CE/TPSO/MDU
O/oCE/TPSO/MDU
110 kV UG cable from proposed Cable Termination tower for the proposed Panagaadi 110/11 kV SS
2026_EB_711822_1
CE/TPSO/MDU/012/26-27
Open Tender
Civil Works - Others
Works
180 days
Panagaadi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5 L
Yes
8 Oct 2026
8 Oct 2026
22 Oct 2026
8 Oct 2026
21 Oct 2026
8 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing of juli flora jungle disposing off to a place at-least 1km away from the site as directed by the Engineer in charge including all Labour charges, Lead, Lift, T&Ps etc., complete. | 420 | M2 | - | - |
| 2 | Removing of black top road and disposed away from the site as directed by the Engineer including cost of labour specification complete. | 310 | M3 | - | - |
| 3 | Earth work excavatin in hard gravelly soil, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth mixed with small size boulders etc., complete as per standard specification complete | 504 | M3 | - | - |
| 4 | Earth work Excavation and depositing on bank with initial lead of 10 metre and lift of 2 metre in soft disintegrated rock, laterite soft rock or kankar not requiring blasting including all leads, lifts etc., as per standard specification complete | 567 | M3 | - | - |
| 5 | Earth work Excavation in Hard rock by wedging and chiseling and trimming to proper shape where blasting is prohibited including all leads, lifts etc., as per standard specification complete. | 189 | M3 | - | - |
| 6 | Supplying and filling the trench with M sand along the cable route as per standard specification, including cost of all materials, labour, lead, lift etc., complete. | 188.3 | M3 | - | - |
| 7 | Transporting and laying of RCC 1:1.5:3 mix UG cable cover slab from casting yard to work site placing in position as required at site. | 1,020 | Nos | - | - |
| 8 | PCC 1:3:6 using 20mm metal for tower foundation concrete without formwork including cost of all materials labour,curing lead lift curing etc complete. | 44 | M3 | - | - |
| 9 | Reinforced cement concrete in CC 1:1.5:3 mix using 12 to 20mm HBG machine crushed metal for cover slab including cost of cement and form box all materilas,labour,curing vibration charges including cost of all leads, lifts as per standard specification etc., complete (but excluding cost of steel reinforcement) | 16 | M3 | - | - |
| 10 | Reinforced cement concrete in 1:1.5:3 using 20mm HBG machine crushed metal for footing concrete including cost steel shuttering, centering, cost of all materials, lead, lift , etc., complete.,but excluding cost of steel reinforcement | 165 | M3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_855140.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .