Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAccepted-AOC AT GANDHI NAGAR WARD NO 01 PO GUDARI DIST RAYAGADA | GUDARI | RAYAGADA | ODISHA | ₹12.5 L | L1 | Accepted-AOC As per the lottery process he is selected as 1st lowest and deposit the require EMD and signing the agreement |
| 2 | L2₹12.5 LRejected-Finance | ₹12.5 L | L2 | Rejected-Finance Not Qualified in the lottery process |
| 3 | L2₹12.5 LRejected-Finance AT PO PADMAJPUR DIST RAYAGADA | RAYAGADA | ₹12.5 L | L2 | Rejected-Finance Not Qualified in the lottery process |
| 4 | L2₹12.5 LRejected-Finance AT PO KHARLINGI VILLAGE BONDHUGUDA PS GUNUPUR DIST RAYAGADA | GUNUPUR | RAYAGADA | ODISHA | ₹12.5 L | L2 | Rejected-Finance Not Qualified in the lottery process |
| 5 | L2₹12.5 LRejected-Finance | ₹12.5 L | L2 | Rejected-Finance Not Qualified in the lottery process |
Tender Value
₹12.5 L
EMD Value
₹12,501
Closing Date
2 Apr 2026, 5:00 pmClosed
Block Development Officer, Gunupur
Office of the Block Development Officer, Gunupur
Construction of Additional Class Room Building at Sagada UGHS, Gunupur.
2026_PZPGN_127378_1
BDO, Gunupur-online-04/2025-26
Open Tender
Civil Works - Buildings
Percentage
90 days
Sagada
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹12,501
Yes
14 Jul 2026
18 Mar 2026
4 Apr 2026
18 Mar 2026
2 Apr 2026
18 Mar 2026
18 Mar 2026 - 25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with cost of labour,cess, hire & running charges of water pumps sundries , T & P & all other machinaries required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge. | - | Each cum | 268.19 | - |
| 2 | Filling F&P with sand well watered and rammed including cost, conveyance of all material and labour etc complete as per the direction of EIC | - | Each cum | 740.06 | - |
| 3 | P.C.C. (1:3:6) to using 40 MM size hard granite matal including cost, conveyance of all material and labour etc complete as per the direction of EIC | 1 | Each cum | 5,779.05 | ₹5,773.27 |
| 4 | P.C.C. (1:3:6) to using 40 MM size hard granite matal including cost, conveyance of all material and labour etc complete as per the direction of EIC | 1 | Each cum | 5,779.05 | ₹5,773.27 |
| 5 | R.C.C. M20 :-Providing in position machine mixed and machine vibrated design mix cement concrete of M25 grade for reinforced cement concrete work including laying of concrete using 12 mm - 20 mm size crusher broken hard granite chips excluding the cost of centering, shuttering, and reinforcement but including admixture in recommended proportions to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer- In - Charge. including cost all materials, conveyance , royalties and taxes, loading and unloading cost of all labour,sundries, T&P etc.complete.Foundation Footing, Column Base | 1 | Each cum | 5,790.19 | ₹5,784.4 |
| 6 | R.C.C. M20 :-Providing in position machine mixed and machine vibrated design mix cement concrete of M25 grade for reinforced cement concrete work including laying of concrete using 12 mm - 20 mm size crusher broken hard granite chips excluding the cost of centering, shuttering, and reinforcement but including admixture in recommended proportions to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer- In - Charge. including cost all materials, conveyance , royalties and taxes, loading and unloading cost of all labour,sundries, T&P etc.complete.Foundation Footing, Column Base | 1 | Each cum | 5,790.19 | ₹5,784.4 |
| 7 | Rigid smooth centering for RCC works including false work and dismantelling them after casting including cost of materials complete in ground floor RCC foundation, Pointh band, and footing base of column | 69.07 | Each Sqm | 84.24 | ₹5,818.46 |
| 8 | RCC column from PL to RL | 44.7 | Each Sqm | 1,193.68 | ₹53,357.5 |
| 9 | Lintel Beam | 13.99 | Each Sqm | 562.41 | ₹7,868.12 |
| 10 | Roof Beam | 32.84 | Each Sqm | 1,193.68 | ₹39,200.45 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_585546.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
DTCN.pdf
Tender Documents • 1.37 MB
BOQ_585546.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].