Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC | ₹2.5 Cr Quoted ₹2.6 Cr | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹2.7 CrRejected-Finance 12TH FLOOR PLOT NO 26A OFFICE NO 1201 THE LANDMARK CO OP HSG SOC LTD KHARGHAR NAVI MUMBAI RAIGAD 410210 | NAVI MUMBAI | RAIGAD | MAHARASHTRA | 410210 | ₹2.7 Cr | L2 | Rejected-Finance Rejected |
| 3 | L3₹2.7 CrRejected-Finance | ₹2.7 Cr | L3 | Rejected-Finance Rejected |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected |
Tender Value
₹2.4 Cr
EMD Value
₹1.2 L
Closing Date
30 Apr 2026, 5:30 pmClosed
AD, Dept. of Archaeology, Nashik
1411, Sarkarwada, Saraf Bazar, Bohor Patti, Nashik 422001
RESTORATION And CONSERVATION WORK FOR PAROLA FORT, PAROLA, DIST. JALGAON (PHASE II)
2026_TCADM_1296977_1
01 / 2026_27
Open Tender
Civil Works
Percentage
540 days
Parola
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹1.2 L
Nashik
13 Jul 2026
21 Apr 2026
4 May 2026
21 Apr 2026
30 Apr 2026
21 Apr 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness | - | Sqm. | - | - |
| 2 | Cutting down trees including trunks and branches with girths above 30 cm to 60 cm and stacking the materials neatly with all lifts and lead of 1000 m as directed and earth filling in the depression / pit if any. | - | No. | - | - |
| 3 | Cutting down trees including trunks and branches with girths above 90 cm to 180 cm and stacking the materials neatly with all lifts and lead of 1000 m as directed and earth filling in the depression / pit if any. | - | No. | - | - |
| 4 | Conducting scientific excavation in all types of soils including diging gently a layer of 1 to 5 cm at a time to protect the hidden antiquities seiving the excavated material separating antiquities and storing soil antiquities at suitable location as directed by research assistant / excavation incharge etc. complete. | - | Cum. | - | - |
| 5 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mannual Means | - | Cum. | - | - |
| 6 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete. | - | Cum. | - | - |
| 7 | Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete. | - | Cum. | - | - |
| 8 | Removing Pointing in lime or cement including stacking the materials as directed with all leads, lifts, complete. Additional Item Spec. No. : As directed by Engineer in charge. | - | Sqm. | - | - |
| 9 | Lowering down carefully existing stone masonry of the monument manually in proper order including shifting the stone elements up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete. | - | Cum. | - | - |
| 10 | Removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete. | - | Nos. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_2228089.xls
BOQ • 0.41 MB
B1_Parola.pdf
Tender Documents • 2.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].