Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance BLOCK NO 758 EAGLE NEST BEHIND CHOPRA COURT ULHASNAGAR 421003 DIST THANE | 421003 | Admitted-Finance |
| 3 | Admitted-Finance RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | Admitted-Finance |
| 4 | Admitted-Finance PLOT NO 61 KESHAV NAGAR HAWA SADAK JAIPUR RAJASTHAN 302006 | JAIPUR | RAJASTHAN | 302006 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹3.9 Cr
Closing Date
22 Apr 2024, 3:00 pmClosed
SE Circle office UPJN Rural Lko
SE Circle office UPJN Rural Lko
Interception and Diversion (I and D) and STP works at Lucknow, Phase-II Part-2, Uttar-Pradesh State, including Operation and Maintenance period of 15 years through Hybrid Annuity Based PPP Mode under Namami Gange Programme
2023_UPJNG_866688_1
2078/M-7/95, dt 29-11-2023
Open Tender
Construction Works
630 days
Bijnor
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.9 Cr
SE Circle office UPJN Rural Lko
26 Oct 2024
1 Dec 2023
22 Apr 2024
1 Dec 2023
22 Apr 2024
1 Dec 2023
15 Dec 2023
Amount
BIJNOR BID PROJECT COST
Bid Project Cost (including all taxes) for 100 MLD STP
Bid Project Cost (including all taxes) for Associated Infrastructure
BIJNOR O&M CHARGES
O&M charges for 100 MLD STP for first month after COD
Manpower
Maintenance and Repair
Consumables
Guaranteed Energy Consumption for 100 MLD STP for the first month after COD (Value should be entered in all cell from 2.06 to 2.11. The permissible value of maximum to minimum GEC quoted in cell 2.06 to 2.11 should be less than or equal to1.4 )
For flow ≤ 60 MLD and BOD ≤ 175 mg/L
For flow ≤ 60 MLD and BOD > 175 mg/L and ≤250 mg/L
For flow ≤ 60 MLD and BOD >250 mg/L
For flow > 60 MLD and BOD ≤ 175 mg/L
For flow > 60 MLD and BOD > 175 mg/L and ≤250 mg/L
For flow > 60 MLD and BOD >250 mg/L
STP Average GEC
Power Charges for 100 MLD STP (=100 MLD X Units Consumed/MLD X 5475 X 7.65 X 1.5) (Not to be filled by the Bidder)
O&M charges for Bijnor Associated Infrastructure for first month after COD
Manpower
Maintenance and Repair
Bijnor Associated Infrastructre Guaranteed Energy Consumption for first month after Bijnor COD (100 MLD capacity x Units Consumed/ MLD x 5475 x 7.65 x 1.5)
Land requirement (sqm) - 100 MLD STP at Bijnor (Circle rate is Rs 9000 per sq.m.) (Bidder is required to quote the land requirement under column 5 of this row subject to available land i.e. 34500 sqm)
Traders & Engineers Private Limited
JWIL INFRA LIMITED
Vishvaraj Environment Private Limited
Neercare India Pvt. Ltd.
ENVIRO INFRA ENGINEERS LIMITED
HNB ENGINEERS PVT LTD
ADANI WATER LIMITED
PULKIT PROJECTS PVT. LTD.
VA TECH WABAG LIMITED
M/s. Ashoka Buildcon Ltd
Eagle Infra India Ltd
Triveni Engineering and Industries Ltd
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid