Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.9 LAccepted-Finance | L1 | Accepted-Finance Due to quoted lowest rates | |
| 2 | L2₹69.2 L+₹6.3 L (9.98%)Rejected-Finance PLOT NO DSS 170 HUDA SHOPPING COMPLEX SECTOR 31 FARIDABAD FARIDABAD HARYANA FARIDABAD HARYANA 121003 | FARIDABAD | HARYANA | 121003 | L2 | Rejected-Finance Due to quoted high rates | |
| 3 | L3₹70.4 L+₹7.5 L (11.9%)Rejected-Finance E 2 216 GROUND FLOOR SHIV RAM PARK NEAR LUCKY GARDEN NANGLOI NEW DELHI 110041 | WEST DELHI | DELHI | 110041 | L3 | Rejected-Finance Due to quoted high rates | |
| 4 | L4₹71.3 L+₹8.4 L (13.3%)Rejected-Finance | L4 | Rejected-Finance Due to quoted high rates | |
| 5 | L5₹71.4 L+₹8.5 L (13.6%)Rejected-Finance 301 VARDHAMAN CHAMBER II VIKASPURI NEW DELHI 110018 | WEST | DELHI | 110018 | L5 | Rejected-Finance Due to quoted high rates |
Tender Value
₹91.6 L
EMD Value
₹1.8 L
Closing Date
19 May 2020, 3:00 pmClosed
Manager Electrical
Manager Electrical, Hall no.7 ,ITPO office Pragati Maidan New delhi
Optimization of air conditioning system at ITPO Pragati Maidan,New Delhi.
2020_ITPO_557799_2
169 ITPO-(1)/E-E/20-21/1993
Open Tender
Electrical Works
Item Rate
90 days
ITPO Pragati Maidan New delhi
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
Yes
ITPO
₹1.8 L
Yes
Room of DGM (Electrical),Security building
20 Jul 2020
9 May 2020
20 May 2020
9 May 2020
19 May 2020
13 May 2020
13 May 2020
SH-1(Design and Installation)
Study and Design for combining Carrier make 4x450TR ,York make 2x300TR and Trane make 3x250TR HVAC plants with preparation of Concept design,SLD,calculation of sizes and other specifications for Chilled water header and line,condenser water header and line,de-coupled line,Chilled water line from Carrier plant to existing York Plant and Trane Plant rooms,Pumps,Valves with all accessaries etc. for the scheme so as to achieve optimized life cycle cost with better utilization of standby capacity available at Carrier plant.
Providing, installation,Testing and commissioning following euipments with all necessary activities/works complete in all respect as per the design submitted vide item No 1 of this work and approved by competent authority etc. as required.
CHWP 800 GPM suitable head in York Plant room
200 mm NRV for CHWP
200 mm Butterfly Valve for CHWP
200 mm Y Strainer for CHWP
SITC of following sizes of MS "C" Class Pipe/valves complete with all filltings, Support duly insulated,wherever required suitable deep excavation and refilling of trench with making good the damages, PUF Insulation ( 32kG/m3 ) alongwith Fibre Glass & StarBond Shall also be used for external application whereas Nitrile Rubber / XLPE ( 32mm ) shall be used for internal application complete etc as required.
SITC of following size of CHW Pipe at required location
450 mm dia 7mm thick CHW Pipe
300 mm dia 7mm thick CHW Pipe
250 mm dia 6.35mm thick CHW Pipe
200 mm dia 6.35mm thick CHW Pipe
150 mm dia 6.35mm thick CHW Pipe
SITC of following size of CHW Pipe at required location
150 mm Plant Isolation Valve
200 mm Plant Isolation Valve
250 mm Plant Isolation Valve
350 mm Plant Isolation Valve
SITC of Balancing Valve
250 mm Balancing Valve for Plant
350 mm Balancing Valve for Plant
SITC of following size of Condenser Pipe at required location.
500 mm, 7mm thick CWP Pipe
300 mm, 7mm thick CWP Pipe
200 mm, 6.35mm thick CWP Pipe
100 mm, 6.35mm thick CWP Pipe
Starter Panel for York Plant CHW Pump
Temperature Gauge
Pressure Gauge
Automatic Purge Valve
25mm Drain Valve
Shifting of 2 Nos Trane Chillers alongwith Electrical Panel, CHWP, CWP etc. including dismentalling and re-installation by Providing and Making suitable Foundations,antivibration arrangements,Electrical Connections for Chillers,Pumps etc. by providing suitable size and length cables,end terminations etc. and Recommissioning of Chillers,pumps etc. as an integral part of the scheme.
Shifting & Reinstallation,Recommissioning of Cooling Tower for Trane Chillers along with Electrical Panel etc. including dismentalling and re-installation by Providing and Making suitable Foundations,Electrical Connections etc. by providing suitable size and length cables,end terminations, repair inclding replacement of brocken header,nozels,other accessaries etc. complete as required.
Recommissioning,resetting,balancing of entire system in integrated mode including providing data such as chilled water,condenser water flow rates,operating points for varios equipments,doing seasonal tests during summer and Monsoon etc. complete as required.
SH-2(Dismantling and buyback)
Dismantling and buyback of following equipment with accessaries including making good the damages etc as required.
Buy-Back (ie minus)Amount of Trane Chiller.
Buy-Back (ie minus) Amount of Trane Primary CHWP.
Buy-Back (ie minus) Amount of Trane CWP.
Buy-Back (ie minus)Amount of York Chiller.
Buy-Back (ie minus) Amount of York Primary CHWP.
Buy-Back (ie minus) Amount of York CWP.
Buy-Back (ie minus) Amount of York Elect Panel
Buy-Back (ie minus) Amount of CT, Piping, Valves & Accessories
S G TECHNOFAB PVT LTD
Supertech Engineers
Accurate Engineers
Arctic Engineering Services
SHES Air And Automation
swastik airconditioning co
snowmex engineers ltd
Powermech Services Private Limited
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .