| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-Finance | L1 | Accepted-Finance Accept | |
| 2 | L2₹7.6 L+₹7,083.87 (0.94%)Accepted-Finance | L2 | Accepted-Finance Accept |
Tender Value
₹7.7 L
EMD Value
₹8,000
Closing Date
18 Jul 2023, 3:00 pmClosed
Block Development Officer (V.P)
The Block Development Office Shoolagiri
Krishnagiri District Shoolagiri Block under AGAMT - II - 2023-24 Construction of Drain 2Nos in Maruthandapalli Panchayat Package No 2023_2024_SGI_14
2023_RDTN_340751_1
RocNo_8254_2022_R10
Open Tender
Civil Works
Item Rate
180 days
The Block Development Office Shoolagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,000
Yes
The Block Development Office Shoolagiri
21 Jul 2023
11 Jul 2023
18 Jul 2023
11 Jul 2023
18 Jul 2023
11 Jul 2023
14 Jul 2023
Amount
1.Construction of Drain From Chinnathambi house to Saraswathi House Third Street @ Millath nagar H/O Maruthandapalli.(75.60 mtr).Est Amt Rs:-3.00 Lakhs.
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Provision For Writing Name Board Charges
2.Construction of Drain From OHT to Srinivasan House First Street @ Elasepalli H/O Maruthandapalli (118 mtr).Est Amt Rs:-4.66 Lakhs.
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Drain
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Provision For Writing Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SAKTHI CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .