| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹16.6 LAccepted-AOC | ₹16.6 L | l1 | Accepted-AOC l1 |
| 2 | l2₹16.9 L+₹25,692.14 (1.54%)Rejected-Finance | ₹16.9 L+₹25,692.14 (1.54%) | l2 | Rejected-Finance l2 |
| 3 | l3₹16.9 L+₹31,438.74 (1.89%)Rejected-Finance TAMIL NADU | TIRUVANNAMALAI | TAMIL NADU | 604401 | ₹16.9 L+₹31,438.74 (1.89%) | l3 | Rejected-Finance l3 |
| Sl No | Description | Qty | Unit | Sivalingam L2 | M VELU L1 | KUMAR L3 |
|---|---|---|---|---|---|---|
| 1.00Construction of Anganwadi Building at Srilankan Refuge Camp H/O Banavaram Panchayat | ||||||
| 2.00 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundation | 34.79 | CUM | 150 ₹5,219 Lowest | 245 ₹8,524 | 290 ₹10,089 |
| 3.00 | Collection and supply of Gritty gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 21.62 | CUM | 280.34 ₹6,061 | 250 ₹5,405 Lowest | 280.34 ₹6,061 |
| 4.00 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation | 8.65 | CUM | 5,557.46 ₹48,072 | 5,500 ₹47,575 Lowest | 5,557.46 ₹48,072 |
| 5.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. Below GL | 4.7 | CUM | 6,231.15 ₹29,286 | 6,100 ₹28,670 Lowest | 6,231.15 ₹29,286 |
| 6.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. Above GL | 36.81 | CUM | 6,324.02 ₹2,32,787 | 6,150 ₹2,26,382 Lowest | 6,324.02 ₹2,32,787 |
| 7.00 | Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 8.17 | CUM | 9,309.11 ₹76,055 | 9,150 ₹74,756 Lowest | 9,309.11 ₹76,055 |
| 8.00 | Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 13.28 | CUM | 9,450.18 ₹1,25,498 | 9,200 ₹1,22,176 Lowest | 9,450.18 ₹1,25,498 |
| 9.00 | Below GL | 38.74 | Sqm | 547.5 ₹21,210 | 530 ₹20,532 Lowest | 547.5 ₹21,210 |
| 10.00 | Above GL | 133.3 | Sqm | 1,095 ₹1,45,964 | 1,060 ₹1,41,298 Lowest | 1,095 ₹1,45,964 |
Tender Value
Refer Docs
EMD Value
₹17,250
Closing Date
2 Jul 2026, 3:00 pmClosed
Block Development Officer VP
Perumbulipakkam Pu Office
Construction of Anganwadi Building at Srilankan Refuge Camp H/O Banavaram Panchayat
2026_RDTN_682210_1
A4/204/2025
Open Tender
Civil Works - Buildings
Item Rate
BLOCK DEVELOPMENT OFFICE KAVERIPAKKAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹17,250
Yes
perumbulipakkam
10 Aug 2026
22 Jun 2026
2 Jul 2026
22 Jun 2026
2 Jul 2026
22 Jun 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Anganwadi Building at Srilankan Refuge Camp H/O Banavaram Panchayat | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundation | 34.79 | CUM | - | - |
| 3 | Collection and supply of Gritty gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 21.62 | CUM | - | - |
| 4 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation | 8.65 | CUM | - | - |
| 5 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. Below GL | 4.7 | CUM | - | - |
| - | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. Above GL | 36.81 | CUM | - | - |
| - | Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 8.17 | CUM | - | - |
| - | Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 13.28 | CUM | - | - |
| 9 | Below GL | 38.74 | Sqm | - | - |
| - | Above GL | 133.3 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
TC1.pdf
Tender Documents • 0.52 MB
BOQ_819980.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .