Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L | L1 | Accepted-AOC WORK ORDER ISSUED |
| 2 | L2₹4.0 L+₹12,170.17 (3.17%)Rejected-Finance | ₹4.0 L+₹12,170.17 (3.17%) | L2 | Rejected-Finance NOT L1 BIDDER |
| 3 | L2₹4.0 L+₹12,170.17 (3.17%)Rejected-Finance | ₹4.0 L+₹12,170.17 (3.17%) | L2 | Rejected-Finance NOT L1 BIDDER |
| 4 | L2₹4.0 L+₹12,170.17 (3.17%)Rejected-Finance | ₹4.0 L+₹12,170.17 (3.17%) | L2 | Rejected-Finance NOT L1 BIDDER |
| 5 | L2₹4.0 L+₹12,170.17 (3.17%)Rejected-Finance | ₹4.0 L+₹12,170.17 (3.17%) | L2 | Rejected-Finance NOT L1 BIDDER |
Tender Value
₹3.9 L
EMD Value
₹7,852
Closing Date
17 Jul 2026, 2:00 pmClosed
AE
138, AJC BOSE ROAD, KOLKATA -14
NRS MEDICAL COLLEGE ADHOSPITAL DAY TO DAY MAINTENANCE AND REPAIR FOR WATER SUPPLY UNDERGROUND MAIN LINES WITH RISER LINE INCLUDING HEADERS CONTROLLING VALVES ETC
2026_WBPWD_5016227_5
WBPWD/AE/NRSH/NIT-04/2026-27
Open Tender
CIVIL WORKS
Percentage
365 days
NRSMC and H
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,852
Yes
10 Aug 2026
2 Jul 2026
20 Jul 2026
2 Jul 2026
17 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specifications Clause 202 for Rural Roads of MORD. | |||||
| 1.01 | By Manual Means | - | - | - | - |
| 1.02 | Bituminous Courses | 0.86 | CuM | 744.88 | ₹640.6 |
| 1.03 | Granular Courses | 1.73 | CuM | 539.89 | ₹934.01 |
| 2Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. . | |||||
| 2.01 | (a) Depth of excavation not exceeding 1.500 mm. | 2.59 | %CUM | 14,214.6 | ₹36,815.81 |
| 3 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 1.2 | SQM | 430.24 | ₹516.29 |
| 4Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes. | |||||
| 4.01 | (a) Pakur Variety. | 0.58 | CUM | 6,265.54 | ₹3,634.01 |
| 5 | (B) Filling in foundation or plinth by fine sand in layers not exceeding 150 mm. as directed and consolidating same by thorough saturation with water ramming complete . Including the cost of supply of sand .(payment to be made on measurement of finished quantity). | 4.61 | %CUM | 1,56,976.75 | ₹7,23,662.82 |
stage.html
html • 0.12 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
2911ii.pdf
Tender Documents • 0.50 MB
BOQ_5085513.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .