| 1 | L1₹14.6 LAccepted-AOC | L1 | Accepted-AOC Accepted due to lowest rates | |
| 2 | L2₹14.8 L+₹21,552 (1.48%)Rejected-Finance VIDYUT BHAWAN HPSEBL SHIMLA 171004 | SHIMLA | HIMACHAL PRADESH | 171004 | L2 | Rejected-Finance The rates are on higher side hence rejected | |
| 3 | L3₹14.9 L+₹32,490 (2.23%)Rejected-Finance | L3 | Rejected-Finance The rates are on higher side hence rejected | |
| 4 | L4₹15.0 L+₹40,996.80 (2.81%)Rejected-Finance NOT AVAILABLE | NEW DELHI | DELHI | 110001 | L4 | Rejected-Finance The rates are on higher side hence rejected | |
| 5 | L5₹16.5 L+₹1.9 L (13.1%)Rejected-Finance | L5 | Rejected-Finance The rates are on higher side hence rejected |
Tender Value
₹12.3 L
EMD Value
₹25,000
Closing Date
28 Dec 2020, 10:30 amClosed
Executive Engineer RB MC Shimla
Executive Engineer RB MC Shimla
Channelization of M C Nallah from Thapar House to Ajeet House Ward No 5
2020_MC_43327_3
3151Dated23112020
Open Tender
Civil Works
Item Rate
90 days
Shimla
Please refer Tender Documents
7 documents required · 7 mandatory
₹500
Executive Engineer RB MC Shimla
₹25,000
7 Jun 2021
17 Dec 2020
28 Dec 2020
17 Dec 2020
28 Dec 2020
17 Dec 2020
Amount
Excavation in earth work in all kinds of earth work including spade work, pick work, jumper work, B/work chiseling wedging out of rock etc. up to all lifts in earth work including dressing of sides and bed and disposing of excavated earth to be leveled and neatly dressed as directed by the Engineer-in-charge. (Disposal of earth/muck in MC dumping site at Bharyal free of cost, transportation charges will be paid extra)
Providing and laying cement concrete 1:6:12 (1 cement: 6 sand: 12 graded stone aggregate 40mm nominal size) and curing complete excluding cost of centring and shuttering in Foundation and plinth
Providing from work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling upto all heights and removal of the same for insitu-reinforced concrete & plain concrete work in Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters buttresses, plinth and string courses and the like
Providing mild steel/ Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor all level-tor steel
Providing and laying cement concrete 1:1.5:3(1 cement :1.5: Sand : 3 graded stone aggregate 20 mm nominal size) and curing complete exculding cost of form work and reinforcement for reinforced concrete work in :wall (any thickness but not less than 0.1 m thickness) attached pilasters, buttresses, plinth and string couress etc. from top of foundation level upto floor two level:
Stone soling properly hand packed filling interstices with kharanja stone and consolidating with power road roller to the required gradient and comber including spreading, watering and rolling of binding materials moorum or earth etc. complete as per HPPWD specification. 100mm spread thickness (finished work including materials and labour)
Providing and laying cement concrete 1:2:4 (1 cement: 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in Foundation and plinth.
narinder kumar
Mudit Saini
PUSHPENDER SHARMA
MANISH KUMAR
Rakesh Kumar Pundir
Sajad Ahmed
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .