Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹20,510
Closing Date
24 Jul 2026, 10:00 am
E.E. RAJA RAM CHAUDHARY
Minor LiftCanal Division, Mzp
Contruction of Boundary Wall At Deegh Pump Canal
2026_UPIDM_1166007_1
Tender Notice 04/EEMLCD/2026-27, lot-01
Open Tender
Civil Works
90 days
Vill-Khemapur, Blo-Deegh, Gyanpur Bhadohi
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹20,510
6 Jul 2026
6 Jul 2026
24 Jul 2026
6 Jul 2026
24 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Earth Work in excavation of foundation with all type of soil including all labour cost T&P etc. required for proper completion of the work. | 68.11 | Cum | 95 | ₹6,470.45 | 18% |
| 2 | Supply and laying of local sand in foundation including cost of all material, labour and T&P etc. required for proper completion of work. | 8.08 | Cum | 1,241 | ₹10,027.28 | 18% |
| 3 | P.C.C. 1:3:6 CM with cement, coarse sand and Stone ballast size 20 to 50 mm including cost of all material, labour T&P etc. required for proper completion of work | 12.27 | Cum | 5,714 | ₹70,110.78 | 18% |
| 4 | Class 150 (Ist class) brick masonry work with 1:4 CM including cost of all material, labour T&P etc. required for proper completion of the work. | 38.84 | Cum | 6,233 | ₹2,42,089.72 | 18% |
| 5 | Cutting ,bending, binding and placing of reinforcement in position of including cost of all labour, material and T & P,binding wire for proper completion of work. | 1,804.64 | Kg | 12.55 | ₹22,648.23 | 18% |
| 6 | Cost of 8 mm Steel Bar | 326.8 | Kg | 84 | ₹27,451.2 | 18% |
| 7 | Cost of 12 mm Steel Bar | 1,477.84 | Kg | 82 | ₹1,21,182.88 | 18% |
| 8 | Centering and Shuttering of R.C.C. work including cost of all material, labour T&P etc.. Required for proper completion of work. | 144.81 | Sqm | 620 | ₹89,782.2 | 18% |
| 9 | Providing and laying of Reinforced Cement Concrete in (1:1.5:3 CM) with coarse sand and 4.75 mm to 20 mm size coarse aggregate of limestone well graded from dalla quarry including cost of all material, labour and T&P etc. required for proper completion of work as per specification. | 18.8 | Cum | 9,087 | ₹1,70,835.6 | 18% |
| 10 | Providing and Fixing of Angle iron 50*50*5 mm for Barbed wire. including cost of material labour cost T&P etc. required for proper completion of the work. | 216.79 | Kg | 108 | ₹23,413.32 | 18% |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
T04L2Doc.pdf
Tender Documents • 1.01 MB
BOQ_2186971.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid