| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 LAccepted-Finance | ₹24.3 L | L1 | Accepted-Finance Lowest Bidder |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
18 Sept 2026, 3:00 pmClosed
Executive Engineer, PWD.
Office of the Executive Engineer, PWD., Buildings Construction and Maintenance Division, PWD Campus, Big Bazaar Street, Town Hall, Coimbatore-641 001
CONSTRUCTION OF ONE ADDITIONAL DORMITORY BUILDING AT FIRST FLOOR AND TOILET FOR GROUND FLOOR AND FIRST FLOOR IN SOCIAL JUSTICE COLLEGE GIRLS HOSTEL CAMPUS ALANDURAI
2026_PWD_699126_1
01/03N/CBE-DVN /2026-27
Open Tender
Civil Works - Buildings
Lump-sum
ALANDHURAI
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹25,000
18 Sept 2026
31 Aug 2026
18 Sept 2026
31 Aug 2026
18 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling clearing away the damaged BRICK WORK IN CEMENT MORTAR and carefully stacking materials useful for reuse etc, as directed by the departmental officers as per standard specification | 0.8 | m3 | 302.95 | ₹242.36 |
| 2EARTHWORK EXCAVATION for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | |||||
| 2.01 | Upto 2.00m depth | 27.5 | m3 | 259.35 | ₹7,132.13 |
| 2.02 | Upto 2.00m depth | 6 | m3 | 271.85 | ₹1,631.1 |
| 3 | PLAIN CEMENT CONCRETE 1:5:10 (One cement, five M - sand and ten aggregate) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. | 1.8 | m3 | 5,528.6 | ₹9,951.48 |
| 4 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 3.4 | m3 | 1,987.5 | ₹6,757.5 |
| 5 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 3.4 | m3 | 157.8 | ₹536.52 |
| 6 | Supply and filling in foundation and basement with Gravel with Lead in 5Km in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 72 | m3 | 487.75 | ₹35,118 |
| 7 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener , side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 13.6 | m2 | 710.9 | ₹9,668.24 |
| 8 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 93.6 | m2 | 1,108.35 | ₹1,03,741.56 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
TenderDocument.pdf
Tender Documents • 0.47 MB
TenderCondition.pdf
Additional Documents • 1.05 MB
BOQ_840444.xls
BOQ • 0.50 MB
AlanduraiDateCorrigendum.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .