Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 4 BY 8 BLOCK H NEAR VIJAY CHOWK EAST DELHI DELHI 110051 | EAST DELHI | DELHI | 110051 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.0 L
Closing Date
27 Jan 2020, 6:00 pmClosed
VJ sitarama Swamy
GE Airforce Sirsa
JOB WORKS For Central AC Plants Installed at WSA
2020_MES_314714_1
303/LP/18/EM (Central AC Plants)
Open Tender
Job Works
Works
30 days
GE Airforce Sirsa
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
1 Feb 2020
14 Jan 2020
28 Jan 2020
14 Jan 2020
27 Jan 2020
17 Jan 2020
14 Jan 2020 - 27 Jan 2020
Amount
M&L for carrying out detailded survey by OEM of existing central air conditioning plant, chilled water type 104 TR running capacity and 52 TR standby capacity, including comprehensive inspection of chiller unit (model no. XWC4S-052A, Make : Bluestar Ltd), air handing unit (4 Nos), chilled water pipeline, hot water pipeline, condenser pipeline and all other allied equipments of entire air conditioning plant and submission of expert opinion to control the temperature and humidity automatically and can be observed from plant control room by retrofitting the new techniques. The proposal should be in compliance with the guidelines of STEC Pamphlet No 8 and CFEES recommendation. The following parameters are mandatory to achieve the requirements as per the direction of user :- 1. Summer : Dry Bulb Temperature 240 C + 20 C, RH 55% + 5%. 2. Winter : Dry Bulb Temperature 180 C + 20 C, RH 50% + 5%. inside the storeage accomodation at AF Stn Sirsa. Note : 1. A detailed report of survey containing the plan of action supported with estimate and rate analys is required to be submitted within one month of survey. 2. The report should be attached with detail design and drawings specifying all dimension of all the necessary measures/modification to the existing air conditioning plant required for achieving the above mentioned environmental condition.
AMBIKA ENTERPRISES
DCM ENTERPRISES
SHIVAM ENTERPRISES
Projenix
AGGARWAL CONSTRUCTION CO.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .