Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance NA | L1 | Admitted-Finance | ||
| 2 | L2₹1.5 L+₹4,539.38 (3.20%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.5 L+₹11,860.97 (8.36%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-NOT RESIDENT OF PANCHAYAT BADYAL QAZIAN |
Tender Value
₹1.5 L
EMD Value
₹2,920
Closing Date
27 Jul 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Const. of lane drain from house of Sat Pal to onwards at village Sidher Pyt. Badyal Quazian at Panchayat Badyal Quazian, Block Suchetgarh under District capex PRI 26-27,Pyt level , 1st Call
2026_RDPR_315771_5
e-NIT No. 116 REWJ of 2026-27 dated 13-07-2026
Open Tender
Civil Works
Percentage
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹2,920
3 Aug 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
27 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | CUM | - | - |
| 2 | 60 mm thick C.C. paver block of M-30 grade with approved color design and pattern. | - | sqm | 1 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1 | cum | - | - |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | CUM | 1 | - |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. | - | kg | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: mass concrete foundations | - | sqm | - | - |
| 7 | Carriages of material by MT Sand 30 km | - | cum | - | - |
| 8 | Providing and fixing Display Board writing and Lettering Complete | - | no | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1026154.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .