Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | -1.00% | ₹2.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.9 L+₹2,934.24 (1.01%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹2.9 L+₹2,934.24 (1.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹5,860
Closing Date
13 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Fencing of Block Development Office Badugam Pyt Badugam Block Tulail
2026_PWDJK_319294_6
(REW) E-NIT No 06 of 2026-27 EE-RnB-Grz-4445-54 E-tendering Dated-03-08-2026
Open Tender
Civil Works
Percentage
30 days
Gurez
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer RnB Division Gurez
₹5,860
Executive Engineer RnB Division Gurez
17 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 31.88 | Cum | 479.3 | ₹15,280.08 |
| 2 | Providing/laying stone soling hand packed ramming dressing in trenches including carriages complete job. | 19.16 | Cum | 1,200 | ₹22,992 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 with 20% plum | 18.38 | Cum | 5,733.65 | ₹1,05,384.49 |
| 3.01 | plum @ 20% | 4.59 | Cum | 1,200 | ₹5,508 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for: | 28.16 | sqm | 286.35 | ₹8,063.62 |
| 5 | Supplying at site angle Iron posts of required size including bottom to be split and bent at right angle in opposite directions for 10cm length | 553.46 | kg | 120.8 | ₹66,857.97 |
| 6 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge, Made of G.I. wire of dia 4 mm | 56.32 | sqm | 809.9 | ₹45,613.57 |
| 7 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc complete, steel work | 28.16 | sqm | 197.8 | ₹5,570.05 |
| 8 | Disposal of excavated mulba and felling of trees, cutting of branches, removing of roots incl. H/Load etc. | 1 | Job | 4,000 | ₹4,000 |
| 9 | Carriage of materials from nearest source Stone aggregate from 15 kms | 16.54 | Cum | 344.49 | ₹5,697.86 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_1056928.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .