| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | ₹9.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.4 LRejected-AOC | ₹11.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Vinoth Constructions L1 | KS & Co L2 |
|---|---|---|---|---|---|
| 1.01Construction of Drainage and Verical Filter at Colony Kakkan street in V.Sathanur anchayat | |||||
| 1.02Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | |||||
| 1.03 | 0-0.30m | 243 | Sqm | 238 ₹57,834 | 400 ₹97,200 |
| 1.04 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. | 27 | Cum | 5,504.7 ₹1.5 L | 6,500 ₹1.8 L |
| 1.05 | Cement Concrete 1:2:4 mix using 20 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed. | 51.84 | Cum | 6,889.84 ₹3.6 L | 8,000 ₹4.1 L |
| 1.06Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, | |||||
| 1.07 | below | 324 | Cum | 516.5 ₹1.7 L | 516.5 ₹1.7 L |
| 1.08Providing veritical filter | |||||
| 1.09 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations . | 43.26 | Sqm | 246.52 ₹10,664.46 | 246.52 ₹10,664.46 |
| 1.10 | Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete | 0.55 | Cum | 5,504.7 ₹3,027.59 | 5,504.7 ₹3,027.59 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
30 Sept 2025, 3:00 pmClosed
BDO BP
PANCHAYAT UNION, VIKRAVANDI
VIK/NNT-2025-26/SATHANUR
2025_RDTN_605581_1
VIK/NNT-2025-26/SATHANUR
Open Tender
Civil Works
VIKRAVANDI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,000
Yes
19 Dec 2025
18 Sept 2025
30 Sept 2025
18 Sept 2025
30 Sept 2025
18 Sept 2025
Amount
Construction of Drainage and Verical Filter at Colony Kakkan street in V.Sathanur anchayat
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Cement Concrete 1:2:4 mix using 20 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels,
below
Providing veritical filter
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations .
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Filling the Vertical Filter with following materials as per specification
225mm Boulders
40mm metal
20mm metal
10-12mm metal
Towards Cost and Supply of RCC Ring
Towards Cost and Supply of RCC Cover Slab
Towards Cost and Supply of Precast Slab
Towards labour charges for filling metal into the pipe and fixing PVC pipe
Provision for Name board charges
Provision for photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KS & Co (BID ID -1466235)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_723863.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid