Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.7 CrAccepted-Finance | 1 | Accepted-Finance Lowest Quoted Rate | |
| 2 | 2₹9.8 Cr+₹2.1 Cr (26.9%)Rejected-Finance | 2 | Rejected-Finance High quoted rate | |
| 3 | Rejected-Technical | - | Rejected-Technical Non Responsive | |
| 4 | Rejected-Technical | - | Rejected-Technical Non Responsive | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹9.4 Cr
EMD Value
₹18.9 L
Closing Date
27 May 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ACE WR Zone Bharatpur
O/o Additional Chief Engineer Water Resources Zone Bharatpur
Renovation of Pathena canal and its VRBs, repair of head cross regulator of flood canals and bunds of Distt Bharatpur
2025_WRDAS_466232_4
ACE NIT 01/2025-26_Bharatpur
Open Tender
Civil Works
Percentage
456 days
under jurisdiction of bharatpur Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
as per nit
₹18.9 L
Yes
BHaratpur
13 Aug 2025
8 May 2025
28 May 2025
8 May 2025
27 May 2025
8 May 2025
19 May 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.ordinary | 4,38,972.96 | sqm | 1.45 | ₹6,36,510.79 |
| 2 | Removal of slit/soil/earth, sand, pebbles, 'Malba', debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect(c)For depth above 30cm. | 2,01,417.44 | cum | 90 | ₹1,81,27,569.6 |
| 3 | Extra on item 18 only if silt clearance is done under water & mud. | 52,095.92 | cum | 23 | ₹11,98,206.16 |
| 4 | Extra lead over item no 1 of excavated material.Beyond initial lead of 50 m & upto 250m | 52,095.92 | cum | 9.5 | ₹4,94,911.24 |
| 5 | Add extra for lead beyond 250m & upto 750m (for average 1/2Km). | 52,095.92 | cum | 8.75 | ₹4,55,839.3 |
| 6 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 90% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With lead beyond 250 m and up to 750 m (½ Km) | 1,235.1 | cum | 118.5 | ₹1,46,359.35 |
| 7 | Watering of earth including cost of carriage of water when source of water is up to 1 Km | 1,235.1 | cum | 12.6 | ₹15,562.26 |
| 8 | Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor) | 1,235.1 | cum | 25 | ₹30,877.5 |
| 9 | Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required. | 330.96 | cum | 91 | ₹30,117.36 |
| 10 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect(a) Hard /Dense soil. | 5,406.72 | cum | 95 | ₹5,13,638.4 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_835762.xls
BOQ • 0.41 MB
170011043.pdf
Tender Documents • 0.88 MB
170011045.html
Tender Documents • 0.05 MB
BidDocumentPathenaCanal.pdf
Tender Documents • 2.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .