Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-Finance | L1 | Accepted-Finance Low Rate | |
| 2 | L2₹20.5 L+₹53,831 (2.69%)Rejected-Finance | L2 | Rejected-Finance High Rate | |
| 3 | Rejected-Technical | - | Rejected-Technical Document Found Not Ok |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
19 Sept 2024, 3:00 pmClosed
SUPERINTENDING ENGINEER EDC Mirzapur
SUPERINTENDING ENGINEER EDC Mirzapur
Construction of 11 kv line under Deposit Scheme EDD-I MIRZAPUR
2024_PVVNV_936403_2
35/EDC(M)/24-25
Open Tender
Electrical Works
Lump-sum
180 days
SUPERINTENDING ENGINEER EDC Mirzapur
Please Refer Tender Document
2 documents required · 2 mandatory
₹3,540
Executive Engineer(A)
₹20,000
25 Sept 2024
28 Aug 2024
20 Sept 2024
28 Aug 2024
19 Sept 2024
28 Aug 2024
Amount
Supply of following Decentralized materials at the works site as per RESSPO norms
X-arms holding clamps with bolts & nuts for ST/PCC pole. (Provided by Contractor)
M.S clamp for T-off channel with bolts & nuts for ST/PCC pole. (Provided by Contractor)
Stone pad, 300x300x75 mm. (Provided by Contractor)
F-bracket with bolts & nuts for ST/PCC pole. (Provided by Contractor)
Danger Board with clamps & bolts for ST/PCC pole. (Provided by Contractor)
Gaurding Angle Clamps for ST/PCC pole. (Provided by Contractor)
E-bracket with bolts & nuts. (Provided by Contractor)
Clamps with nuts & bolts for Top /Dropper Channel for ST/PCC pole. (Provided by Contractor)
PG clamps. (Provided by Contractor)
Stay Clamp. (Provided by Contractor)
LT Clamp. (Provided by Contractor)
LT shackle insulator. (Provided by Contractor)
Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge
ST Pole 11 mtr long. (Provided by Department)
PCC Pole 8.5 mtr long. (Provided by Department)
Line materials with ACSR Weasel Conductor etc. (Provided by Department)
Transformer 10 KVA. (Provided by Department)
Transformer 25 KVA (Provided by Department)
Transformer 63 KVA (Provided by Department)
Transformer 100 KVA. (Provided by Department)
11 KV XLPE Cable size 3x70/120/185 mm2. (Provided by Department)
11 KV Pilfer proof metering cubicle. (Provided by Department)
11 KV CT/PT combined unit. (Provided by Department)
Erection
Erection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Earthing of Poles
Erection of Sectional Double Pole Structure of ST/PCC pole including digging of pit, fitting of accessories, back filling of earth, earthing, grouting of each pole & all stay sets (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) & other required works.
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering.
Stringing & sagging of LT line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering.
Drill/cut of stone for erection of Pole/Stay in hilly area
Mounting of 10 KVA Transformer alongwith HT & LT connections as per RESSPO norms.
Mounting of 25 KVA Transformer alongwith HT & LT connections as per RESSPO norms.
Mounting of 63 KVA Transformer alongwith HT & LT connections as per RESSPO norms.
Mounting of 100 KVA Transformer alongwith HT & LT connections as per RESSPO norms.
Laying of 11 KV XLPE Cable alongwith cost of bricks & sand as per RESSPO norms
Gaurding of 11 KV line as per RESSPO norms
Filling of cable jointing kit size 3x70/120/185 mm2 11 KV indoor & outdoor type as per RESPO norms
Installation of 11 KV Pilfer proof metering cubicle inside meter room, by fixing rag bolts after checking alignment with trench & conneting incomming & outgoing cable in the CT chamber as per RESPO norms
Installation of CT/PT combined unit as per RESPO norms
Receive back material of ACSR weasel/dog conductor etc from work site to store centre mzp
Receive back material of scrap iron from work site to store centre mzp
M/S D.K. CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .