Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.4 LAdmitted-Fee/PreQual/Technical/Finance | -27.10% | ₹28.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹29.6 L+₹1.2 L (4.25%)Admitted-Fee/PreQual/Technical/Finance | -24.00% | ₹29.6 L+₹1.2 L (4.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹29.9 L+₹1.5 L (5.45%)Admitted-Fee/PreQual/Technical/Finance | -23.13% | ₹29.9 L+₹1.5 L (5.45%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹34.6 L+₹6.3 L (22.1%)Admitted-Fee/PreQual/Technical/Finance | -11.00% | ₹34.6 L+₹6.3 L (22.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Incomplete documents |
Tender Value
₹38.9 L
EMD Value
₹1.2 L
Closing Date
3 Aug 2026, 6:00 pmClosed
XEN PHE DIVISION SHOPIAN
PHE Division Shopian
Improvement Upgradation of water supply system to village Zreken by way of extension of RWM and Construction of PST and Chain Link Fencing for WSS Zreken under ABDP
2026_PHE_316921_3
13/JSDS 2026-27
Open Tender
Civil Works - Water Works
Percentage
XEN PHE DIVISION SHOPIAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
XEN PHE DIVISION SHOPIAN
₹1.2 L
24 Aug 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge. All kinds of soil : | 226.44 | cum | 187.3 | ₹42,412.21 |
| 1.1 | By Mannul Means | 22.64 | cum | 592.9 | ₹13,423.26 |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil | 56.61 | cum | 89.75 | ₹5,080.75 |
| 3 | Providing and laying of stone soiling hand packed including all carriages involved upto site of work. | 21.65 | cum. | 1,320 | ₹28,578 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 14.43 | cum. | 5,202.9 | ₹75,077.85 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 23.28 | cum | 7,788.4 | ₹1,81,313.95 |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 39.69 | cum | 9,395.7 | ₹3,72,915.33 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.06 | cum | 9,821.85 | ₹20,233.01 |
| 8Centering and shuttering including strutting, propping etc. and removal of form work: | |||||
| 8.1 | Foundations, footings, bases for columns | 106.15 | sqm | 286.35 | ₹30,396.05 |
stage.html
html • 0.03 MB
finance_1036502.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_1036502.xls
BOQ • 0.28 MB
NIT.pdf
Tender Documents • 0.51 MB
Corrigendum2.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .