Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹61,390
Closing Date
27 Jun 2026, 5:00 pm4d left
Similar tender results from the same govt authority in the past 3 years.
EE
Nagar Nigam Gorakhpur
ward no 08 Chargahwa me Bhanu Pratap Pandey ke makan se S N Chaudhary ke makan tak avn rakesh kumar singh , rashmi singh ke makan se priya villa tak CC sadak v RCC nali avn side patri interlocking ka karya.
2026_DOLBU_1162158_1
FFC Ward 8 sn 10
Open Tender
Civil Works
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
Nagar Nigam Gorakhpur
₹61,390
20 Jun 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
27 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1A | ||||||
| 1.01 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). SI No.692 | 24.86 | Cum | 400 | ₹9,944 | BI01010001010000000000000515BI0100001113 |
| 1.02 | Cleaning of site And cleaning of dismental material in all complete | 12 | Nos | 330 | ₹3,960 | - |
| 1.03 | Earth work in excavation in foul position soil lead 50mt.& lift 1.5 mt. incl. lab. T&P etc all complete. | 235.78 | Cum | 120 | ₹28,293.6 | BI01010001010000000000000515BI0100001118 |
| 1.04 | P/L of base concrete in 1:6:12 with cement, L-Sand and 40mm S/B including mat. Lab. T&P,etc all complete. | 29.37 | Cum | 4,007 | ₹1,17,685.59 | BI01010001010000000000000515BI0100001113 |
| 1.05 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I No-289) | 113.81 | Cum | 9,082 | ₹10,33,622.42 | - |
| 1.06 | M.S. (Tor steel or plain) in plain work such as R.C.C or R.B work Including bending for proper shape as necessary including bending for proper completion of the work and Including supply of all steel & wastage, bend, hooks, and authorised overlapping shall be measured. (S.I-504) | 78.52 | Qtl | 7,690 | ₹6,03,818.8 | - |
| 1.07 | New work (two or more coat applied@ 1.67ltr/10sqm over and inclu base coat of water proofing cement paint applied @ 2.20kg/10sqm) | 279.27 | Sqm | 92 | ₹25,692.84 | - |
| 1.08 | P/L of 125 micron polythin sheet including etc. all complete of work. | 628 | Sqm | 24 | ₹15,072 | - |
| 1.09 | S/L of GSB 53-9.5mm thick S/B upto 10 cm loose layer including etc all complete of work. | 92 | Cum | 3,134.25 | ₹2,88,351 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
d.pdf
Tender Documents • 2.36 MB
BOQ_2178355.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid