Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance ALIGARH | UTTAR PRADESH | 202001 | L1 | Accepted-Finance Lottery L1 | |
| 2 | L1₹1.1 CrRejected-Finance 12 ATRAULI KHERA PATAN SARAI DHODA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | L1 | Rejected-Finance Reject | |
| 3 | L1₹1.1 CrRejected-Finance ALIGARH UTTAR PRADESH UP | L1 | Rejected-Finance Reject | |
| 4 | L1₹1.1 CrRejected-Finance 0 CHINHAT LUCKNOW UTTAR PRADESH 227105 | 227105 | L1 | Rejected-Finance Reject | |
| 5 | L1₹1.1 CrRejected-Finance GRAM MADHAIYA DHARMASINH NAJRA BIROLA KHAIR DISTRICT ALIGARH | KHAIR | ALIGARH | UTTAR PRADESH | L1 | Rejected-Finance Reject |
Tender Value
₹1.4 Cr
EMD Value
₹9.2 L
Closing Date
18 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE PD PWD ALIGARH
OFFICE OF THE EE PD PWD ALIGARH
New Construction work of Baharpur to Bulandshahar ki seema tak marg
2026_CEALG_1199955_1
4524-13A Dt-15.10.2026
Open Tender
Civil Works
Fixed-rate
300 days
OFFICE OF THE EE PD PWD ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹9.2 L
Yes
23 Nov 2026
23 Oct 2026
18 Nov 2026
23 Oct 2026
18 Nov 2026
23 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part-A (CC work)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Carted Earth) & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. | 9,600 | cum | 105 | ₹10,08,000 |
| 2 | Costruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T | 663 | cum | 3,060 | ₹20,28,780 |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4 to 53 mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregates, watering and compacting to the required density grading 3 as per Technical Clause 405(3) & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. | 475 | cum | 3,570 | ₹16,95,750 |
| 4 | Construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side from work (steel channel laying and fixing of 125 micron thick plastic sheet, wedges steel plates including levelling the form work as per drawing) spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continuous opration including provision of contraction and expansion construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification (approved Quarri grit) (CH-20, SI.No.20) & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. | 950 | cum | 8,000 | ₹76,00,000 |
| 5 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Carted Earth) & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. | 2,350 | cum | 95 | ₹2,23,250 |
| 6 | Kilometre stone
Reinforced cement concret M-15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc as per drawing and Technical specification cluase 1703 & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. | 3 | Nos | 2,700 | ₹8,100 |
| 7 | Hectometer Stone
Reinforced cement concret M-15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing etc as per drawing and Technical specification cluase 1703 & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. | 7 | Nos | 700 | ₹4,900 |
| 8 | Part-B (Culvert work)
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. | 22 | cum | 38 | ₹836 |
| 9 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (M 10) & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. | 19 | cum | 6,940 | ₹1,31,860 |
| 10 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications Clause no.600,1202&1203 & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T. | 19 | cum | 7,300 | ₹1,38,700 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
BOQ_2269707.xls
BOQ • 0.25 MB
4803.pdf
PDF • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .