Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAdmitted-Finance RZ 151 BLOCK Y NEW ROSHANPURA PAPRAWAT ROAD NAJAFGARH SOUTH WEST DELHI DELHI 110043 | WEST DELHI | DELHI | 110043 | ₹4.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.0 Cr+₹88.0 L (21.2%)Admitted-Finance 06 KHASRA NUMBER 56 KIRAN NAGAR BASNI JODHPUR JODHPUR RAJASTHAN 342001 UDYAM RJ 22 0002214 | JODHPUR | RAJASTHAN | 342001 | ₹5.0 Cr+₹88.0 L (21.2%) | L2 | Admitted-Finance |
| 3 | L3₹5.2 Cr+₹1.0 Cr (25.3%)Admitted-Finance | ₹5.2 Cr+₹1.0 Cr (25.3%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MODERN CONCEPT CONSTRUCTIONS L1 | New India Engineers L2 | SAS INFRA L3 |
|---|---|---|---|---|---|---|
| 1.00Civil Work | ||||||
| 2.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||||
| 3.00 | All kinds of soil. | 17 | cum | 101 ₹1,717 Lowest | 350 ₹5,950 | 150 ₹2,550 |
| 4.00Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m: | ||||||
| 5.00All kinds of soil | ||||||
| 6.00 | Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 194 | metre | 131 ₹25,414 Lowest | 200 ₹38,800 | 250 ₹48,500 |
| 7.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. | 237 | cum | 45 ₹10,665 Lowest | 100 ₹23,700 | 130 ₹30,810 |
| 8.00Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | ||||||
| 9.00 | All kinds of soil | 1,186 | sqm | 5 ₹5,930 Lowest | 100 ₹1,18,600 | 25 ₹29,650 |
| 10.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | ||||||
Tender Value
₹6.6 Cr
EMD Value
₹13.3 L
Closing Date
8 Jul 2025, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer (Civil Division-III), Room No- MZ-137, Main Building, IIT Delhi, Hauz Khas, New Delhi-110016
Renovation, modifications, Recasting of roof slab and Retrofitting of 36-nos. B-Type houses (Block, B-2, B-7, and B-15) in the East campus area at IIT Delhi.
2025_IIT_864263_1
IITD/WORKS (SP-5028)/2025
Open Tender
Civil Works
Works
600 days
Indian Institute of Technology Delhi Hauz Khas
As per tender documents
15 documents required · 15 mandatory
₹0
₹13.3 L
15 Jul 2025
12 Jun 2025
9 Jul 2025
12 Jun 2025
8 Jul 2025
12 Jun 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | - | - | - |
| 3 | All kinds of soil. | 17 | cum | - | - |
| 4 | Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m: | - | - | - | - |
| 5 | All kinds of soil | - | - | - | - |
| 6 | Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 194 | metre | - | - |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. | 237 | cum | - | - |
| 8 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | - | - | - | - |
| 9 | All kinds of soil | 1,186 | sqm | - | - |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_908614.xls
BOQ • 0.42 MB
BOQ.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .