| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | L1 | Accepted-AOC Lowest I | |
| 2 | L2₹9.4 L+₹31,332 (3.44%)Rejected-Finance RAHIMPUR VILLAGE BIJNOR DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | 246701 | L2 | Rejected-Finance L2 Lowest | |
| 3 | L3₹9.7 L+₹58,626 (6.44%)Rejected-Finance | L3 | Rejected-Finance L3 Lowest | |
| 4 | L4₹9.7 L+₹60,201.77 (6.61%)Rejected-Finance | L4 | Rejected-Finance L4 Lowest | |
| 5 | L5₹9.8 L+₹65,162 (7.15%)Rejected-Finance | L5 | Rejected-Finance L4 Lowest |
Tender Value
₹11.5 L
EMD Value
₹23,000
Closing Date
19 Aug 2024, 3:00 pmClosed
EE EGCCDiv.6 Najibabad
EE EGCCDiv.6 Najibabad
Reconstruction of VRB at km. 2.456 of Budhawala Distributary.
2024_UPIDC_945647_5
02/EE/2024-25
Open Tender
Civil Works - Canal
Item Wise
180 days
Dhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹267
₹23,000
21 Dec 2024
13 Aug 2024
20 Aug 2024
13 Aug 2024
19 Aug 2024
13 Aug 2024
13 Aug 2024 - 19 Aug 2024
Amount
Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches
Laying C.C 1:3:6 in foundation using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Laying C.C 1:6:12 in foundation using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Brick work (M-105 and Above) in 1:4 cement & sand mortar including cost of all Material, Labour, T&P etc complete. (Per Cum)
Ordinary Centering & shuttering of Plywood or steel for RCC Work
Laying R.C.C 1:1:2 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Laying C.C 1:1.5:3 using size 4-20 mm graded crushed aggregate including all cost of material, labour , T&P etc. for completion of work per cum.
Supply & Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge.
Cement Pointing (Struck deep) in 1:2 C:M on brick masonry i/c cost of all material, labour, T&P etc complete (Per SqM)
S/F 60 cm. long 50 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge.
Earth work in fiiling for Making ramp in all type of soil for strengthning of banks and rain cuts with all lift & lead up to 600 m. with all dressing ramming proper compaction upto required level & slope i/c cost of earth all taxes, labour, T&P etc. complete.
Earthwork in filling for Making road diversion including all costs of T&P material required for proper completion of work as directed Engineer-in -charge.
Laying brick soling layer on prepared sub-grade with brick on edge accoridng to lines, graded and cross section shown on the drawing filling joints with sand and earth, spreading 25mm thick layer of earth over brick soiling, watering and rolling the same with three wheel road roller 80-100 KN as per MORD Technical Specification Clause 412.
Finishing wall with two coat of water proof cement paint Weather coat of approved quality on new surface with this paint to give an even shade including supply of all marerials, labour, Tools & plant etc. required for proper completion of the work.
Supply & Fixing of Wheelguard stone including cost of all material ,labour and T&P etc. Complete
Letter Writing of height 20 cm at Pucca Structures Including Cost of Material Labour T&P Etc Complete required for proper completion of Work
Providing and Fixing expansion joint in slab including cost of all material (M.S. Angle ISA 50X50X6 and Ply Board) cutting, welding, labour and T&P as required for proper completion of work
CHHATAR PAL SINGH CONTRACTOR
NARENDRA KUMAR
M/S SAJID HUSSAIN CONTRACTOR
VISHALA CIVIL CONTRACTORS AND MAINTENANCE
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .