Loading…
Loading…
Tender ID
Tender Value
₹96,000
EMD Value
₹2,000
Closing Date
16 Mar 2026, 10:00 amClosed
Executive Engineer MID Anantnag hq Awantipora
MID Anantnag
Servicing/impregnation of flood affected prime movers and pumps at LIS Goripora, Bujibagh, Allochibagh, Hatiwara and Barsoo
2026_IFC_305786_1
Enit 14 of 2025-26
Open Tender
Electrical and Maintenance Works
Percentage
10 days
samboora
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
executive eingineer MID Anantnag
₹2,000
8 Apr 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
Dismantling of submerged 125 HP Horizontal motors from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assembly by using skilled workers, removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sorts of dust and muddy substances. applying of highly volatile active chemical for cleaning of coils, oven drying for removal of moisture. The job includes impregnation of coils and applying of fresh varnish (2 coats). After impregnation applying of heat up to suitable temperature for drying of coils /stator. The jobs further includes cleaning of extracted bearings with suitable chemical and grease and re-installation of motor assembly completely after conducting all above works ( At LIS Goripora)
Dismantling of submerged 75HP Horizontal motors from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assembly by using skilled workers, removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sorts of dust and muddy substances. applying of highly volatile active chemical for cleaning of coils, oven drying for removal of moisture. The job includes impregnation of coils and applying of fresh varnish (2 coats). After impregnation applying of heat up to suitable temperature for drying of coils /stator. The jobs further includes cleaning of extracted bearings with suitable chemical and grease and re-installation of motor assembly completely after conducting all above works (At LIS Goripora)
Dismantling of 10 cusec pump assemblies from base frame and Checking of pump by way of removal of any foreign material, cleaning of bearings / housing and impeller by using HSD and dhoti cloth. Providing / filling of fresh grease to bearing housings. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job. The executing agency has to arrange all types of tools and plants required for execution of the above jobs. ( At LIS Goripora)
Dismantling of submerged 60 HP Horizontal motors from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assembly by using skilled workers, removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sorts of dust and muddy substances. applying of highly volatile active chemical for cleaning of coils, oven drying for removal of moisture. The job includes impregnation of coils and applying of fresh varnish (2 coats). After impregnation applying of heat up to suitable temperature for drying of coils /stator. The jobs further includes cleaning of extracted bearings with suitable chemical and grease and re-installation of motor assembly completely after conducting all above works(At LIS BujiBagh)
Dismantling of 10 cusec pump assemblies from base frame and Checking of pump by way of removal of any foreign material, cleaning of bearings / housing and impeller by using HSD and dhoti cloth. Providing / filling of fresh transmission oil/ grease of suitable grade up to required levels. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job. The executing agency has to arrange all types of tools and plants required for execution of the above jobs. (At LIS BujiBagh)
Dismantling of submerged 60 HP Horizontal motor from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assembly by using skilled workers, removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sorts of dust and muddy substances. applying of highly volatile active chemical for cleaning of coils, oven drying for removal of moisture. The job includes impregnation of coils and applying of fresh varnish (2 coats). After impregnation applying of heat up to suitable temperature for drying of coils /stator. The jobs further includes cleaning of extracted bearings with suitable chemical and grease and re-installation of motor assembly completely after conducting all above works(At LIS Allochibagh)
Dismantling of 10 cusec pump assembly from base frame and Checking of pump by way of removal of any foreign material, cleaning of bearings / housing and impeller by using HSD and dhoti cloth. Providing / filling of fresh transmission oil of suitable grade up to required levels. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job. The executing agency has to arrange all types of tools and plants required for execution of the above jobs. (At LIS Allochibagh)
Dismantling of submerged 60 HP Horizontal motors from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assembly by using skilled workers, removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sorts of dust and muddy substances. applying of highly volatile active chemical for cleaning of coils, oven drying for removal of moisture. The job includes impregnation of coils and applying of fresh varnish (2 coats). After impregnation applying of heat up to suitable temperature for drying of coils /stator. The jobs further includes cleaning of extracted bearings with suitable chemical and grease and re-installation of motor assembly completely after conducting all above works(At LIS Hatiwara)
Dismantling of 10 cusec pump assemblies from base frame and Checking of pump by way of removal of any foreign material, cleaning of bearings / housing and impeller by using HSD and dhoti cloth. Providing / filling of fresh transmission oil/grease of suitable grade up to required levels. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job. The executing agency has to arrange all types of tools and plants required for execution of the above jobs. (At LIS Hatiwara)
Dismantling of submerged 60 HP Horizontal motors from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assembly by using skilled workers, removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sorts of dust and muddy substances. applying of highly volatile active chemical for cleaning of coils, oven drying for removal of moisture. The job includes impregnation of coils and applying of fresh varnish (2 coats). After impregnation applying of heat up to suitable temperature for drying of coils /stator. The jobs further includes cleaning of extracted bearings with suitable chemical and grease and re-installation of motor assembly completely after conducting all above works (At LIS Barsoo)
Dismantling of 10 cusec pump assemblies from base frame and Checking of pump by way of removal of any foreign material, cleaning of bearings / housing and impeller by using HSD and dhoti cloth. Providing / filling of fresh transmission oil / grease of suitable grade up to required levels. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job. The executing agency has to arrange all types of tools and plants required for execution of the above jobs. (At LIS Barsoo)
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.61 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_993071.xls
BOQ • 0.31 MB
NIT14sl1.pdf
PDF • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .