Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹21.0 L
Closing Date
19 Aug 2026, 11:00 am
Sr.Superintending Engineer
Office of the Superintending Engineer, Western Electrical Circle , PWD, Purta Bhavan, 1st floor, Burdwan-713103
Day to Day Electrical maintenance for the entire Electrical installation including providing all sorts of support service (as and when required) for the Old SDH Building including other Related Buildings of Prafulla Chandra Sen Govt Medical College
2026_WBPWD_5018048_1
WBPWD/SSEWEC /HED /NIQ-37 /2026-27
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
Hooghly
Please refer Tender documents.
5 documents required · 5 mandatory
₹21.0 L
Office of the Superintending Engineer, Western Ele
6 Aug 2026
6 Aug 2026
21 Aug 2026
6 Aug 2026
19 Aug 2026
11 Aug 2026
6 Aug 2026 - 10 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Day to Day Electrical maintenance for the entire Electrical installation including providing all sorts of support services (as and when required) by engaging Skilled, Semi Skilled Labour for the Old SDH Building including other Related Buildings of Prafulla Chandra Sen Govt Medical College & Hospital under Arambagh Electrical Sub-Division, PWDte on 24x7 basis for 1(One) year as per details & as per Terms & Conditions--- | |||||
| 1.01 | 1) 01 (One) no Skilled Electrician & 01 (One) no Semi-Skilled employee at 6 AM to 2 PM
2) 01 (One) no Skilled Electrician & 01 (One) no Semi-Skilled employee at 2 PM to 10 PM
3) 01 (One) no Skilled Electrician & 01 (One) no Semi-Skilled employee at 10 PM to 06 AM and 01 (One) no Semi-Skilled employee at 10 AM to 06 PM | - | Months | - | - |
| 2Terms& Conditions Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of preventive and corrective maintenance is: To prevent fire hazards due to electrical short circuits or faults To ensure safety of occupants and the general public To minimize electrical breakdowns and associated downtime Any incident such as fire hazards, falling of ceiling fans/luminaries & suspended/pendent Electrical fittings, or similar occurrences due to lack of maintenance shall be viewed seriously, and the agency shall be held responsible. | |||||
| 2.01 | A. Scope of Work :
The scope includes routine, preventive, corrective and Breakdown maintenance of the entire electrical installation within the premises, including but not limited to: i. Distribution Substations including HT gear, Transformers (performing different safety and performance tests and overhauling of substation equipments as detailed under A.2. ii. iii. iv. v. LT distribution networks and panels including Power and control cables Electrical wiring for all buildings (residential and non-residential) Distribution Boards (DBs), LT panels, feeder pillars, AMF panels Switchboards, sockets, Computer Points, Fittings & Fixtures vi. Electrical Power outlets for air-conditioning systems, sound systems, PA systems, etc. vii. Compound lighting including high mast viii. All type of signboards e.g. Glow-sign, Metal Signage, LED signage ix. Electrical installations up to switchboards/panels for lift machine rooms & pump rooms x. Timers for AC, Air-Curtain & compound lighting (operation, configuration, repair/replacement where supplied departmentally) xi. Fire detection system resetting/switching off as and when directed by EIC / AE / JE xii. Lightning Conductor Installations including it’s Earthings xiii. Operation of DG sets | - | - | - | - |
| 2.02 | A.1 General Requirements :
The agency shall: A.1.1 Materials & Consumables Provide all consumables required for maintenance, including:
Cotton waste, insulation tape, grease, battery water, fuse wires, CTC and other cleaning agents, Soaps etc.
Cable Tie, Split pin and Jam Nuts of Ceiling Fans in sufficient quantity, nuts/bolts, Ferrules & lugs and other minor accessories
All Logbooks and/ or Register as mentioned in this document. A.1.2 Tools & Instruments Provide and maintain calibrated tools and instruments, including:
Digital multimeter, Digital clamp on Ammeter, Megger (500V & 5000V) | - | - | - | - |
| 2.03 | Continuity Tester, Earth tester
Complete set of screwdrivers (flat, star, insulated) and Line Tester
Combination pliers& Long Nose Pliers, Wire stripper
Pipe wrench, Ring and open-end spanner set and Socket wrench set Electric Drill machine, Double Test Lamp, Hackshaw & Hammer, Torch
Crimping tools upto 400 Sq.mm, Sockets of some common sizes
Insulated ladder etc. | - | - | - | - |
| 2.04 | A.1.3 Safety & Equipment :
Provide caution boards such as “Men on Line”, “Don’t Switch On”, etc. Ensure all staff use proper uniforms
Follow all provisions of the Central Electricity Authority Safety Regulations (2023) and ensure any non-compliant installations are corrected immediately. Adhere strictly to BIS Code 5216:1982 for electrical safety practices. Keep electrical areas (substations, switch rooms, DG rooms, cable shafts) clean and free from storage or waste.
Store inflammable materials only in designated rooms built as per legal requirements. | - | - | - | - |
| 2.05 | Provide proper safety gear (gloves, earthing rods, belts, resuscitation equipment) to staff.
Maintain accessible first-aid boxes with standard supplies.
Before electrical work: disconnect power, display warning signs, secure fuses, and obtain a “Permit to Work.” Ensure high-tension lines are fully discharged and earthed.
After work: remove tools, ensure no personnel remain inside, restore normal connections, and officially close the permit before re-energizing.
In case of electrical accidents: immediately switch off power, safely remove the victim using non-conductive materials, move them to safety, and provide continuous artificial respiration. | - | - | - | - |
| 2.06 | A.1.4 Uniform and Safety :
Gear Provide at least two sets of uniforms and safety gear (helmet, Insulated hand gloves,Umbrella, raincoat, gumboots, etc.) to each staff member.The color end embossing should be as per direction of EIC.
A.1.5 Surveillance System :
To be installed at the Call Center or at any other location where sitting arrangement would be provided for agency deployed staffs, as per direction of EIC
Provide SIM-based, Standalone, IP surveillance camera (at least 2 MP) system with recording facility in Memory Card and should be capable of monitoring through multiple mobile phones, as decided by E.I.C. | - | - | - | - |
| 2.07 | Provide at least 2 Memory Card for the Camera each of capacity sufficient for holding at least 1 month footage.
Provide External Harddisk/ SSD for taking backup from Memory Card to ensure at least 1 year footage is available with the department.
Maintain and back up footage as required
Submit footage to AE at contract completion (precondition towards releasing Final Bill). N.B. - The Camera including accessories would be handed over to the agency after expiry of contract. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.49 MB
BOQ_5088692.xls
BOQ • 0.37 MB
new2911.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].