Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.9 LAccepted-AOC 22099 ST NO 10 2 POWER HOUSE ROAD BATHINDA | BATHINDA | BATHINDA | PUNJAB | ₹41.9 L | L1 | Accepted-AOC BEING L1 |
| 2 | L2₹41.9 LRejected-Finance 1083 BAZAR MORE GANJ MORE GANJ SAHARANPUR SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | ₹41.9 L | L2 | Rejected-Finance BEING L2 |
| 3 | L3₹44.4 LRejected-Finance GRAIN MARKET GONIANA BATHINDA | BATHINDA | BATHINDA | PUNJAB | ₹44.4 L | L3 | Rejected-Finance BEING L3 |
| 4 | L4₹44.9 LRejected-Finance | ₹44.9 L | L4 | Rejected-Finance BEING L4 |
| 5 | L5₹46.5 LRejected-Finance | ₹46.5 L | L5 | Rejected-Finance BEING L5 |
| Sl No | Description | Qty | Unit | BHARAT BHUSHAN BANSAL CONTRACTOR L2 | AGGARWAL AND SONS L1 | GOBIND RAM AND CO L3 | V J CONSTRUCTION COMPANY L5 | PYUSH BASSI GOVT. CONTT. L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Routine inspection of cooling towers and attending defects involving works as under:- a) Inspection of 4 Nos. cooling towers minimum once a week of each cooling tower. b) Attending to defects noted in the splashing nozzles, SS wire hangers, PVC fill blocks and distribution pipe etc. c) Cleaning of internal plateforms/ walkways. ( Min. Once in a week) d) General cleanliness around cooling tower up to 15 mtr from periphery). e) Any other exigency as directed by Engineer-in-charge from time to time. | ||||||||
| 1.01 | Exection of above works by deploying 2 no. Skilled workers. | 24 | Job per Month | 50,700 ₹12.2 L | 47,989 ₹11.5 L | 50,500 ₹12.1 L | 51,790 ₹12.4 L | 50,099 ₹12.0 L |
| 1.02 | Exection of above works by deploying 2 no. UnSkilled workers. | 24 | Job per Month | 44,000 ₹10.6 L | 43,989 ₹10.6 L | 44,200 ₹10.6 L | 45,790 ₹11.0 L | 44,099 ₹10.6 L |
| 2.00 | Deployment of 4 no. sweepers (USW) for cleaning / sweeping/Collection of spilled Ash from roads leading to Ash Silos stage-I & II, area around Ash Silos & around 100 MT Weigh Bridge to improve the environment conditions in this area including sprinkling of water with flexible PVC pipe etc as per requirement complete. | 24 | Job per Month | 88,500 ₹21.2 L | 87,989 ₹21.1 L | 88,300 ₹21.2 L | 91,790 ₹22.0 L | 89,000 ₹21.4 L |
| 3.00 | Deployment of Tractor Trolley for lifting & disposal of Ash Spilled from top of Ash tankers & collected on the road / berms of roads leading to Ash Silos stage-I & II, area around Ash Silos & around 100 MT Weigh Bridge with in a lead of 2 KM's in plant area as directed by Engineer- in- charge. | 500 | Pe trolley trip of 3 cum. | 495 ₹2.5 L | 500 ₹2.5 L | 505 ₹2.5 L | 350 ₹1.8 L | 500 ₹2.5 L |
| Sl.NoBidder Name | ||||||||
| 1 | BHARAT BHUSHAN BANSAL CONTRACTOR (BID ID -716462) | 45,69,208 | 4491535.00 | - | - | - | - | - |
| 2 | PYUSH BASSI GOVT. CONTT. (BID ID -716510) | 45,69,208 | Not Quoted | - | - | - | - | - |
| 3 | AGGARWAL AND SONS (BID ID -716597) | 45,69,208 | 4194550.00 | - | - | - | - | - |
| 4 | V J CONSTRUCTION COMPANY (BID ID -716568) | 45,69,208 | 4189981.00 | - | - | - | - | - |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
30 Jan 2026, 3:00 pmClosed
ASE/PCM
ASE/PCM/GHTP LEHRA MOHABAT
Annual Mtc of Cooling Towers and sweeping of roads leading to Ash Silos Stage 1 and 2 at GHTP Lehra Mohabat
2026_POWER_157122_1
512/PCM-518/2025-26
Open Tender
Civil Works
365 days
GHTP LEHRA MOHABAT
AS PER NIT
4 documents required · 4 mandatory
₹1,180
Yes
₹1.1 L
Yes
25 Mar 2026
2 Jan 2026
2 Feb 2026
2 Jan 2026
30 Jan 2026
2 Jan 2026
Routine inspection of cooling towers and attending defects involving works as under:- a) Inspection of 4 Nos. cooling towers minimum once a week of each cooling tower. b) Attending to defects noted in the splashing nozzles, SS wire hangers, PVC fill blocks and distribution pipe etc. c) Cleaning of internal plateforms/ walkways. ( Min. Once in a week) d) General cleanliness around cooling tower up to 15 mtr from periphery). e) Any other exigency as directed by Engineer-in-charge from time to time.
Exection of above works by deploying 2 no. Skilled workers.
Exection of above works by deploying 2 no. UnSkilled workers.
Deployment of 4 no. sweepers (USW) for cleaning / sweeping/Collection of spilled Ash from roads leading to Ash Silos stage-I & II, area around Ash Silos & around 100 MT Weigh Bridge to improve the environment conditions in this area including sprinkling of water with flexible PVC pipe etc as per requirement complete.
Deployment of Tractor Trolley for lifting & disposal of Ash Spilled from top of Ash tankers & collected on the road / berms of roads leading to Ash Silos stage-I & II, area around Ash Silos & around 100 MT Weigh Bridge with in a lead of 2 KM's in plant area as directed by Engineer- in- charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
TENDERNIT.pdf
Tender Documents • 0.72 MB
BOQ_318480.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid