Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
1 Sept 2026, 5:00 pm
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of 11 Nos kiosks in Sector-20, YEA WC -02
2026_YEIDA_1178363_1
YEA/GM(PROJECT)/2026/566 DT-18/08/2026
Open Tender
Civil Works
Fixed-rate
279 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,680
₹3.0 L
20 Aug 2026
20 Aug 2026
2 Sept 2026
20 Aug 2026
1 Sept 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50m and lead upto 30M and including filling watering and ramming of excavated earth into trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30M from the foundation trenches. (Where machine can not reach/move) For building work only) (UPPWD/SOR-2020/251(b)) Depth from 0.0 to 1.5 M below G.L. | 299.42 | Cum | 72.8 | ₹21,797.78 |
| 2 | Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (UPPWD/SOR-2020/281) | 271.26 | Cum | 5,820 | ₹15,78,733.2 |
| 3.01 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete. (DAR/5.9.1/Based on UPPWD/SOR-2020)) | 92.4 | Sqm | 181.65 | ₹16,784.46 |
| 3.02 | Columns, Pillars, Piers, Abutments, Posts and Struts. (DAR/5.9.6/Based on UPPWD/SOR-2020)) | 963.6 | Sqm | 426.8 | ₹4,11,264.48 |
| 3.03 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. (DAR/5.9.5/Based on UPPWD/SOR-2020)) | 611.93 | Sqm | 337.65 | ₹2,06,618.16 |
| 3.04 | Suspended floors, roofs, landings, balconies and access platform (DAR/5.9.3/Based on UPPWD/SOR-2020)) | 568.48 | Sqm | 386.35 | ₹2,19,632.25 |
| 3.05 | Arches, domes, vaults up to 6 m span (DAR/5.9.9/Based on UPPWD/SOR-2020)) | 598.95 | Cum | 1,081.05 | ₹6,47,494.9 |
| 4 | M-150 brick work in 1:4 one cement and four course sand 2.20 F.M. mortar in foundation and plinth including supply of all material, labour, T&P etc. required for proper completion of the work. (UPPWD/SOR-2020/305(a) | 90.2 | Cum | 4,950 | ₹4,46,490 |
| 5 | M-150 brick work in 1:4 one cement and four course sand 2.20 F.M. mortar including supply of all material, labour, T&P etc. required for proper completion of the work.
But in superstructure including necessary Cutting & moulding of brick as required thickness of walls not to be less than 1½ brick. Add extra labour to above items. (UPPWD/SOR-2020/309) | 113.96 | Cum | 5,230 | ₹5,96,010.8 |
| 6 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. (DAR/10.25.2/Based on UPPWD/SOR-2020)) | 596.75 | kg | 101.1 | ₹60,331.42 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
1.pdf
Tender Documents • 1.71 MB
BOQ_2214355.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].