| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.3 LAdmitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | L1 | Admitted-Finance | |
| 2 | L2₹1.7 Cr+₹86.1 L (98.6%)Admitted-Finance MIG 354 4TH CROSS STREET MOGAPPAIR ERI SCHEME CHENNAI 37 | CHENNAI | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K DHINAKARAN L1 | ULTRAPOWER BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying, fabrication, hot dip galvanising of tower parts confirming to IS 2629 - 1985 including cost of all materials, labour, charges, transporting, lead, lift, etc., complete. | 8 | MT | - | - |
| 2.00 | Supply of various size of bolts and nuts spring washer, packing washer, flat washer of 5.6 grade hot dip galvanised confirming to standard specification including cost of all materials, labour charge, lead, lift, etc., complete. | 0.2 | MT | - | - |
| 3.00 | Clearing of light jungle between tower location for pit marking and Stringing work | 2,000 | m2 | - | - |
| 4.00 | Labour Charges for conducting check survey, pegging, marking of pits for tower foundation as per the apporved profile including chaining and carring theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site. | 58 | Loc. | - | - |
| 5.00 | Hire charges for earth moving equipment (JCB) for clearing rubbish, levelling the site incuding cost of hire charges, fuel charges, all labour, lead and lift etc., complete. | 3 | Hrs | - | - |
| 6.00 | Earth work excavation and depositing on bank for foundation of towers including dewatering wherever necessary cost of all labour with initial lead of 2m etc., complete. Hard stuff clay, stuff black cotton soil , hard red earth shales murrams, gravel, stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil sand or other loose soils, silt, sandy loom and ordinary soil etc.,complete. | 1,441 | m3 | - | - |
| 7.00 | Earth work excavation and depositing on bank for foundation of towers including dewatering wherever necessary cost of all labour with initial lead of 2m etc., complete. soft disintregrated rock, laterite or soft rock or kanker not required blastilng. | 576.5 | m3 | - | - |
| 8.00 | Earth work excavation and depositing on bank for foundation of towers including dewatering wherever necessary cost of all labour with initial lead of 2m etc., complete. Medium & dense medium rock not requiring blasting | 432.5 | m3 | - | - |
| 9.00 | Earth work excavation and depositing on bank for foundation of towers including dewatering wherever necessary cost of all labour with initial lead of 2m etc., complete. Hard rock measured in soild including blasting & stacking | 288 | m3 | - | - |
| 10.00 | Earth work excavation and depositing on bank for foundation of towers including dewatering wherever necessary cost of all labour with initial lead of 2m etc., complete. Hard rock by wedging chiseling and trimming to proper shape where blasting is prohibited | 144 | m3 | - | - |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
6 Jan 2020, 2:30 pmClosed
CE/TP-I/CHN
A-10, Thiru-Vi-Ka Indl Estate, Guindy, Chennai-32
Earthwork excavation, stub setting, concreting , tower Erection from Location 174 to 231 and stringing of 6 Nos ACSR Panther Conductor from location 173 to 221 and stringing of 3 Nos ACSR panther conductor from Loc.221 to 231 and stringing of 1 No G
2019_EB_150663_1
TP1-093/2019-20
Open Tender
Civil Works - Others
Works
120 days
thiruvannamalai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.4 L
Yes
19 Feb 2020
9 Dec 2019
7 Jan 2020
9 Dec 2019
6 Jan 2020
9 Dec 2019
Amount
Supplying, fabrication, hot dip galvanising of tower parts confirming to IS 2629 - 1985 including cost of all materials, labour, charges, transporting, lead, lift, etc., complete.
Supply of various size of bolts and nuts spring washer, packing washer, flat washer of 5.6 grade hot dip galvanised confirming to standard specification including cost of all materials, labour charge, lead, lift, etc., complete.
Clearing of light jungle between tower location for pit marking and Stringing work
Labour Charges for conducting check survey, pegging, marking of pits for tower foundation as per the apporved profile including chaining and carring theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site.
Hire charges for earth moving equipment (JCB) for clearing rubbish, levelling the site incuding cost of hire charges, fuel charges, all labour, lead and lift etc., complete.
Earth work excavation and depositing on bank for foundation of towers including dewatering wherever necessary cost of all labour with initial lead of 2m etc., complete. Hard stuff clay, stuff black cotton soil , hard red earth shales murrams, gravel, stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil sand or other loose soils, silt, sandy loom and ordinary soil etc.,complete.
Earth work excavation and depositing on bank for foundation of towers including dewatering wherever necessary cost of all labour with initial lead of 2m etc., complete. soft disintregrated rock, laterite or soft rock or kanker not required blastilng.
Earth work excavation and depositing on bank for foundation of towers including dewatering wherever necessary cost of all labour with initial lead of 2m etc., complete. Medium & dense medium rock not requiring blasting
Earth work excavation and depositing on bank for foundation of towers including dewatering wherever necessary cost of all labour with initial lead of 2m etc., complete. Hard rock measured in soild including blasting & stacking
Earth work excavation and depositing on bank for foundation of towers including dewatering wherever necessary cost of all labour with initial lead of 2m etc., complete. Hard rock by wedging chiseling and trimming to proper shape where blasting is prohibited
Sinking well in loose soils,light block cotton soil, sandy loam and ordinary soil under water including bailing out and pumping chargers if necessary etc., complete.
Supplying and placing of pre cast RCC well rings having inner dia 1.80m, thickness 50mm and 0.30m depth including cost of 8mm RTS rod-3 nos longitudinally and 20cm c/c vertically including cost of all materials, dewatering, lead and lift etc., complete.
Bailing out of water by pump set including cost of diesel, pumpset 5 HP, cost of all materials, labour, lead and lift etc. complete
Labour charges for transportation and Assempling of templates required alingment and level including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site. GCR
Labour charges for transportation and Assempling of templates required alingment and level including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site. HCR
Labour charges for transportation and Assempling of templates required alingment and level including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site. KCR
Labour charges for transportation and Labour charges for Assempling of templates required alingment and level including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site. MD
Providing and laying P.C.C. 1:3:6 using 40mm HBG metal for foundation including cost of all materials, curing,labour, lead, Lift, labour for laying concrete etc., complete as per standard specification and as directed by the department engineer at site.
P.C.C 1:2:4 using 12 to 20mm HBG metal for foundation including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work
Providing and laying P.C.C 1:2:4 grade using 20mm HBG metal for chimney with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Supplying and providing Pipe type earthing with 40 mm dia GI pipe (medium class) including cost of all meterials, cutting of earth wire to the required length and connecting to the tower leg and earth pipe with 2 Nos. bolts, nuts, with washers, drilling charges etc., complete as per specification and as directed by the department engineer at site.
Providing and laying R:C:C 1:1.5:3 using 12 to 20mm HBG metal for with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Supplying, fabricating and placing in position of steel reinforcements including cost of steel,binding wire, labour for cutting, bending, tying, placing in correct possition, transport , lead, lift etc complete as per standard specification and as directed by the dept. Engineer at site
Refilling the foundation pits of towers after stub setting and concteting with excavated earth other than sand in layers of 150mm thick, including charges for spreading watering, consolidation as per standard specification and as directed by the Engineer at site including all labour charges lead and lifts etc., complete.
Removal of surplus earth wherever necessary including transport up to 2 km away from the site, loading and unloading, labour, lead, lift etc., complete as directed by the department engineer at site.
Spreading of surplus earth around the area including cost of all materials, labour, lead, lift etc., complete as directed by the department engineer at site.
Labour charge for erection of tower parts including sorting out of tower parts at store and site, rectification in tower parts if any, cost of T&P, labour,transport from GCC stores at Ambattur, Chennai, lead, lift, etc., complete as directed by the department engineer at site. under normal condition
Labour charge for erection of tower parts including sorting out of tower parts at store and site, rectification in tower parts if any, cost of T&P, labour,transport from GCC stores at Ambattur, Chennai, lead, lift, etc., complete as directed by the department engineer at site. under LC condition
Labour charges for welding of bolts and nuts at two places 1 cm each diagonally opposite each other after tightening and puching to avoid theft of tower parts with one coat of painting zinc coat in the welded portion including cost of welding rod, hire charge for generators, painting the bolts and nuts transporting labour, lead, lift etc complete as per instrution incharge of department engineer at site
Labour charges for providing special type trusstles for HT, LT line and road crossing including the cost of all materials, T&P, transport, labour, lead, lift etc., complete as per standard specification and as directed by the department engineer at site.
Providing bamboo trustles during conductor and earth wire stringing work wherever necessary amd as directed by the Board Engineer for telecom lines roads, railway rorssingetc., including cost of all materials transport, T&Ps labour leads and lifts etc., completeand dismantling after completion of stringing works in the crossing as above.
Providing temporary stay during rough sagging and tensioning including necessary excavation burying anchor strucutures fixing stay wire refillings and removal of stays after tensioning with cost of all materials, all labour leads, lifts, etc., complete.
Labour Charges for uprooting and removing small palmyrah / Coconut stumps as per standard specification complete in all respects
Labour Charges for uprooting and removing large palmyrah / Coconut stumps as per standard specification complete in all respects
Labour charges for Transporting and hoisting of 8 units 120 KN tension insulators with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site Under Normal Condition
Labour charges for Transporting and hoisting of 8 units 120 KN tension insulators with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site Under LC Condition
Labour charges for Transporting and hoisting of 14 units 120 KN tension insulators with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site Under Normal Condition
Labour charges for Transporting and hoisting of 7 units 90 KN anti fog suspension insulators with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site Under Normal Condition
Labour charges for Transporting and hoisting of 13 units 90 KN anti fog suspension insulators with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site Under LC Condition
Labour charges for paying out of 6 Nos ACSR panther conductor with fittings including sorting out of conductor according to drum schedule and loading and unloading at site providing trussels, cost of T & P lead and lift etc., complete (Single span in KM) Normal condition.
Labour charges for paying out of 3 Nos ACSR panther conductor with fittings including sorting out of conductor according to drum schedule and loading and unloading at site providing trussels, cost of T & P lead and lift etc., complete (Single span in KM) Normal condition.
Labour charges for rough sagging tensiioning, clipping of 6 Nos. ACSR Panther conductor with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. continious span
Labour charges for rough sagging tensiioning, clipping of 3 Nos. ACSR Panther conductor with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. continious span
Labour charges for rough sagging tensiioning, clipping of 6 Nos. ACSR Panther conductor with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Single span
Labour charges for rough sagging tensiioning, clipping of 3 Nos. ACSR Panther conductor with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Single span
Labour charges for rough sagging tensiioning, clipping of 6 Nos. ACSR Panther conductor with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Single span under LC condition
Labour charges for rough sagging tensiioning, clipping of 3 Nos. ACSR Panther conductor with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Single span under (Tower to Gantry)
labour charges for paying out and stringing of 1 no. GI 7/3.55 mm SWG steel earth wire with fittings cost of T&P lead and lift, etc., complete as directed by the department engineer at site. (continious span
Labour charges for rough sagging tensiioning, clipping of 1 No. GI earth wire with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Single span continious span
Labour charges for rough sagging tensiioning, clipping of 1 No. GI earth wire with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Single span single span
Labour charges for rough sagging tensiioning, clipping of 1 No. GI earth wire with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Single span single span under LC Condition
Labour charges for rough sagging tensiioning, clipping of 1 No. GI earth wire with fittings including cost of all T&P, labour, lead and lift etc., complete as directed by the department engineer at site. Single span single span tower to ground
Releasing and restringing of 3 Nos ACSR Zebra conductor including rough sagging, tensiong, clipping, providing vibration dampers, jumpering , cost of T&P, Lead, lift, etc., complete under LC condition
Releasing and restringing of 2 Nos. 7/3.15 steel earth wire including rough sagging, tensiong, clipping, providing vibration dampers, jumpering , cost of T&P, Lead, lift, etc., complete under LC condition
Providing and laying P.C.C 1:2:4 grade using 12 to 20mm HBG metal for with form work for muffing and copping using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Plastering in cement mortar 1:3, 12 mm thick including cost of all material scaffolding, curing, labour with all lifts etc., complete as directed by dept.Engineer at site
Painting tower legs using best qulity anticorroessive black paint two coats 1 m above coping including cost of all materials labour lead, lift etc., complete as directed by the department engineer at site.
Fabrication supply, painting with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site. Number board 9" X 6"
Fabrication supply, painting with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site. Fabrication and fixing phase plate (Set for 3 nos) 6" x 6"
Fabrication supply, painting with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site. Danger Board 24"x18"
Fabrication supply, painting with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower including cost of all materials, labour, T&P, transport, lead, lift, etc., complete as directed by the department engineer at site. Name board 36"x18"
Dismantling the exsisting Leopard conductor 3 wire from exsisting tension / suspension tower all T & P devoluting to stores including all materials ,labour, lead, lift, etc., complete.
Dismantling the exsisting GI earth wire from exsisting tension / suspension tower all T & P devoluting to stores including all materials, labour, lead, lift, etc., complete.
Dismantling the 7 unit suspension insulator under LC condition from from exsisting tension / suspension tower all T & P devoluting to stores labour lead, lift, etc., complete.
Dismantling the 8 unit tension insulator under LC condition from from exsisting tension / suspension tower all T & P devoluting to stores labour lead, lift, etc., complete.
Dismantling the exsisting 110 KV SC tower under LC condintion including all materials, labour, lead and lift etc., complete.
Taking the towers with bolt and nuts as is where is condition including cost of transport, lead, lift, etc., complete as directed by the department engineer at site
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
ULTRAPOWER BUILDERS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_181271.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .