Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.4 LAccepted-AOC NAGAL SUMMERA BHAG AATAS POST JAIT MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹39.4 L | L1 | Accepted-AOC Preparation Bond for Rs. 3941012.05 Only |
| 2 | L2₹44.4 LRejected-Finance | ₹44.4 L | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹45.1 LRejected-Finance | ₹45.1 L | L3 | Rejected-Finance Rejected due to higher Rates |
| 4 | L4₹49.8 LRejected-Finance KE 3 KARMYOGI NAGAR NH 2 MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹49.8 L | L4 | Rejected-Finance Rejected due to higher Rates |
| 5 | L5₹50.9 LRejected-Finance 88 28A KRISHNANURAM DEV NAGAR CHANDARI AGRA | AGRA | AGRA | UTTAR PRADESH | ₹50.9 L | L5 | Rejected-Finance Rejected due to higher Rates |
Tender Value
₹60.5 L
EMD Value
₹5.0 L
Closing Date
23 Mar 2026, 12:30 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
New Construction work of Saidpur Daulatpur Road in District Mathura
2026_CEAGR_1125315_6
1242/14M-AC/2025-26 dated 28-02-2026
Open Tender
Civil Works
180 days
Mathura
New Construction work
2 documents required · 2 mandatory
₹2,354
₹5.0 L
Yes
Agra
23 May 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
17 Mar 2026
Group-A Excavtion in soil using Hydraulic Excavator and Toppers with disposal upto 1000m Excavtion for roadwork in soil with hydraculic excavator of 0.9 cum bucket capacity inculiding cutting and loading in tippers. trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and trasporting to the embankment location with a lift upto 1.5m amd lead upto 1000m as per technical Specifcation clause 302.3 as per SOR SI.No.-18, Ch. No.-5
Construction of embankment with approved materials obtained from roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 as per SOR SI.No.-19, Ch. No.-5
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site. spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. As per SOR Chapter No. 5 Sl No. 21
Providing, laying and spreading Material on prepared sub grade, adding cement 43 grade OPC @2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base. Granular Sub-Base with Coarse Graded Material (Cement Treated Subbase)
Providing, laying and spreading Material on prepared sub grade, adding cement @4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base Cement treeted Base
Providing & applying Tack Coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.25 Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Machanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work, as per MORD specification No. 503
Providing, laying & rolling of open graded Premix Carpet of 20mm thickness composed of 13.2mm to 5.60mm aggregates including mixing in a suitable plant, laying & rolling with a three wheeled 80-100KN Static Roller capacity, finished to required level & grades Bitumen @ 14.6 Kg./ 10 sqm. area for premixing including all Taxes, Material, Labour and T&P etc required for proper completion of the work, as per MORD specification No. 508.
Providing and laying seal coat type "C" sealing the voids in a bituminous surfsce P.C. surface laid to specified levels grade and cross fall using with 6.7 mm nominal size grit of approved quarry @ 0.09 cum per 10sqm with Bitumen @ 6.50 kg/10sqm including heating of Bitumen to the required temperature and including all material , Labour & T&P etc. as per Clause 510 case-III of MORD Specification.
Group-B Excavtion in soil using Hydraulic Excavator and Toppers with disposal upto 1000m Excavtion for roadwork in soil with hydraculic excavator of 0.9 cum bucket capacity inculiding cutting and loading in tippers. trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and trasporting to the embankment location with a lift upto 1.5m amd lead upto 1000m as per technical Specifcation clause 302.3 as per SOR SI.No.-18, Ch. No.-5
Construction of embankment with approved materials obtained from roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 as per SOR SI.No.-19, Ch. No.-5
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site. spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. As per SOR Chapter No. 5 Sl No. 21
Providing, laying spreading & compacting of granular sub-base by providing coarse graded (Gr-1) materials, spreading in uniform layers with Motor Grader on prepared surface, mixing by mix in placed method with Rotovator at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete as per MORD clause 401.1 & as directed by Engineer Incharge including all machinery charges & including all labour, T&P etc required for proper completion of the work.
Providing, laying, spreading and compacting machine crushed stone ballast of approved quarry of 53~22.4mm size to water bound macadam of G-3 specification including spreading in uniform thickness, hand packing rolling with power roller 8 to 10 tonnes in stages to proper grade and camber applying and brooming with crushable screening material i.e. stone dust to fill-up the interstices of coarse aggregate, watering & rolling making necessary earthen bund to protect edges, lighting, guarding, barricadding etc. including the cost of all materials, labour, T & P etc. required for proper completion of work as per MORD specifications no 405.
Construction of un-reinforced, plain cement concrete avement thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M-30 (Grade), coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction, expansion, construction and constructionl joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days, curing compund (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501. (For Mathura)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.SI No- 12.1 as per S.I. No. 1, Ch.No.-6
PCC 1:3:6 in Foundation - Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing. as per S.I. No. 3, Ch.No.-6
Supply & Laying of Compacted 22.4~53 Stone Ballast under hume pipe
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in as per DSR No. 6.1.1 (Cement mortar 1:4 (1 Cement : 4 coarse sand)
Supply & Laying & fixing of 350mm N.P.-3 Hume pipe in proper position as directed by E/l including cartage of pipes/collars upto 30m distance.
Plastering with cement mortar 1:3 on brick work in sub-structure complete as per drawing and Technical Specifications Clauses 1300 & 2200 as per SOR SI.N0-20, Ch.No.-06
Reinforced Cement Concrete (M-20) in Open Foundation complete as per Drawing and Technical Specifications Clause 1500, 1700 & 2100 as per S.I. No. 8, Ch.No.-6
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.. (Thermo-Mechanically Treated bars of grade Fe-500D or more). As per DSR No. 5.22.6
Part-A Maintainance Charge including @ All Items total work amount etc as per Direction of E/I for the period of Five Years from the actual completion of work. (Total Amount for PC Work Sl No. 1 to 8 = 4056675.00 )
Part-B Maintainance Charge including @ All Items total work amount etc as per Direction of E/I for the period of Five Years from the actual completion of work. (Total Amount for CC Work Sl No. 9 to 22 = 1575445.70 )
Maintainance of First Year (@ 0.00% of Total Work Amount of item 1 to 8)
Maintainance of First Year (@ 0.00% of Total Work Amount of item 9 to 22)
Maintainance of Second Year (@ 0.75% of Total Work Amount of item 1 to 8)
Maintainance of Second Year (@ 0.25% of Total Work Amount of item 9 to 22)
Maintainance of Third Year (@ 1.50% of Total Work Amount of item 1 to 8)
Maintainance of Third Year (@ 0.50% of Total Work Amount of item 9 to 22)
Maintainance of Fourth Year (@ 2.25% of Total Work Amount of item 1 to 8)
Maintainance of Fourth Year (@ 0.75% of Total Work Amount of item 9 to 22)
Maintainance of Fifth Year (@ 3% of Total Work Amount of item 1 to 8)
Maintainance of Fifth Year (@ 1% of Total Work Amount of item 9 to 22)
Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable 2- Labour cess @ 1% will be deducted from contractor's bill at the time of payment 3- Maintenance will be calculated on value of actual work done.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
T6_Daulatpur.pdf
Tender Documents • 2.19 MB
BOQ_2098230.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid