| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.6 LAccepted-Finance | ₹53.6 L | L1 | Accepted-Finance Quoting Lowest rate |
| 2 | L2₹54.6 LRejected-Finance 121004 | ₹54.6 L | L2 | Rejected-Finance Quoting Higher rate |
| 3 | L3₹54.7 LRejected-Finance | ₹54.7 L | L3 | Rejected-Finance Quoting Higher rate |
| Sl No | Description | Qty | Unit | GHOSH ENTERPRISE L2 | DELTA BROTHERS L1 | RIK ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Day to Day routine and preventive maintenance of Electrical Installation, of all buildings and sub-stations incl. of all DG sets within the compound of Bardhaman Medical College & Hospital within jurisdiction of BMCH Electrical Sub-Division, PWD. | ||||||
| 1.01Buildings Name : Emergency Building, G+7 New Building, Junior Doctor's Hostel, Mental Building, Bijoy Chand Building,PWD Office Building, G+2 New Building, Blood Centre, PP Unit, DIPHL, MSVP Administrative Building, Pediatric Building, OPD Building, Gynea Building, Radiotherapy Building, Compressive Store, Electrical Sub-station building, Isolation Ward, All surrounding Road Lighting, Gate Lighting, Feeder Pillars, Fire Pump Building etc. with 2 Nos. Doctor's Qtr, Khosbagan and all others building. | ||||||
| 1.02 | Skilled Electrical technician for,
Morning-- 2no, Evening--2 no, Night--2 no, Day / General - 3nos.
(Total-- 9 nos.) | 12 | Months | 2,40,800 ₹28,89,600 | 2,38,813 ₹28,65,756 | 2,41,500 ₹28,98,000 |
| 1.03 | Semi- Skilled Electrical technician for,
Morning--2 no, Evening--2 no, Night--2 no, Day / General--2 nos.
(Total-- 8 no) | 12 | Months | 1,99,200 ₹23,90,400 | 1,93,747 ₹23,24,964 | 1,99,000 ₹23,88,000 |
| 2.00 | Yearly (and In case of Fault) inspection, testing and cleaning of all HT, LT substation equipments (through servicing of HT panel incl. testing & setting of protection relays, servicing of transformer incl. necessary testing, servicing of LT panel) by deployment of separate personnel having requisite SCC issued by DOE, Govt. of West Bengal with submission of Detail Integral Report in the format prescribed by the Engineer-in-charge / laid in the Terms & Condition as well as in-prompt attend & rectification of breakdown call as and when required through out the year as per direction of EIC. (Yearly basis Rate) (No extra charge for Fault Rectification) | 1 | Item/Year | 1,79,000 ₹1,79,000 | 1,70,000 ₹1,70,000 | 1,81,500 ₹1,81,500 |
| 3.00Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible. | ||||||
| 3.01A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets | ||||||
| 3.02Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible. | ||||||
| 3.03A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets | ||||||
| 3.04Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible. | ||||||
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
25 Jun 2026, 6:00 pmClosed
Sr.Superintending Engineer
Office of the Sr. Superintending Engineer, Western Electrical Circle , PWD, Purta Bhavan, 1st floor, Burdwan-713103
Day to Day routine and preventive maintenance of all kind of Electrical Installations of all buildings and sub-stations incl. of all DG sets within the compound of Bardhaman Medical College an Hospital under jurisdiction of BMCH Electrical Sub-Divis
2026_WBPWD_5015633_1
WBPWD/SSEWEC /BED /NIQ-16 /2026-27
Open Tender
ELECTRICAL WORKS ORG
365 days
Purba Bardhaman
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.1 L
Office of the Sr. Superintending Engineer, Western
29 Jun 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
25 Jun 2026
19 Jun 2026
16 Jun 2026 - 19 Jun 2026
19 Jun 2026
Day to Day routine and preventive maintenance of Electrical Installation, of all buildings and sub-stations incl. of all DG sets within the compound of Bardhaman Medical College & Hospital within jurisdiction of BMCH Electrical Sub-Division, PWD.
Buildings Name : Emergency Building, G+7 New Building, Junior Doctor's Hostel, Mental Building, Bijoy Chand Building,PWD Office Building, G+2 New Building, Blood Centre, PP Unit, DIPHL, MSVP Administrative Building, Pediatric Building, OPD Building, Gynea Building, Radiotherapy Building, Compressive Store, Electrical Sub-station building, Isolation Ward, All surrounding Road Lighting, Gate Lighting, Feeder Pillars, Fire Pump Building etc. with 2 Nos. Doctor's Qtr, Khosbagan and all others building.
Skilled Electrical technician for, Morning-- 2no, Evening--2 no, Night--2 no, Day / General - 3nos. (Total-- 9 nos.)
Semi- Skilled Electrical technician for, Morning--2 no, Evening--2 no, Night--2 no, Day / General--2 nos. (Total-- 8 no)
Yearly (and In case of Fault) inspection, testing and cleaning of all HT, LT substation equipments (through servicing of HT panel incl. testing & setting of protection relays, servicing of transformer incl. necessary testing, servicing of LT panel) by deployment of separate personnel having requisite SCC issued by DOE, Govt. of West Bengal with submission of Detail Integral Report in the format prescribed by the Engineer-in-charge / laid in the Terms & Condition as well as in-prompt attend & rectification of breakdown call as and when required through out the year as per direction of EIC. (Yearly basis Rate) (No extra charge for Fault Rectification)
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible.
A. Scope of Work : The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.49 MB
BOQ_5084532.xls
BOQ • 0.33 MB
new2911.pdf
Tender Documents • 0.51 MB
Corriedate.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid