Loading…
Loading…
Tender Value
₹13.7 L
EMD Value
₹17,200
Closing Date
21 Oct 2026, 3:00 pm
SO(C), GIRIDIH AREA
OFFICE OF THE GM, GIRIDIH AREA
Petty maintenance around areas near Railway Track of Giridih Project, Giridih Area
2026_CCL_366623_1
GM(G)/SO(C)/ E-tender/2026-27/47 Dt.06.10.26
Open Tender
Civil Works - Others
Percentage
365 days
GIRIDIH
Please refer Tender documents.
3 documents required · 3 mandatory
₹17,200
6 Oct 2026
6 Oct 2026
22 Oct 2026
7 Oct 2026
21 Oct 2026
7 Oct 2026
7 Oct 2026 - 14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil. | 3,813.88 | cum | 139.7 | ₹5,32,799.04 |
| 2 | Carriage of manure or sludge by Mechanical Transport/manual means including loading, unloading and stacking. | 1,143.32 | cum | 194.85 | ₹2,22,775.9 |
| 3 | Clearing grass and removal of the rubbish upto a distance of 50m outsidethe periphery of the area cleared. | 57,600 | sqm | 5.4 | ₹3,11,040 |
| 4 | Lifting of track from 150mm to 300mm in two stages including point and xing as required to achieve correct longitudinal level with initial packing as directed by the Site-in-Charge. ( Lifting of track at Pts. & Xing will be paid 1.5 times the straight length of track.) | 520 | per track metre | 37.39 | ₹19,442.8 |
| 5 | Welding by gas or electric plant including transportation of plant at site etc. complete. | 1,000 | cm | 3.6 | ₹3,600 |
| 6 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 50 | kg | 107 | ₹5,350 |
| 7 | Supplying and stacking of Stone dust including spreading. | 16.98 | cum | 1,401.34 | ₹23,794.75 |
| 8 | Supplying and stacking at site.53 mm to 22.4 mm size stone aggregate | 16.98 | cum | 2,431.3 | ₹41,283.47 |
| 9 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.75 MB
BOQ_379561.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .