Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.2 LAccepted-Finance H NO DMCF 191 BHAGAT SINGH COLONY BALLABGARH 121004 | BALLABGARH | FARIDABAD | HARYANA | 121004 | ₹41.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹47.0 L+₹5.8 L (14.1%)Accepted-Finance PLOT NO 2 NH 2 NEAR HOTEL ZURICH VILLAGE AGWANPUR OPP DIMOND GROUP CNG PUMP DISTRICT PALWAL HARYANA | PALWAL | PALWAL | HARYANA | ₹47.0 L+₹5.8 L (14.1%) | L2 | Accepted-Finance L2 |
| 3 | Rejected-Technical 2 11 DHAJU FARIDABAD HARYANA 121004 | FARIDABAD | FARIDABAD | HARYANA | 121004 | - | - | Rejected-Technical not having similar nature work experience |
| 4 | Rejected-Technical CIVIL LINE 4 BEHIND DEV VAHAN PALWAL 2021R1824 | NA | NA | 121004 | - | - | Rejected-Technical bid capacity is not suffiecient for this tender. |
| 5 | Rejected-Technical HOUSE NO 188 1 VIDYA NAGAR MEHAM ROAD BHIWANI DISTRICT AND TEHSIL BHIWANI HARYANA 127021 | BHIWANI | BHIWANI | HARYANA | 127021 | - | - | Rejected-Technical bid capacity is not suffiecient for this tender. |
Tender Value
₹47.9 L
EMD Value
₹95,880
Closing Date
10 Aug 2026, 5:00 pmClosed
MANOJ SAINI
DIV Palwal
hew 82 Construction of footpath and Toe wall adjoining with Group Housing societies in HSVP Sec-2 Palwal and all other works contingent thereto including 3 years defect liability period free of cost.
2026_HBC_537544_1
2026A197D2DE AD20 4057 80F4 3F61B4A76A41251HSV
Open Tender
Civil Works
Works
180 days
Palwal Palwal
as per dnit
2 documents required · 2 mandatory
₹1,000
Yes
₹95,880
Yes
21 Aug 2026
30 Jul 2026
11 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
30 Jul 2026 - 1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Bollards: Providing and fixing mild steel Pipe, 150 mm outer diameter with minimum 6 mm wall thickness and 1050 mm length, 750mm above finish level and 300mm below finish level, fill interior solidly with concrete (1:5:10) (1 cement :2 sand :10 graded stone aggregate of 20mm nominal size) via packing after erecting the pipe vertically. Include a 10mm thick anchor bar welded at the bottom of bollard for anchorage. | 50 | each | 2,100 | ₹1,05,000 |
| 2 | [10.77]Providing and laying 80mm thick factory made cement concrete interlocking paver block of M -35 grade made by block making machine with strong vibratory compaction, of approved size, design and shape, laid in required colour and pattern over (BIS 15658:2006) and including 60mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. [Through Rate] | 3,492 | Sqm | 637 | ₹22,24,404 |
| 3 | [17.14.1]Granular Sub-Base with Close Graded Material - (Table:- 400-1) Plant mix method
Construction of granular sub-base by providing Material as per Grading III (Table 400-I of MORTandH 5th revision) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORTandH specifications 1. Grading I material [Through Rate] | 698.4 | cum | 1,178 | ₹8,22,715.2 |
| 4 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [1km] | 2,000 | cum | 53 | ₹1,06,000 |
| 5 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 2,148.41 | cum | 78 | ₹1,67,575.98 |
| 6 | [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate] | 10.8 | cum | 460 | ₹4,968 |
| 7 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 66.93 | cum | 3,476 | ₹2,32,648.68 |
| 8 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] | 66.93 | cum | 2,442 | ₹1,63,443.06 |
| 9 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] | 234.26 | cum | 4,128 | ₹9,67,004.64 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_616700.xls
BOQ • 0.35 MB
82.pdf
PDF • 0.77 MB
X11.pdf
PDF • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .