Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹637.2 CrAccepted-Finance | ₹637.2 Cr | L1 | Accepted-Finance ok |
| 2 | L2₹745.9 CrAccepted-Finance PLOT NO B 1 INFOCITY SECTOR 34 GURGAON HARYANA 122004 | GURUGRAM | HARYANA | 122004 | ₹745.9 Cr | L2 | Accepted-Finance ok |
Tender Value
Refer Docs
EMD Value
₹4.5 Cr
Closing Date
26 Apr 2022, 11:00 amClosed
EE(SDW)XII
Sewage treatment Plant Sector 25 Rohini
Augmentation/ Up-gradation of various existing STPs at Najafgarh, Keshopur Ph-II and Keshopur Ph-III in Delhi (Package-2)
2022_DJB_216611_1
Press NIT 19
Open Tender
Miscellaneous Works
4380 days
Executive Engineer (SDW)XII
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
Account No.50448339804
₹4.5 Cr
KESHOPUR
31 May 2022
11 Feb 2022
26 Apr 2022
11 Feb 2022
26 Apr 2022
12 Feb 2022
23 Feb 2022
Augumentation/Up-gradation of existing capacity of 05 MGD Sewage Treatment Plant at Najafgarh to achieveing treatment effluent parameter BOD/TSS<10 ppm/10 ppm along with operation and maintenance for 12 years.Fixed @ 1.5 crore per MGD
Interim O& M Charge
O & M charges for the Najafgarh 05 MGD and Associated Infrastructure.
Gaurantee Energy Consumption for Njafgarh 05 MGD STP for Treatment Purpose . Per MGD cost for BOD from 100mg/l and upto 150 mg/l . Gauranteed Energy Consumption for the Njafgarh 05 MGD STP(Note : - Bidder is required to quote the Gauranteed Energy Cosumption in kvah/MGD).The value shown is quantity is computed as :-(365*15 year X(Power Unit Rate)( 365*15*8.0)
Per MGD cost for BOD from 150mg/l and upto 200 mg/l
Per MGD cost for BOD from 200mg/l and upto 250 mg/l
Gaurantee Energy Consumption for Njafgarh 05 MGD STP associated Infrastructure
Augumentation/Up-gradation of existing capacity of Keshopur Ph-II 20 MGD to achieveing treatment effluent parameter BOD/TSS<10 ppm/10 ppm along with operation and maintenance for 12 years.Fixed @ 1.5 crore per MGD
Interim O& M Charges
O & M charges for the first month for Keshopur Ph-II STP and Associated Infrastructure.
Gaurantee Energy Consumption for Keshopur Ph-II 20 MGD STP for Treatment Purpose . Per MGD cost for BOD from 100mg/l and upto 150 mg/l . Gauranteed Energy Consumption for Keshopur Ph-II 20 MGD STP(Note : - Bidder is required to quote the Gauranteed Energu Cosumption in kwh/MGD).The value shown is quantity is computed as :-(Flow (MGD) In the STP)X365*15X(Power Unit Rate)( 365*15*8.0)
Per MGD cost for BOD from 150mg/l and upto 200 mg/l
Per MGD cost for BOD from 200mg/l and upto 250 mg/l
Gaurantee Energy Consumption for Keshopur Ph-II 20 MGD STP associated Infrastructure
Augumentation/Up-gradation of existing capacity of 60 MGD Sewage Treatment Plant at Keshopur Ph-III 2 to achieveing treatment effluent parameter BOD/TSS<10 ppm/10 ppm along with operation and maintenance for 12 years.Fixed @ 1.5 crore per MGD
Interim O& M
O & M charges for the first month for 60 MGD Sewage Treatment Plant at Keshopur Ph-III and Associated Infrastructure.
Gaurantee Energy Consumption for 60 MGD Sewage Treatment Plant at Keshopur Ph-III for Treatment Purpose . Per MGD cost BOD from 100mg/l and upto 150 mg/l . Gauranteed Energy Consumption for the Keshopur Ph-III 60 MGD STP(Note : - Bidder is required to quote the Gauranteed Energu Cosumption in kwh/MGD).The value shown is quantity is computed as :-(Flow (MGD) In the STP)X365*15X(Power Unit Rate)( 365*15*8.0)
Per MGD cost for BOD from 150mg/l and upto 200 mg/l
Per MGD cost for BOD from 200mg/l and upto 250 mg/l
Gaurantee Energy Consumption for 60 MGD Sewage Treatment Plant at Keshopur Ph-III associated Infrastructure
Subhash Infraengineers Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid