| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.3 LAdmitted-Fee/PreQual/Technical/Finance | -29.50% | ₹23.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹25.8 LAdmitted-Fee/PreQual/Technical/Finance | -21.99% | ₹25.8 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹26.4 LAdmitted-Fee/PreQual/Technical/Finance BHUBANESWAR | BHUBANESWAR | SUNDARGARH | ODISHA | -19.99% | ₹26.4 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹26.4 LAdmitted-Fee/PreQual/Technical/Finance | -19.99% | ₹26.4 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L3₹26.4 LAdmitted-Fee/PreQual/Technical/Finance AT BARAKOTI PO UTTARKUL DIST JAJPUR 755013 | JAJPUR | JAJPUR | ODISHA | 755013 | -19.99% | ₹26.4 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹33.1 L
EMD Value
₹33,100
Closing Date
2 Jul 2026, 5:00 pmClosed
Superintending Engineer
O/o the SE, Jajpur Irrigation Division, Jajpur
Canal improvement
2026_CDJID_132142_25
e-Procurement Notice No.01/ 2026-27
Open Tender
Civil Works - Canal
180 days
Jajpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹33,100
Yes
3 Jul 2026
18 Jun 2026
3 Jul 2026
18 Jun 2026
2 Jul 2026
18 Jun 2026
18 Jun 2026 - 24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing & grubbing shrub, jungles including uprooting stumps of trees and trees below 1.0 m. girth and thick bushes including bamboo clamps based on pre-measurement disposing the debris away from the work site with all leads, lifts and delifts with cost of all labour, T & P, hiring and running charges of all machineries, cess etc. complete as per direction of Engineer-in-Charge. | 3,360 | One Cum | 2.9 | ₹9,744 |
| 2 | Flank dressing to proper camber including cost of all labour, all incidental charges, labour cess etc. complete as per direction of the Engineer-in-Charge. | 1,728 | 100 Sqm | 707.2 | ₹12,22,041.6 |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes 90 to 45 mm confirming IRC Gr-III to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials(moorum) to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of MOSRT&H specifications for road and bridge works (4th revision) including all labour, T&P, cost, carriage, royalty, cess, all applicable . and incidental charges of all the materials required as per direction of Engineer-in-charge. | 378 | One Cum | 2,688.7 | ₹10,16,328.6 |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mixed macadam specification including premixing the material with water at OMC in mechanical mix plant, carrigate of mix materials by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H specification for road & bridge works. | 324 | One Cum | 3,104.6 | ₹10,05,890.4 |
| 5 | Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil with initial lead of 5.00km on properly preapared and scientificaly approved surface including spreading and leveling the earth in 22.5cm layers to make ready for watering and compaction by vibratory rollers in dam & dykes for all heights including construction, maintainance and lighting of haul road and borrow area in layers not exceeding 22.5cm to 95% proctor dry density including hire and running charges of all the machinaries including cost of royalty and labour cess etc. all complete as per specification and direction of the Engineer-in-Charge. (Measurement will be taken on finished compacted level section under OMC condition) | 3,113.47 | One Cum | 347.4 | ₹10,81,619.48 |
| 6 | Fine dressing and turfing by mechanical means with all leads, lifts, delifts etc. with best compacted dub grass including watering, ramming, etc. complete including labour cess as per the direction of Engineer-in-charge (Payment will be made after survival of turf). | 3,504 | One Sqm | 33.5 | ₹1,17,384 |
| 7 | Earth work excavation, loading, unloading and carriage by mechanical means of sand and sandy soil, including stoney earth, gravel and moorum etc. interspread with boulders upto 1/2cum size with all leads, lifts and delifts including trimming of bank slopes and bed to design section and depositing excavated materials away from the work site by mechanical means with an initial lead of 1.00Km, cess etc complete as per direction of the Engineer-in-Charge. | 756 | One Cum | 81.9 | ₹61,916.4 |
stage.html
html • 0.08 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
TechBidJJPR47.pdf
Tender Documents • 2.04 MB
BOQ_596866.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid