652040816325 1
113 Executive Officer table Nos 1 12667.304081632654 2
114 Office table Nos 1 8808.104081632653 12
115 Steel slotted angle rack (small size) Nos 4 1947.6260204081632 15
117 Executive revolving chair Nos 1 9571.304081632654 12
118 S' type office chairs Nos 4 1126.8260204081632
A.36 Maintenance Tools and Plant.
119 Telescopic ladder Aluminium 6 Mtr. Height Nos 1 25381.30408163265
120 Ring spanner set - 12Nos Per Set Nos 1 1628.5040816326532
121 Tube spanner set - 12Nos Per Set Nos 1 2234.504081632653
122 Rubber hand gloves (15 KV Seamless confirming to ISS) Pairs 5 453.8608163265306
123 Rubber shoes knee hight Pairs 2 2668.8520408163267
124 Insulated cutting player 12" size Nos 3 652.034693877551
125 Insulated cutting player 8"size Nos 3 480.43469387755107
126 Screwdriver 18 inch Nos 3 467.234693877551
127 Screwdriver 12 inch Nos 3 304.03469387755104
130 Box spanners - 12Nos Per Set Set 1 5547.7040816326535
131 Allen keys set Set 1 1190.5040816326532
132 Insulation Tester (Megger) 500V Rating Nos 1 19900.904081632652
133 Digital Megger 2.5kV to 5kV rating Nos 1 61089.70408163265
134 Transil Oil Di-Electric Breakdown Test Kit Nos 0
135 Digital Clamp Multimeter (Tong tester) Nos 1 4680.104081632653
136 Hydro meter for recording specific gravity of battery. Nos 2 1316.4520408163266
137 Specific gravity correction chart Nos 1 1650.104081632653
138 Wall mounting type holder for hydrometers Nos 1 3616.9040816326533
139 Grounding sticks Extendable upto 18ft (3Nos of Each 6ft) 3Nos per Set Set 6 2027.6173469387757
140 Manila rope 3/4 inch (One bundle 100m) Set 1 4964.504081632653
141 Silica Gel Kg 0
142 Adjustabale Screw Spanner 12 Inches Nos 2 638.4520408163265
143 Rubber appron Nos 2 2422.8520408163267
144 Pippette Nos 1 1528.904081632653
145 Protective Goggle Nos 1 1650.104081632653
146 Rain Coats with duck back Nos 2 1561.2520408163266
147 Glass Funnel Nos 2 1072.8520408163265
148 Hickery rods Nos 6 6009.217346938775
149 Safety belts Nos 4 1272.0260204081633
150 Electrical Safety helmets attached with Electronic induction Tester Nos 4 3138.0260204081633
151 Thermometer with wall mounting holder Nos 1 3616.9040816326533
152 Rechargeble 5W LED hand Torch Nos 2 1730.4520408163266
A.37 Station yard lighting (outdoor): Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT > 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire > IK08. Power Factor >0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiency>1301m/w, nominal CRI >75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source.
153 LED Street Light 90 Watts. Set 12 8519.208673469388
154 Supplying and Fixing of 40mm Dia Class A GI Pipe Bracket upto 2Mtrs Long Bent at suitable angle and fixing to this Bracket Street Light Fitting of all capacities to GI or CI or Rail or RCC Pole / Wall using suitable Clamps, Bolts, Nuts and Wiring using suitable capacity Wires. Mtrs 15 1848.08693877551
155 Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.(6-32 A SP) Nos 12 602.8086734693878
156 Fixing Halogen/Metal Halide/SVL/IL/LED/Floodlight Fitting over existing Pole/Wall Ceiling including Clamps, Bolts, Nuts and Wiring using suitable capacity Wires. Nos 12 257.20867346938775
GULBARGA ELECTRICITY SUPPLY COMPANY LIMITED
Bill of Materials for "Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis”.
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR643/2026-27/46456-71 Dtd:20.08.2026.
Sl. No. Particulars Unit Station Qty. CSR 2025-26 Unit Rates with 10% OH + 10% CP + ASL/3 (Excl. GST) Total Amount
Erection Portion: Station
B.1 Erection of Transformers
1 Moving the Transformer on to the plinth (Maximum allowable distance is 50 mtrs.) more than 50 mtrs. approval of the D(T) has to be obtained) Tot wt: 13 MT/Tr (ie.13MT*2 no. Transformer*30Mts=780) Per MT/ Mtr 780 86.40634200332042 780
2 Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., (for the total wt. of the Tr.) Tot wt:13MT/Tr =13x2=26 MT 26 1203.7902600996126 26
4 Filtration of oil using filter set of the contractor, to bring the insulation value to I.E. Specifications Litre 1200 7.984122302158274 1200
5 Wiring of Transformer marshalling box, bucholtz relay, fixing Thermometer, OLTC upto control panel and assisting in testing and commissioning by RT/MT/Firm Engineers for 5MVA. LS 2 7917.673381294964 2
6 Fabrication of Transformer railing and embedding in Transformer plinth. LS 2 2275.273381294964 2
7 Wiring: Identification of wires, Ferruling crimping and termination of wires. Wiring of Protective Devices, Cooling fans, Oil flow Pumps, OLTC, RTCC Set 2 16213.273381294965 2
8 Testing: 1. Ratio Test 2. SC test 3. Excitation test 4. Magnetic Balance test 5. Vector group test. 6. induced high voltage test. 7. OLTC operation. 8. Protective devices operation checks. 9. stability checks:- for differential and REFR protection. Each 2 38227.27338129496 2
B.2 Erection of Distribution Transformer: 63 KVA,11/443v 3 Phase 50 Cycles DT 5 Star Rated with Oil Aluminium Winding (CDS 25). Set 1 2215.346762589928 1
B.3 Circuit Breakers (33KV, 800A, 25KA SF6): 3
9 Breaker Erection, Assembly alignment & interpole Wiring of Breakers with its connected equipments including movement from the point of unloading to the point of erection. Set 3 6396.4489208633095 3
10 Assisting in Testing and Commissioning. Set 3 2465.248920863309 3
11 Wiring: Identification, Ferruling, Crimping and Termination of wires in Breakers & Wiring up to Control Panel/Relay Panels. Set 3 9736.04892086331 3
12 Testing: Test for insulation level, Gas leakage, Testing for Travel Time, Trip and Close Timings, Local Trip close test Remote Trip and Close Test, Tripping through Relays, operation of interlocks etc. Set 3 37854.44892086331 10
B.4 11kV Switchgear/Kiosk: Incomer Panel + Feeder Panel + Capacitor Bank. 10
13 Erection, alignment and fixing to the foundation, indoor/outdoor 11kV switchgear Panel/unit including movement from the point of unloading to the point of erection for 11kV Indoor/out door switchgear Per Panel 10 2231.2946762589927 1
14 Wiring & assisting in testing & Commissioning for 11kV Indoor/out door switchgear Per Panel 10 1139.294676258993 3
15 Testing & Commissiong Wiring (2I+8F+1BC+AP3): Identification of wires, Ferruling Crimping & Termination of wires for annunciation, etc., Testing of Relays, CTs, PTs, & Breaker for operation For single 11kV panel indoor/outdoor type /Kiosk Set 1 108049.34676258992 3
B.5 Erection of 33kV CTs: 3
16 Erection of CTs Wiring including movement from the point of unloading to the point erection. Set/(3Nos) 3 2663.248920863309 3
17 Assisting in Testing & Commissioning. Set/(3Nos) 3 1166.8489208633093 2
18 Wiring: Inspection of Wiring, Ferruling, Crimping of Lugs, Connections up to Marshalling Box & Control Panel. Set/(3Nos) 3 3463.6489208633097 2
19 Testing & Commissioning of CTs: Insulation, Polarity, Ratio, Excitation. Set/(3Nos) 3 12820.04892086331 2
B.6 Erection of NCTs: 1
20 Erection of NCTs with ground including movement from the point of unloading to the point of erection. Set 2 1254.0733812949638 1
21 Assisting in Testing and Commissioning Set 2 580.873381294964 1
22 Testing & Commissioning of NCT Set 2 5516.473381294964 1
B.7 Erection of 33kV PTs: 32
23 Erection of PTs Wiring including movement from the point of unloading to the point erection. Set (3Nos) 1 3290.5467625899278 6
24 Assisting in Testing & Commissioning. Set (3Nos) 1 1794.146762589928 12
25 Wiring: Inspection of Wiring, Ferruling, Crimping of Lugs, Connections up to Marshalling Box & Control Panel. Set (3Nos) 1 4080.1467625899277 32
26 Testing & Commissioning of PTs: Insulation, Polarity, Ratio, Excitation. Set 1 13564.946762589929 32
B.8 Erection of Poles 32
27 9 Mtr. Long 145 Kg RCC pole Nos 32 1218.6045863309353 32
28 DP Structure for 9Mtr RCC Poles,145Kg WL incl. 5Kg, 8 SWG GI Wire for Structure grounding for feeders.(Excl. Poles cost) Nos 6 2196.8244604316546 12
29 8 Mtr. Long 115 KG W.L. RCC Poles for yard lighting Nos 12 1063.6122302158274 12
B.9 Digging / Base Concreting 9Mtr RCC Pole 12
30 Digging of Pit 1.8Mtr Depth for erection of 9Mtr RCC Poles. (Ordinary Soil). Each 32 702.6045863309353 12
31 Base concreting with CC 1:2:4 (500x650x150mm) Each 32 125.40458633093525 5
32 Pole Concreting with CC 1:2:4 (650x500x1700mm) Each 32 1086.6045863309353 5
33 Coping of Poles. (150mm all alround the pole for an height of 300mm) (400x400x300mm) Each 32 125.40458633093525 6
B.10 Digging / Base Concreting 8Mtr RCC Pole 11
34 Digging of Pit 1.6Mtr Depth for erection of 8Mtr RCC Poles. (Ordinary Soil). Each 12 617.2122302158274 1
35 Base concreting with CC 1:2:4 (500x650x150mm) Each 12 174.41223021582732 7
36 Pole Concreting with CC 1:2:4 (400x400x1500mm) Each 12 539.2122302158274 3
37 Coping of Poles. (150mm all alround the pole for an height of 300mm) (400x400x300mm) Each 12 174.41223021582732 9
B.11 Erection of Isolators (33kV 800A): 1
38 Assembly, Errection alignment and wiring including movement from the point of unloading to the point of erection. (Upright). Set 5 1598.1893525179858 1
39 Assisting in Testing and Commissioning (Upright) Set 5 400.58935251798556 1
B.12 Fixing of GOS 3
40 Single break 400A with roaster switch GOS set 6 1337.6244604316546 3
41 400A, 11KV Double Break GOS set 11 1383.9406147809025 3
42 200A, 11KV Single Break GOS. set 1 2121.746762589928 1
43 H-Frame Set for 11kV GOS, GI Set 7 480.02096608427536 6
B.13 Erection of Lightning Arrestors. 3
44 Erection of Lightning arrestors and wiring including movement from the point of unloading to the point of erection for 30kV Polymeric. Set/(3Nos) 3 670.0489208633093 5
45 Erection of Lightning arrestors and wiring including movement from the point of unloading to the point of erection for 10kV Polymeric. Set/(3Nos) 9 231.74964028776978 9
B.14 Battery Set: 3
46 Erection of Battery Set (Plante/Grid Plate Type) 110V, 200AH. Set 1 8190.146762589929 9
B.15 Battery Charger 6
47 Erection of Battery Charger and wiring for 110 Volts Set 1 2167.346762589928 2
48 Testing & Commissioning of 110V DC: (1 set for 33kV Stations) (added both): Wiring: Identification, Ferruling, Crimping & connecting i) AC Supply cable upto 2 sources ii) Load cables, connection at charger end upto 10 load points. Testing: i) AC supply Voltage Phase Sequence. ii) Testing of Output DC Voltages in Boost/Float/Trickle/Variations as per the order/requirement. iii) Testing for Ripple Factor. Commissioning: i) Fixing of Boost Voltage level ii) Fixing of Float Voltage level iii) Fixing of Trickle Volage level iv) Testing of alarm, indication and load ckts, Auto/Manual change overs etc. v) Full load test in Boost & Trickle modes. Set 1 34813.34676258993 12
B.16 Erection of Control Panel (33kV Line & 33/11kV Transformer): 24
49 Erection of control panels, auxilary panels, carrier cabinets etc., alignment and fixing properly to foundation base including movement from the point of unloading to the point of erection. Panel 3 4709.24892086331 24
50 Assisting in testing and commissioning of panels. Panel 3 8765.24892086331 18
51 Test & Commissioning: (Added both): i) C& R Panels Wiring & Testing: Wiring:Identification, Ferruling, Crimping, termination of wires in C&R panels. Testing: Testing for insulation level, Testing of relays, control operations for closing tripping etc., interlocks Alarm, Annunciation and Indication Checks. Each 3 48024.44892086331 11
B.17 Insulators: 40
52 HG Fuse Unit, 11kV with Solid Core Insulators set 1 1194.1467625899281 1
B.18 Station Structures: Errection, assembly and alignment of Station structure as per the directions of site Engineer. 1
53 Station Towers 3T1 - 0.57 MT. (i.e. Rs.4034/MT). Nos 6 2916.0804604316545 1
54 Station Beams 3B1 - 0.23 MT. Nos 3 1427.0329208633093 1
B.19 Mounting Structures: Equipments made out of fabricated galvanised angle iron, SM Rails for transformer plinth, cable mounting structures made out of channels and angles including Bolts & Nuts, tubular pipes, as per approved drawing. 2
55 For 33KV Isolators - 0.25 MT. (i.e. Rs.4034/MT) Set 5 1398.3893525179858 150
56 For 33KV Current Transformers - 0.0885 MT Set 9 532.9604402877698 500
57 For 33KV Voltage Transformers - 0.0885 MT Set 3 742.0597208633093 800
58 For 33KV Lightning Arrestors - 0.082 MT Set 9 501.4952402877698 200
61 For High P.I. Support with horizontal structure for fixing 3 nos. of 33KV Pin Insulator (Bolted type foundation) - 0.22MT Set 12 1143.3882302158274 600
B.20 11KV ODS: Beams out of channels 100x50mm with arrangements for stringing power conductor alongwith cleats, Bolts & Nuts painted with two coats of metal primer and aluminium paint, etc. complete 75
62 1B1 - 7.45 mtrs long wt 0.068MT (channels 100x50mm) Nos 24 368.3805151079137 75
63 1B2 - 4.0 mtrs long wt 0.036MT (channels 100x50mm) Nos 24 213.47491510791363 100
64 Angles 65x65x6 mm with clamps, Bolts, painted with two coats of metal primer and aluminium paint, etc. complete for 2.50 mtrs long for fixing 11KV GOS handle support. (0.010MT) Nos 18 100.68282014388491 100
B.21 BUSBAR Formation: 50
65 Main Bus for 33kV /Cross Bus for 11kV (all the three phases in a segment) with fixing of insulator spacers, levelling of string conductors to the required height above the equipment, including providing jumps to interconnect different segments of the main bus for Main Bus/Cross Bus as above using Single Lynx/Coyote Conductor. Per Bay 11 7711.540614780903 11
B.22 Erection of Grounding equipments 9
66 CI Pipes of 100 mm ID 13mm thickness, 2.75 Mtrs with 2 part clamp out of GI Flat 50x6mm contineously welded alround the pipe using cast iron welding electrodes as per drawing including the cost of excavation. Salt, Charcoal (as per approved R&D KPTCL drawing) Nos 40 3899.523669064748 43
B.23 Erection of Hardware Materials 10
67 Double Pole TC Set for 63kVA Star Rated Transformer (Including Erection of Poles 9Mtr RCC 145Kg WL). set 1 8406.146762589928 3200
B.24 LT Wiring (For Aux Transformer) Complete set 1 1956.146762589928 1300
B.25 LTAC Panel: 35
68 Indoor 415V with 100 A, MCCBs, Voltmeter, etc. Nos 1 3489.746762589928 85
69 Outdoor with fuse cutouts, etc., as per specifications. Nos 1 3489.746762589928
70 Indoor / Outdoor type each with necessary MCB for incoming and switch arrangements. Nos 2 3019.273381294964
B.27 Power Cable LT (Armoured) with glands/lugs/ferrules:
71 1.1kV PVC insulated 95 Sq.mm Aluminium Cable, 4 core Mtrs 150 37.47297841726619
72 1.1kV, 4 core 6Sq.mm Alluminium cable. Mtrs 500 33.08189352517985
B.28 Laying of Control Cable with Accessories: (With glands/lugs/ferruels)
B.29 Supplying heavy gauge PVC conduit pipe ....... dia ....... mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws.
79 19/20 mm dia 2 mm thick Mtrs 75 95.34595683453239
80 25 mm dia 2 mm thick Mtrs 100 106.60946762589928
81 32 mm dia 2.5 mm thick Mtrs 100 136.6094676258993
82 40 mm dia 2.5 mm thick Mtrs 50 197.61893525179858
B.30 Fixing of Name Boards:
83 Danger Boards Nos 11 169.54061478090253
84 Phase Plates for each Phase. Nos 9 184.94964028776974
85 Name plates for equipment/Earth pit Nos 43 105.88248285092855
86 Name plate for feeders and capacitor bank Nos 10 178.0946762589928
B.31 Earth mat formation:
87 Supplying and laying of 50x6mm MS flat, welding applying ACB paint to welded portion and covering with sodium bentonite clay, should be provided as per the drawing standard specifications and consolidated. Rmtr 3200 449.09404586330936
88 Grounding of equipments with 50x6mm GI flat, and connecting equipment to the earthmat/ground pit. Each point of earhing with all formation of works like bending ,twisting, drilling of holes and connecting by welding ( inclusive of all T&P and consumables) to the earthmat/ground pit point of connection. Rmtr 1300 372.72380520199226
89 Supplying & providing 450mm dia 450 mm height 1.5" to 2" thick hume pipe collar (non-pressure type) for earth pits including all lead and lifts etc., Nos 35 1691.284193216855
90 Providing 25mmdia M.S.rod 1.05 Mtr long earthmat spikes including hating, bending top 50 mm over lap flattening and making spike edge at one end driving into the earth below the ground level and welding the rod with ground mat flat. Nos 85 513.8699619128226
GULBARGA ELECTRICITY SUPPLY COMPANY LIMITED
Bill of Materials for "Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis”.
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR643/2026-27/46456-71 Dtd:20.08.2026.
Sl. No. Particulars Unit Qty. CSR 2025-26 Unit Rates with 10% OH + 10% CP + ASL/3 (Excl. GST) Total Amount
Supply Portion 33kV Line:
D.1 ACSR Conductors:
1 Coyote Conductor. Kms 35 159619.06583090377 35
2 Aluminium Binding Wire Mtr 400 25.668260204081633 400
3 Aluminium Tape Mtr 200 27.336520408163263 200
4 11Mtr Long Tubular Spun Pole -500Kg WL (Pre-Stressed) Nos 23 19579.413220940554 248
5 9.5Mtrs Long RCC Pole 350 Kg WL for DPs/TPs/FPs. Nos 248 12020.690742264649 20
6 9Mtrs Long RCC Pole 145Kg WL for Stud Poles. Nos 20 7564.565204081632 2
D.3 Isolators: 850
7 33KV, 800A, 31.5KA Class Double break Upright mounting type without earth switch. (Live point height 3750mm). set 2 81306.05204081633 160
D.4 Insulators: 25
8 33KV Polymeric Pin Insulators. Nos 850 907.9850636254502 25
9 33kV 70KN Polymeric Disc Insulators Nos. 0 260
10 33kV 90KN Polymeric Disc Insulators Nos. 160 566.9706505102041 260
D.5 Grounding of equiments: 260
11 GI Grounding Pipe B class, 42mm dia, 2.5Mtr long 3.2mm thick with bolts and nuts, GI strips & washers complete. Minimum weight of GI pipe=7.3Kg Nos. 25 1805.0921632653062 60
12 Bentonite Clay slurry for earthing. Kg 25 54.29216326530613 24
D.6 Hardware Materials: 1
13 33 KV Horizontal cross arm Nos 260 2498.5665541601256 100
14 33kV HT Single Top Support with bolts & nuts Nos 260 460.9665541601256 200
15 Clamp for 11Mtr Spun/9.5Mtr RCC Poles for 33kV Nos 260 122.56655416012558 1000
16 Fish plate with necessary clamps, bolts & nuts Nos 60 531.1217346938776 283
17 33 kv DP Set (2 Pole structure Kit) (Excluding poles) incl. 5Kg, 8SWG GI Wire for Structure grounding Set 24 7394.604336734694 283
18 33KV Four Pole Structures/Four DP Set. (Excluding poles) incl. 5Kg, 8SWG GI Wire for Structure grounding Set 1 30134.50408163265 150
19 Guy sets for 33kV line with 2Nos strain insulator complete Set 100 1224.6730408163266 150
21 Guarding set complete for Road/Telephone Line/b/w HT & LT Line crossing. Mtr 1000 94.26730408163266 283
22 Spiral earth electrode Nos. 283 241.15796495276555 3.646
22 Anti climbing devices (per pole 12mtr /kg) Nos. 283 91.15796495276555 0.2
D.7 Clamp for ACSR Conductor:
23 PG Clamps for Coyote to Coyote Nos 150 437.648693877551
24 Bolted type tension clamp Single Coyote ACSR Conductor 70/90KN 16mm. Nos. 150 1440.8486938775509
D.8 Name Boards:
25 Number Plates. Nos 283 159.55796495276556
26 Danger Boards/Caution Plates. Nos 283 159.55796495276556
D.9 M+6 Lattice Tower
27 M+6 Lattice Tower: Fabrication,Galvanizing and structures materials with stubs and all necessary matching material for Road Crossings ie.1.823 MT per Tower (2Poles*1.823MT=3.646MT) MT 3.646 127576.2236098828
28 Supply of Galvanised Bolts & Nuts. MT 0.2 137554.1204081633
GULBARGA ELECTRICITY SUPPLY COMPANY LIMITED
Bill of Materials for "Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis”.
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR643/2026-27/46456-71 Dtd:20.08.2026.
Sl. No. Particulars Unit Qty. CSR 2025-26 Unit Rates with 10% OH + 10% CP + ASL/3 (Excl. GST) Total Amount
Erection Portion 33kV Line:
E.1 Stringing of ACSR Conductors:
1 Coyote Conductor. Kms 35 14426.884193216854 35
E.2 Erection of Poles (Including excavation, Backfilling) 23
2 11Mtr Long Tubular Spun Pole - 500kG WL (Pre-Stressed) Nos 23 2760.1107288082576 248
3 9.5Mtrs Long 350 Kg working load RCC pole Nos 248 1702.9941401717338 20
4 9Mtrs Long 145Kg working load RCC pole Nos 20 1236.2473381294963 2
E.3 Erection of Isolators (33kV 800A): 2
5 Assembly, Errection alignment and wiring including movement from the point of unloading to the point of erection. (Upright). Set 2 1880.473381294964 25
6 Assisting in Testing and Commissioning (Upright) Set 2 682.8733812949639 260
E.4 Erection of Grounding equipments 24
7 GI Grounding Pipe B class, 42mm dia, 2.5Mtr long 3.2mm thick with bolts and nuts, GI strips & washers complete. Minimum weight of GI pipe=7.3Kg, Salt & Charcoal (Excl. Digging of Pits). Nos. 25 240.43787050359714 1
E.5 Erection of Hardware Materials 100
8 Horizontal cross arm including Single Top Support brace & insulator fixing with bolts & nuts. Set 260 277.2190260099613 100
9 DP Set (2 Pole structure Kit) (Excluding erection cost of poles) Set 24 2079.206115107914 1000
10 Four Pole Structure / (4Nos of DP Set) (Excluding erection cost of poles) Set 1 9100.946762589929 283
11 Guy sets for 33kV line with 2Nos strain insulator complete. (Excluding Digging of Pit) Set 100 339.40946762589925 283
12 Guy concreting materials with boulders mud & Sand. (300x300x450mm) No 100 267.40946762589925 283
13 Fixing Guarding including fixing of nessary cross arms set complete for Road/Telephone Line/b/w HT & LT Line crossings upto Span of 60Mtr. Per Set 1000 1106.14094676259 283
14 Spiral earth electrode Nos. 283 102.92490022116583 11.5
15 Anti climbing devices (per pole 12mtr /kg) Nos. 283 47.724900221165825 23
E.6 Fixing of Name Boards: 23
16 Number plates Nos 283 88.52490022116582 23
17 Danger Boards Nos 283 88.52490022116582 23
E.7 Check Survey: 248
18 33 KV line Check Survey Kms 11.5 3566.6214576165153 248
E.8 Digging / Base Concreting 11Mtr Spun Pole 248
19 Digging of Pit 2.5Mtrs Depth for Erection of 11Mtr Long Tubular Spun Pole. (Ordinary Soil). Each 0 248
20 Digging of Pit 2.5Mtrs Depth for Erection of 11Mtr Long Tubular Spun Pole. (Hard Soil). Each 23 4183.310728808257 20
21 Base concreting with CC 1:2:4. (1000x1000x150mm) Each 23 328.9107288082578 25
22 Pole Concreting with CC 1:2:4 (1000x1000x2500mm) Each 23 4844.510728808258 100
23 Coping of Poles. (390mm all alround the pole for an height of 300mm) (1130x1130x300mm) Each 23 770.5107288082578 3.646
E.9 Digging / Base Concreting 9.5Mtr RCC Pole 19.44
24 Digging of Pit 2.0Mtr Depth for erection of 9.5Mtr RCC Poles. (Ordinary Soil). Each 0 12.12 343.63987150081914
25 Digging of Pit 2.0Mtr Depth for erection of 9.5Mtr RCC Poles. (Hard Soil). Each 248 1348.9941401717338 0.98 7203.1497577448245
28 Coping of Poles. (150mm all alround the pole for an height of 300mm) (400x400x300mm) Each 248 99.79414017173357
E.10 Digging / Base Concreting 9Mtr RCC Pole
29 Digging of Pit 1.8Mtr Depth for erection of 9Mtr RCC Poles. (Ordinary Soil). Each 0
30 Digging of Pit 1.8Mtr Depth for erection of 9Mtr RCC Poles. (Hard Soil). Each 20 1257.8473381294964
E.11 Digging of Pit for GI Pipe type Earthing
31 Ordinary Soil. Each 0
32 Hard Soil. Each 25 3245.237870503597
E.12 Digging of Pit for Guy Set.
33 Ordinary Soil. Each 0
34 Hard Soil. Each 100 682.6094676258992
E.13 M+6 Tower Erection:
35 M+6 Lattice Tower Complete (2 Poles * 1.823MT = 3.646MT): sorting of tower parts made of fabricated angle iron,setting up of stubs templates,assembling & errection,tightening of bolt/nuts,revetting of tower bolt ends,welding. MT 3.646 10852.87645710091
E.14 Foundation of M+6 Tower (2Nos) :
a Excavation: (9.72 Cum per Tower) Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.. Depth exceeding 1.5m, but not exceeding 3 m Vol.1,Pg.No.5,It.No.1.4.2. (L=1.80, B=1.80, D=3.00) Cum 19.44 307.39861124433787
b Filling : (6.06 Cum per Tower) Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Vol.1,Pg.No.7,It.No.1.9 (L=1.80, B=1.80, D=2.85 (9.23) and L=1.50, B=1.50, D=0.45 (-1.01) and L=0.95, B=0.95, D=2.4 (-2.17)) Cum 12.12 343.63987150081914
c PCC : (0.49 Cum per Tower) Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates Vol.1,Pg.No.15,It.No.2.1.6 (L=1.80, B=1.80 & D=0.15) Cum 0.98 7203.1497577448245
d RCC : (3.45 Cum per Tower). Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately). M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Vol.1,Pg.No.15,It.No.2.2.3 (L=1.50, B=1.50, D=0.45 (1.01) and L=0.95, B=0.95, D=2.70(2.44)) Cum 6.9 6472.369096027524
e TMT Bars : (0.20 ton per Tower) Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Buildings Vol.1,It.No.2.11. t 0.4 91809.36690647482
GULBARGA ELECTRICITY SUPPLY COMPANY LIMITED
Bill of Materials for "Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis”.
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR643/2026-27/46456-71 Dtd:20.08.2026.
Sl. No Particulars Unit Qty/Km CDS-2 For Km CSR 2025-26 Material cost (Rs) with 10% OH + 10% CP + ASL/3 (Excl. GST) CSR 2025-26 Labour Cost Incl. Excavation (Rs) with 10% OH + 10% CP + ASL/3 (Excl. GST)
Qty Rate Amt Rate Amt
a b c = a*b d e = a*d
3 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for RCC poles) Set 1 691.9304081632653 367.6946762589928 10 10
4 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PSCC poles) Set 18 625.3072448979592 278.82748201438847 180 180
5 DP Structure with RCC Pole-9 Mtrs Long,145 kg WL (Incl. Cost of Poles) incl. 5Kg, 8SWG GI Wire for Structure grounding Set 1 21685.930408163265 5858.894676258993 10 10
6 11kV, 5KN Polymeric Pin Insulator (24mm Dia FRP Rod) Nos 57 236.37070891514497 570 60
7 11kV 45 KN Polymeric Insulator Nos 6 224.72173469387755 60 30.45
8 Guy Set Complete with No.15 strain insulator & Concreting materials Sets 6 1169.1217346938777 650.4824460431654 60 210
10 PG Clamps for Rabbit conductor Nos 6 134.72173469387755 60 60
12 EG Stirrups with GI wire lacing Set/2 No 19 279.512126745435 176.55235138205225 190 210
13 Guy concreting with Boulders, Mud and Sand Nos 6 192.32173469387757 92.48244604316548 60 2
14 Caution/Danger Board Nos 6 168.32173469387757 100.88244604316547 60
15 Anti Climbing Device (12mtrs GI Barbed Wire) each 21 91.97763848396502 48.88069886947585 210
16 11kV 200Amps Single Break GOS Polymer type insulator Set 1 2 11209.252040816325 1651.2733812949639 2
GULBARGA ELECTRICITY SUPPLY COMPANY LIMITED
Bill of Materials for "Establishing 2 X 5 MVA, 33/11 KV Sub-Station at Ballur(J) village in Aurad Taluka, Bidar District and Construction of 11.50Km of 33KV S/C line from 110/33/11kV Santhpur MUSS to proposed 33/11kV Ballur Sub-Station along with Construction of 10Km 11kV Link Lines on Total Turnkey Basis”.
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR643/2026-27/46456-71 Dtd:20.08.2026.
Sl. No. Particulars Unit Qty CSR 2025-26 Unit Rates with 10% OH + 10% CP + ASL/3 (Excl. GST) Total Amount
C1 Site Levelling and Construction of Retaining Wall
1 Levelling the yard to required R.L including cutting and transporting the excavated stuff to the place shown in for all types of soil and strata and filling the same wherever required including all lead, lift and labour etc.,complete. CMT 101.92019047619047 540
2 Levelling the yard to required R.L by filling with approved new earth including cost of all material spreading charges , labour etc., complete CMT 4320 433.86502380952385 4320
3 Construction of size stone masonry retaining wall in cement mortar (1:6) including cost of excavation and providing bed concrete (1:4:8) and pointing to the exposed faces with cement mortar (1:3) and providing weep holes with PVC pipes as per enclosed typical drawing and technical specification including cost of all material and labour etc., complete. CMT 7356.423630394268 395.415
C2 Cable Trenches and Road Crossing 40
4 RCC Cable duct: Providing and constructing RCC cable ducts using cement concrete M-20 grade concrete and Fe550 steel reinforecement including cost of excavation, providing bed concrete( 1:4:8) cable tray supports and cable trays etc., complete as per technical specification enclosed drawing etc., including cost of all materials, labour,etc., complete. 20
5 Providing and Laying RCC Hume pipe sub ducts using NP 2 class 150 mm dia Hume pipe including cost of excavation, laying charges and back filling wherever required as per technical specification and enclosed drawings including cost of all materials, labour, etc., complete. Rmt 25 535.1904000000001 10
6 Providing and Laying RCC Hume pipe sub ducts using NP 2 class 300 mm dia Hume pipe including cost of excavation, laying charges and back filling wherever required as per technical specification and enclosed drawings including cost of all materials, labour, etc., complete. Rmt 25 1188.5237333333334 2
7 KSRB 12-8.1: Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick f with cement mortar 1:4, CC 1:2:4 coping 75mm thk vol5 it.no 16.9 required as per technical specification and enclosed drawings including cost of all materials, labour, etc., complete. Nos. 10 5827.6854430992735 200
8 Cable Duct Road Crossing: Providing and constructing RCC cable ducts road crossing using cement concrete M-20 grade concrete and steel reinforcement including cost of excavation cable tray supports and cable trays etc., complete as per technical specification enclosed drawing etc., including cost of all materials, labour,etc., complete. Nos. 2 122594.53698143666 220
C3 Site surfacing (Jelly spreding) : Providing laying two layers of hard broken crushed metal/ jelly (granite/basalt/trap) as per the instruction of egineer incharge and layout of station yard. The first layer of jelly shall be of 20mm size spread and consolidated to a thickness of 50mm rolled as per specification achieve the surface suitable for spreading second layer of jelly. The second layer shall be of 25mm jelly spread to uniform thickness of 50mm course of layer including cost all materials and labour charges the jelly used shall be free from dirt or organic material. CMT 200 1791.6845142857148 1
C4 Security Fencing with Entrance Gate: 200
9 Providing and constrution security fencing for With gate the switch yard using RCC fencing poles and chain link mesh as per enclosed drawing and techincal specification including cost of Labour charge complete. Rmtr 220 4007.2038397534675 1
10 Providing and fixing MS Gate for the switch yard with a 1.25*2.40mtr wicket gate and a 5.00mtr *2.40mtr main gate fitted to RCC Columns structure as per enclosed norms and technical specifications including cost of labour and materials etc complete No 1 165105.74870056502 160
11 Providing and constrution Area fencing for the Sation area using RCC fencing poles and G I Barbed wire as per enclosed drawing and techincal specification including cost of Labour charge complete. Rmt 200 1045.125192251816 220
C5 Control Room Building : 1
12 Design, engineering and construction of Control Room building of size 17.25m x 7.50m with column structure including necessary treatement to sub soil if necessary depending upon the soil condition including providing internal water supply arrangements, electrification to the control room building providing sanitary arrangements and internal cable ducts with cost of all materials, labour, etc., complete. Unit 1 3703654.6833252627 1
C6 Road Works : 1
13 Formation of approach road: Providing and forming 5 mtr wide Cement Concrete Road including providing walk ways, fixing RCC kerb stones, as per technical specification, layout and sectional detailed drawing etc., complete in all respect. Rmtr 160 10578.884294995965 1
C7 Storm Drainage System : 6
14 Storm water drainage system: Providing and construcution of storm water drainsin M20 RCC including earth work excavation, bed concrete (1:4:8) with as per the technical specification and enclosed drawings including cost of all materials, labour etc., complete. as per egineering incharge Rmtr 220 1419.8430649350653 9
15 Culverts across approach Road: Providing and constructing RCC hume pipe culvert using 750mm dia NP- 3 class pipe,( two rows ) with RCC wing walls of M-20 ( 1:1.5:3) grade concrete including earth work excavation, bed concrete (1:4:8) plastering to exposed faces with cement mortar (1:4) 12 mm thick as per technical specification and enclosed drawing. No 1 94245.41778853915 9
C8 Water Supply : 6
16 Providing water supply for the substation including drinking water and water for fire fighting system and earthing pits with borewell, sinking and erection of submersible pump set and drawing pipe line from bore well to over head Sinthetic tank and providing distribution system inside the station yard servicing the pump set etc., complete. Unit 1 318839.8729943504 6
C9 Construction of baffle wall with RCC columns M-20 and brick masonry in cm 1:6 including plastering and painting etc as per design and drawing No 1 288225.39357546414 3
C10 Oil Sump Pit: Providing and construction of Oil Sump Pit as per technical specifications design and drawing including cost of materials and labour size (3.0x4.0x2.0Mts) Nos. 1 230449.01746569815 2
C.11 Mounting Structure/Station tower Foundation: Construction of RCC footings/padestals using M25 grade concreate Fe550D stell reinforcement including cost of excavation, providing bed concreate (1:2:4) and back filling with a suitable earth for all the works as per technical specification works , enclosed drawings incuding cost of all materials, labour etc complete for the following station towers and mounting structures. 6
17 Tower 33 KV ( vertical 3T1) Nos 6 70748.95112187248 3600
18 33 KV CT support structure Nos 9 3408.197707828894 2
19 33 KV surge arrestor support structure Nos 9 4229.343793381759 1
20 33 KV pedestal insulator support structure Nos 6 3987.457982243745 3
21 33KV isolator support structure Nos 6 6293.979370460048 2
22 33 KV Voltage transformer support structure Nos 3 3984.9805326876517 388.8
23 11 KV NCT support structure Nos 2 6290.380403551252
24 11kv High PI for road crossing Nos 6 3987.457982243745
C.12 Antiweed Treatment :
25 Providing and supplying all labour material equipments etc. required for soil sterilization, antiweed treatment including excavation, mixing / injecting chemicals to achieve the guaranteed effectiveness of treatment at least up to three years, rolling, dressing, compacting the excavated earth within substation areas as per technical specification. Smtr 3600 119.0380285714286
C.13 Transformer foundation and associated rail track: Design engineering supply of labours, materials and construction of tranformer foundations by providing all associted works rail tracks,jacking pads,anchor blocks RCC,PCC,Structural steel including MS grouting, gravel filling pylon support system and other items not mentioned here in but required for the completion of the work. Nos 2 200677.1116384181
C.14 63 KVA,11KV/433 VLT distribution transformer:Design engineering supply of labours, materials and construction of tranformer plat form of size 1.50mx1.50mx1.20m above FGL and 1.20mx1.20mx1.0m below FGL in size stone masonry (1:6) including excavation laying coping concrete 1:2:4 and pointing exposed faces in CM 1:3 etc, complete. Nos 1 40067.49204196934
C.15 SF6 circuit breaker foundation: Design engineering supply of labours, materials and construction of 33KV SF6 circuit breaker foundation by providing all associted works RCC,PCC, steel reinforcement including MS grouting, gravel filling and other items not mentioned herein but required for the completion of the work. Nos 3 74166.00555286522
C.16 Foundation for porcilain clad 11KV VCB switch gear outdoor type: 350MVA each with 1IC+4F+1CB+1AP3 PCVCB as per approved design engineering supply of labours, materials and construction of foundation by providing all associted works RCC,PCC ,steel reinforcement including MS grouting, gravel filling and other items not mentioned here in but required for the completion of the work. Set 2 79570.05756255043
C.17 Earth mat formation:
26 Excavation formation,refilling (eartmat design area 60mx50m is considered with 5m spacing between the adjacent earth flats approximately as per MS flat annexure) However during the execution,actual earthmat design has to be obtained from SEE R&D KPTCL Cum 388.8 251.61137566137566
Total Project Cost
Gulbarga Electricity Supply Company Limited
Bid Enq. No:GESCOM/CEE(O)/SEE(Proj)/EEE(Proj)/AEE/AE-2/Ballur/TTK/BIR 643/2026-27/46456-71 Dtd:20.08.2026.
Bidder's Name & Address along with GSTIN Number :
A. EXISTING COMMITMENTS AND ON GOING WORKS WITH GESCOM AND OTHER UTILITY :
Sl. No. Name of the Project Description of the work Name of the utility Contract No. & date Contract Value in Rs. Lakhs Stipulated date of completion as per contract Voltage (in KV) Present Progress / Status of work *** Value of works remaining to be completed in Rs.Lakhs Anticipated date of completion Remarks
% Physical Progress % Financial Progress
*** Note : Documentary Proof in support of the Value of works remaining to be completed (i.e for Column- 11) in the above table) shall be uploaded in the form of certificates issued by not below the rank of the Executive Engineer or Equivalent of the concerned utility.
NOTE : Please Note that the Value of works remaining to be completed shall be considered based on the financial progress of the work.
B. WORKS FOR WHICH TENDERS ALREADY SUBMITTED :
Sl. No. Name of the Project Description of the work Name of the utility Estimated Value of the work in Rs. Lakhs Stipulated period of completion date when decision is excepted Remarks if any.
Date Printed Name
Place Designation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
15 Techno Commercial Sheet Ballur SS.xls
Tender Document • 0.07 MB
14 Specification for Works.doc
Tender Document • 0.04 MB
6 SCC Ballur SS.docx
Tender Document • 0.07 MB
Drawing Civil Electric.zip
Tender Document • 60.96 MB
7 Credit Certificate Annexure-A.doc
Tender Document • 0.06 MB
4 ECC Ballur SS.docx
Tender Document • 0.06 MB
12 GTC.doc
Tender Document • 0.37 MB
11 DTC.doc
Tender Document • 2.52 MB
RCC Pole Drawings.zip
Tender Document • 6.63 MB
17 EMD Declaration form.doc
Tender Document • 0.03 MB
13 Civil Work Technical Specification.doc
Tender Document • 0.23 MB
9 NLFL Losses Ballur SS Annexure C.doc
Tender Document • 0.05 MB
10 BOQ Ballur.xls
Tender Document • 0.27 MB
8 Ongoing works Annexure B.xlsx
Tender Document • 0.01 MB
3 ITB Ballur SS.docx
Tender Document • 0.06 MB
16 Annexures.doc
Tender Document • 0.10 MB
5 GCC Ballur SS.doc
Tender Document • 0.18 MB
Drawings.zip
Tender Document • 13.21 MB
1 NIT Ballur SS.docx
Tender Document • 0.03 MB
2 IFB Ballur SS.docx
Tender Document • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .