Loading…
Loading…
Tender Value
₹5.4 L
EMD Value
₹10,862
Closing Date
10 Jul 2026, 11:00 am2d left
EE-I/DAMODAR CANAL DIVISION
EE-I/DAMODAR CANAL DIVISION
Improvement of Inspection Path from ch 65.00 to 80.00 of left bank Dy 09 of RBMC under SeharaBazar Irrigation Sub Division of Damodar Canal Division.
2026_IWD_1030275_44
WBIW/EE-I/DCD/e-NIT-08/2026-27
Open Tender
CIVIL WORKS
120 days
Seharabazar (I) Sub Division
Please refer Tender documents.
7 documents required · 7 mandatory
₹10,862
Yes
2 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For Construction of Sub Base by consolidating jhama metal (63 mm to 45 mm) with moorum screeing.
Note:Add cost at site of 1.09 cum jhama metal and 0.26 cum of moorum screenig (loose volume ) to arrive at the consolidated rate | 177.54 | Cum | 2,239.17 | ₹3,97,542.24 |
| 2 | Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification Add cost at site of the materials to arrive at the complete rate. The compaction factor may be taken as 0.67.(The payment is to be made on the basis of the finished compacted volume of moorum.) | 82.3 | Cum | 1,602.68 | ₹1,31,900.56 |
| 3 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-Charge | 1,006 | Sqm | 5.96 | ₹5,995.76 |
| 4 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm.and rough dressing etc. complete as per profile. | 54.86 | Cum | 96.54 | ₹5,296.18 |
| 5 | Extra rate over Item Nos.1.01, 1.02 & 1.03 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. Three Extra Lead. | 54.86 | Cum | 42.9 | ₹2,353.49 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_2530109.xls
BOQ • 0.28 MB
2911i.pdf
Tender Documents • 1.26 MB
Download all tender documents and submit your bid