| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC | ₹1.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 LRejected-AOC | ₹1.4 L | L2 | Rejected-AOC L2 |
| 3 | L3₹1.4 LRejected-AOC | ₹1.4 L | L3 | Rejected-AOC L3 |
| 4 | L4₹1.7 LRejected-AOC | ₹1.7 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | P PICHANDI L4 | THANIGAIVEL L2 | V MANI L1 | K NANDAKUMAR L3 |
|---|---|---|---|---|---|---|---|
| 1.00Arcot Block | |||||||
| 2.00Repairs and Renovation of PUE School RCC Roof Building North Facing in K Velur Panchayat in Arcot Block Ranipet District | |||||||
| 3.00 | Dismantling of Plastering with Cement morter including cost and conveyance etc complete | 7.98 | Sqm | 765.23 ₹6,106.54 | 41.5 ₹331.17 | 36.29 ₹289.59 | 43.2 ₹344.74 |
| 4.00 | Plastering with cement mortar 1:3 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 7.98 | Sqm | 298.26 ₹2,380.11 | 328 ₹2,617.44 | 275.62 ₹2,199.45 | 328.1 ₹2,618.24 |
| 5.00 | Dismantling of Damaged Weathering course and pressed tiles including cost and conveyance etc complete | 0.32 | Cum | 68.5 ₹21.92 | 48.99 ₹15.68 | 41.33 ₹13.23 | 49.2 ₹15.74 |
| 6.00 | Roof top finish with One course of Pressed tiles set in C.M.1:3 including cost and conveyance and all labour charges etc | 3.24 | Sqm | 1,317.5 ₹4,268.70 | 1,330.54 ₹4,310.95 | 1,117.65 ₹3,621.19 | 1,330.54 ₹4,310.95 |
| 7.00 | Distembering on old wall surface two coat with oil bound distember paint over one coat of primer including scraping old wall surface cleaning etc complete | 201.11 | Sqm | 316.02 ₹63,554.78 | 206 ₹41,428.66 | 176.22 ₹35,439.60 | 209.78 ₹42,188.86 |
| 8.00 | Exterior emulsion painting on old wall surface two coat with plastic emulsion paint over one coat of primer including scraping old wall surface cleaning etc complete | 176.66 | Sqm | 240.48 ₹42,483.20 | 260.44 ₹46,009.33 | 220.48 ₹38,950 | 262.48 ₹46,369.72 |
| 9.00 | Black board Painting Two coats using black oxide for Old blackboard including cost and conveyance of paint and all labour charges etc complete | 39.93 | Sqm | 239.2 ₹9,551.26 | 248.44 ₹9,920.21 | 209.29 ₹8,356.95 | 249.16 ₹9,948.96 |
| 10.00 | Painting two coats over old iron works using ready mixed enamel pincluding cost and conveyance of paint and all labour charges etc complete | 52.29 | Sqm | 158.58 ₹8,292.15 | 153.07 ₹8,004.03 | 128.58 ₹6,723.45 | 153.07 ₹8,004.03 |
Tender Value
Refer Docs
EMD Value
₹1,510
Closing Date
24 Feb 2026, 3:00 pmClosed
Arcot BDO Office
Arcot BDO Office
Repairs and Renovation of PUE School RCC Roof Building North Facing in K Velur Panchayat in Arcot Block Ranipet District
2026_RDTN_658285_1
A2/014/2026
Open Tender
Civil Works
30 days
Arcot BDO Office
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1,510
22 Mar 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
Arcot Block
Repairs and Renovation of PUE School RCC Roof Building North Facing in K Velur Panchayat in Arcot Block Ranipet District
Dismantling of Plastering with Cement morter including cost and conveyance etc complete
Plastering with cement mortar 1:3 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Dismantling of Damaged Weathering course and pressed tiles including cost and conveyance etc complete
Roof top finish with One course of Pressed tiles set in C.M.1:3 including cost and conveyance and all labour charges etc
Distembering on old wall surface two coat with oil bound distember paint over one coat of primer including scraping old wall surface cleaning etc complete
Exterior emulsion painting on old wall surface two coat with plastic emulsion paint over one coat of primer including scraping old wall surface cleaning etc complete
Black board Painting Two coats using black oxide for Old blackboard including cost and conveyance of paint and all labour charges etc complete
Painting two coats over old iron works using ready mixed enamel pincluding cost and conveyance of paint and all labour charges etc complete
Electrification
Tube light
Plug point
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
TB.pdf
Tender Documents • 0.36 MB
BOQ_789720.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid