Tender Value
₹5.1 Cr
EMD Value
₹6.4 L
Closing Date
5 Sept 2026, 5:00 pm
GM (Civil)/HOD, ECL
Civil Engineering Department, Office of the Chairman-cum-Managing Director Sanctoria, P.O. Dishergarh, Dist. Burdwan, West Bengal-713333
Strengthening of road with divider of Simra -Mohanpur Road to Simra Pokhar of Simra rehab site under Rajmahal Area.
2026_ECL_363788_1
ECL/HQ/GM(C)/e-Tender/26-27/18 date 14.08.2026
Open Tender
Civil Works - Roads
Percentage
60 days
Rajmahal
Please refer Tender documents.
5 documents required · 5 mandatory
₹6.4 L
20 Aug 2026
20 Aug 2026
7 Sept 2026
20 Aug 2026
5 Sept 2026
21 Aug 2026
20 Aug 2026 - 29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORKS | |||||
| 1.01 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of
scarified material within all lifts and lead upto 1km (by mechanical means).. | 15,171.5 | sqm | 4.75 | ₹72,064.63 |
| 1.02 | Granular Sub-Base (Table: - 400-1) Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-II | 2,275.73 | cum | 2,392.7 | ₹54,45,139.17 |
| 1.03 | Dry Lean Cement Concrete Sub- base: Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 1,517.15 | cum | 3,026.3 | ₹45,91,351.05 |
| 1.04 | Cement Concrete Pavement: Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 3,792.88 | cum | 7,007.85 | ₹2,65,79,934.11 |
| 1.05 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 607.5 | cum | 188.75 | ₹1,14,665.63 |
| 1.06 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 101.25 | cum | 1,061.6 | ₹1,07,487 |
| 1.07 | P/L in position cement concrete of specified grade excluding the Cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources). | 101.25 | cum | 5,434.55 | ₹5,50,248.19 |
| 1.08 | P/L in position cement concrete of specified grade excluding the Cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 cement
: 1.5 coarse sand (zone-III) derived from natural sources: 3graded stone aggregate 20 mm nominal size derived from natural sources). | 675 | cum | 6,458.3 | ₹43,59,352.5 |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass
concrete | 5,400 | sqm | 269.3 | ₹14,54,220 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.19 MB
Tendernotice_2.pdf
PDF • 0.68 MB
BOQ_376699.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].