| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.5 LAccepted-AOC | ₹25.5 L | L1 | Accepted-AOC Selected as L1 |
| 2 | L2₹25.8 L+₹30,239.98 (1.19%)Rejected-Finance | ₹25.8 L+₹30,239.98 (1.19%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹28.4 L+₹2.9 L (11.4%)Rejected-Finance S O AKSHAY KU BEHERA AT BHAIRABI SAHI W NO 06 PO TALCHER DIST ANGUL ODISHA 759107 | TALCHER | ANGUL | ODISHA | 759107 | ₹28.4 L+₹2.9 L (11.4%) | L3 | Rejected-Finance Not L1 |
| 4 | L4₹29.0 L+₹3.5 L (13.8%)Rejected-Finance | ₹29.0 L+₹3.5 L (13.8%) | L4 | Rejected-Finance Not L1 |
| 5 | L5₹29.1 L+₹3.7 L (14.4%)Rejected-Finance | ₹29.1 L+₹3.7 L (14.4%) | L5 | Rejected-Finance Not L1 |
Tender Value
₹37.3 L
EMD Value
₹37,333
Closing Date
30 Mar 2026, 5:00 pmClosed
Superintending Engineer
O/o the Superintending Engineer, (RandB) Division, Nayagarh
Construction of Retaining wall , Approach Road and Compound wall for Transit House at Nayagarh for 2025-26
2026_EICCL_127500_15
eTCN11 of 2025-2026
Open Tender
Civil Works - Buildings
Percentage
90 days
Nayagarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹37,333
Yes
1 Sept 2026
23 Mar 2026
31 Mar 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ground Floor
Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed and disposal of the excavated materials within initial leads and lifts as per direction of E.I.C. | 1 | cum | - | - |
| 2Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete. | |||||
| 3Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | |||||
| 4R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete. Footing Base:- | |||||
| 5 | B.Plinth Beam:-(G.Floor) | 1 | cum | - | - |
| 6C.Column Shaft:-(G.Floor) | |||||
| 7 | D)Coping | 1 | cum | - | - |
| 8E)Drain wall | |||||
| 9F)Drain slab | |||||
| 10Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete. | |||||
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.30 MB
BOQ_585952.xls
BOQ • 0.33 MB
DTCN1116.pdf
Tender Documents • 1.20 MB
1stCorrigendum.pdf
Additional Documents • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .