| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹11.8 LAccepted-Finance GRAM KISHUNDASAPUR JANPAD AZAMGARH UTTAR PRADESH | AZAMGARH | AZAMGARH | UTTAR PRADESH | ₹11.8 L | Ist | Accepted-Finance First lowest |
| 2 | IInd₹12.1 LRejected-Finance | ₹12.1 L | IInd | Rejected-Finance Second lowest |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S RAM ASAREY PATEL L2 | M/S PRAGATI CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth Work in excavation of foundation with all type of soil including all labour cost T&P etc. required for proper completion of the work. | 68.11 | Cum | 6,470.45 ₹7,635.13 | 6,373.73 ₹7,521 Lowest |
| 2.00 | Supply and laying of local sand in foundation including cost of all material, labour and T&P etc. required for proper completion of work. | 8.08 | Cum | 10,027.28 ₹11,832.19 | 9,876.91 ₹11,654.75 Lowest |
| 3.00 | P.C.C. 1:3:6 CM with cement, coarse sand and Stone ballast size 20 to 50 mm including cost of all material, labour T&P etc. required for proper completion of work | 12.27 | Cum | 70,110.78 ₹82,730.72 | 69,059.12 ₹81,489.76 Lowest |
| 4.00 | Class 150 (Ist class) brick masonry work with 1:4 CM including cost of all material, labour T&P etc. required for proper completion of the work. | 38.84 | Cum | 2,42,089.72 ₹2,85,665.87 | 2,38,458.57 ₹2,81,381.11 Lowest |
| 5.00 | Cutting ,bending, binding and placing of reinforcement in position of including cost of all labour, material and T & P,binding wire for proper completion of work. | 1,804.64 | Kg | 22,648.23 ₹26,724.91 | 22,305.35 ₹26,320.31 Lowest |
| 6.00 | Cost of 8 mm Steel Bar | 326.8 | Kg | 27,451.2 ₹32,392.42 | 27,039.43 ₹31,906.53 Lowest |
| 7.00 | Cost of 12 mm Steel Bar | 1,477.84 | Kg | 1,21,182.88 ₹1,42,995.8 | 1,19,365.14 ₹1,40,850.86 Lowest |
| 8.00 | Centering and Shuttering of R.C.C. work including cost of all material, labour T&P etc.. Required for proper completion of work. | 144.81 | Sqm | 89,782.2 ₹1,05,943 | 88,334.1 ₹1,04,234.24 Lowest |
| 9.00 | Providing and laying of Reinforced Cement Concrete in (1:1.5:3 CM) with coarse sand and 4.75 mm to 20 mm size coarse aggregate of limestone well graded from dalla quarry including cost of all material, labour and T&P etc. required for proper completion of work as per specification. | 18.8 | Cum | 1,70,798 ₹2,01,541.64 | 1,68,273.16 ₹1,98,562.33 Lowest |
| 10.00 | Providing and Fixing of Angle iron 50*50*5 mm for Barbed wire. including cost of material labour cost T&P etc. required for proper completion of the work. | 216.79 | Kg | 21,679 ₹25,581.22 Lowest | 23,062.12 ₹27,213.3 |
Tender Value
Refer Docs
EMD Value
₹20,510
Closing Date
29 Jul 2026, 1:00 pmClosed
E.E. RAJA RAM CHAUDHARY
Minor LiftCanal Division, Mzp
Contruction of Boundary Wall At Deegh Pump Canal
2026_UPIDM_1166007_1
Tender Notice 04/EEMLCD/2026-27, lot-01
Open Tender
Civil Works
Item Wise
90 days
Vill-Khemapur, Blo-Deegh, Gyanpur Bhadohi
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹20,510
19 Aug 2026
6 Jul 2026
29 Jul 2026
6 Jul 2026
29 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Earth Work in excavation of foundation with all type of soil including all labour cost T&P etc. required for proper completion of the work. | 68.11 | Cum | 95 | ₹6,470.45 | 18% |
| 2 | Supply and laying of local sand in foundation including cost of all material, labour and T&P etc. required for proper completion of work. | 8.08 | Cum | 1,241 | ₹10,027.28 | 18% |
| 3 | P.C.C. 1:3:6 CM with cement, coarse sand and Stone ballast size 20 to 50 mm including cost of all material, labour T&P etc. required for proper completion of work | 12.27 | Cum | 5,714 | ₹70,110.78 | 18% |
| 4 | Class 150 (Ist class) brick masonry work with 1:4 CM including cost of all material, labour T&P etc. required for proper completion of the work. | 38.84 | Cum | 6,233 | ₹2,42,089.72 | 18% |
| 5 | Cutting ,bending, binding and placing of reinforcement in position of including cost of all labour, material and T & P,binding wire for proper completion of work. | 1,804.64 | Kg | 12.55 | ₹22,648.23 | 18% |
| 6 | Cost of 8 mm Steel Bar | 326.8 | Kg | 84 | ₹27,451.2 | 18% |
| 7 | Cost of 12 mm Steel Bar | 1,477.84 | Kg | 82 | ₹1,21,182.88 | 18% |
| 8 | Centering and Shuttering of R.C.C. work including cost of all material, labour T&P etc.. Required for proper completion of work. | 144.81 | Sqm | 620 | ₹89,782.2 | 18% |
| 9 | Providing and laying of Reinforced Cement Concrete in (1:1.5:3 CM) with coarse sand and 4.75 mm to 20 mm size coarse aggregate of limestone well graded from dalla quarry including cost of all material, labour and T&P etc. required for proper completion of work as per specification. | 18.8 | Cum | 9,087 | ₹1,70,835.6 | 18% |
| 10 | Providing and Fixing of Angle iron 50*50*5 mm for Barbed wire. including cost of material labour cost T&P etc. required for proper completion of the work. | 216.79 | Kg | 108 | ₹23,413.32 | 18% |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
T04L2Doc.pdf
Tender Documents • 1.01 MB
BOQ_2186971.xls
BOQ • 0.34 MB
DateCorindumLot0401.pdf
PDF • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].