| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹8.8 L (5.21%)Rejected-AOC | ₹1.8 Cr+₹8.8 L (5.21%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.1 Cr+₹36.9 L (21.8%)Rejected-AOC FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹2.1 Cr+₹36.9 L (21.8%) | L3 | Rejected-AOC L3 |
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
26 Jul 2024, 1:00 pmClosed
SE IWC, SRE
OFFICE OF THE SE IWC, SRE
Reconstruction work of Badhev Drain syphon at km 110.093 of Eastern Yamuna Canal in Distt. Shamli.
2024_UPIDC_938935_1
02/SE/SRE/2024-25
Open Tender
Civil Works
Item Wise
180 days
Shamli
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.6 L
23 Aug 2024
18 Jul 2024
26 Jul 2024
18 Jul 2024
26 Jul 2024
18 Jul 2024
Amount
Earth work in excavation in foundation in all types of soil including lift upto 1.5M and lead upto 30M and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M from the foundation tranches
Centering and shuttering for C.C work. Including cost of all material, T&P etc complete.
Centering and shuttering of R.C.C work. including cost of all material, T&P etc. complete.
C.C. M-15 (1:2:4) with Cement & Stone grit 4 mm to 20 mm size for concrete. Including cost of all Materials, Labour, T&P. etc. Complete.
C.C. M-20 (1:1.5:3) with Cement & Stone grit 4 mm to 20 mm size for concrete. Including cost of all Materials, Labour, T&P. etc. Complete.
R.C.C. M-25 (1:1:2) Including cost of all materials, labour and T&P etc. all completion of work.
Placing Steel Reinforcement for R.C.C. works Including cost of Materials,Cutting, Bending ,Binding,Welding, etc.Complete.
Laying Non cohesive/Cohesion less (ordanary sand) back filling adjoing the RCC structure. including cost of all labour and T&P.etc. complete.
Supply and Laying Settlement Joint with G.P/Copper/Stainless Steel water stop including cost of all labour and T&P etc.Complete.
Supplying and Fixing 225 MM wide P.V.C. water stop seal I/C Cost of all Materials , labour, T&P etc. required for proper complition of work./R.M
Supplying and Fixing 150 MM wide P.V.C. water stop seal I/C Cost of all Materials , labour, T&P etc. required for proper complition of work.
Earth work in filling or in embankment by power tranported earth including 1.50m lift and 1.00 Km lead. including excavation, loading, unloading, manual compaction, dressing and all complete.
Ist class Bricks (M-150) at site of work from Kiln lead upto 8 Km including all taxes and contractor's profit etc all.
Supplying and laying R.B.M for road diversion including cost of all materials, labour, T&P etc. required for proper completion of work.
Supplying and Fixing nomotex board 20 MM Thick in expantion joint I/C Cost of all Materials , labour, T&P etc. Equipment required for proper complition of work.
Supplying and Filling expantion joint with bitumen Filler I/C Cost of all Materials , labour, T&P etc. Equipment required for proper complition of work.
Supplying and Painting Epoxy water proofing paint (two coats) in barrel I/C Cost of all Materials , labour, T&P etc. Equipment required for proper complition of work.
Supply & Laying boulder 20-40 kg weight. Including Cost Of all Material,Labour,T&P etc.Complete
Removing of extra earth from water way and Road way for restore of canal section including cost of all materials, labour, T&P etc. required for proper completion of work.
M/S VAISHNAVI CONSTRUCTION COMPANY
MA AND SONS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .