Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.1 LAdmitted-Finance | -41.10% | ₹11.1 L | L1 | Admitted-Finance |
| 2 | L2₹11.2 L+₹11,307.68 (1.02%)Admitted-Finance | -40.50% | ₹11.2 L+₹11,307.68 (1.02%) | L2 | Admitted-Finance |
| 3 | L3₹12.0 L+₹91,780.70 (8.27%)Admitted-Finance | -36.23% | ₹12.0 L+₹91,780.70 (8.27%) | L3 | Admitted-Finance |
| 4 | L4₹12.1 L+₹96,303.77 (8.68%)Admitted-Finance | -35.99% | ₹12.1 L+₹96,303.77 (8.68%) | L4 | Admitted-Finance |
| 5 | L5₹14.7 L+₹3.6 L (32.1%)Admitted-Finance | -22.22% | ₹14.7 L+₹3.6 L (32.1%) | L5 | Admitted-Finance |
Tender Value
₹18.8 L
EMD Value
₹37,692
Closing Date
2 Apr 2026, 3:00 pmClosed
Executive Engineer
pocket I dilshad garden
Surface dressing , vegetation removal and Disposal of malwa/waste at various plots in Khajuri Khas.
2026_DDA_903618_1
28/EE/EMD-1/DDA/2025-26
Open Tender
Civil Works
Percentage
45 days
As per NIT
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹37,692
23 Apr 2026
25 Mar 2026
4 Apr 2026
25 Mar 2026
2 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | |||||
| 2Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m All kinds of soil. | |||||
| 3Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | |||||
| 54GST correction factor @ 0.973 | |||||
| 55Cost Index 3% | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
NIT28.pdf
Tender Documents • 2.24 MB
BOQ_949798.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .