| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 CrAccepted-AOC BHAWANI KRUPA GANDHI CHOWK PULGAON | PULGAON | WARDHA | MAHARASHTRA | ₹6.1 Cr | L1 | Accepted-AOC Being lowest bidder and bid found reasonable |
| 2 | L2₹7 Cr+₹88.9 L (14.6%)Rejected-Finance HINDUSTAN COLONY WARDHA ROAD PULGAON 442 302 | PULGAON | WARDHA | MAHARASHTRA | 442302 | ₹7 Cr+₹88.9 L (14.6%) | L2 | Rejected-Finance Other than lowest bidder |
| 3 | L3₹7.9 Cr+₹1.8 Cr (29.9%)Rejected-Finance 15 DEHBANOO COMPLEX NASHIK PUNE ROAD NASHIK 422101 | NASHIK | MAHARASHTRA | 422101 | ₹7.9 Cr+₹1.8 Cr (29.9%) | L3 | Rejected-Finance Other than lowest bidder |
| 4 | L4₹8.4 Cr+₹2.3 Cr (38.0%)Rejected-Finance SIBAL NIWAS BAGADGANJ POST OFFICE NAGPUR 440008 | NAGPUR | NAGPUR | MAHARASHTRA | 440008 | ₹8.4 Cr+₹2.3 Cr (38.0%) | L4 | Rejected-Finance Other than lowest bidder |
| 5 | L5₹9.0 Cr+₹2.9 Cr (48.0%)Rejected-Finance | ₹9.0 Cr+₹2.9 Cr (48.0%) | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | M/S JAI BHAWANI CONSTRUCTIONS L1 | SIBAL AND SIBAL L4 | SETH CONSTRUCTION COMPANY L9 | M/S.Chourasia Construction Company L2 | Beejay Associates Contracts Pvt Ltd L6 | KAIZEN INDUSTRIES L8 | RAJESH P MUNDHADA L5 | Accurate Power Systems L7 | Ramjidas Construction Pvt Ltd L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Note: (i) Please refer schedule 'A' notes before quoting the tender. (ii) Amount of Schedule of credit shall be deducted off line by the department. | ||||||||||||
| 2.00 | Earth work in any kind of soil, excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and directed. | 12,107.9 | Cum | 111 ₹13,43,976.9 Lowest | 133 ₹16,10,350.7 | 175 ₹21,18,882.5 | 150 ₹18,16,185 | 220 ₹26,63,738 | 185 ₹22,39,961.5 | 176.75 ₹21,40,071.32 | 195 ₹23,61,040.5 | 150 ₹18,16,185 |
| 3.00 | Earth work in excavation by mechanical means in any kind of soil (Hydraulic excavator) means over areas (exceeding 1.5m but n exceeding 3.00m in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and directed. | 4,670.19 | Cum | 141 ₹6,58,496.79 Lowest | 153 ₹7,14,539.07 | 185 ₹8,63,985.15 | 175 ₹8,17,283.25 | 250 ₹11,67,547.5 | 190 ₹8,87,336.1 | 217.79 ₹10,17,120.68 | 195 ₹9,10,687.05 | 150 ₹7,00,528.5 |
| 4.00 | Earth work in Hard Rock where blasting prohibited, excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and directed. | 345.94 | Cum | 611 ₹2,11,369.34 | 1,323 ₹4,57,678.62 | 1,550 ₹5,36,207 | 555 ₹1,91,996.7 | 500 ₹1,72,970 Lowest | 1,575 ₹5,44,855.5 | 963.66 ₹3,33,368.54 | 1,600 ₹5,53,504 | 2,100 ₹7,26,474 |
| 5.00 | Earth work in Hard Rock where blasting prohibited, excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 1.5m but n exceeding 3.00m in depth, 1.5 m in width as well as 10 sqm on plan) exc 1.5 m and n.exc 3.0m ht including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and directed. | 172.97 | Cum | 777 ₹1,34,397.69 | 1,383 ₹2,39,217.51 | 1,650 ₹2,85,400.5 | 651 ₹1,12,603.47 | 600 ₹1,03,782 Lowest | 1,650 ₹2,85,400.5 | 1,023.46 ₹1,77,027.88 | 1,650 ₹2,85,400.5 | 2,100 ₹3,63,237 |
| 6.00 | M & L for Forming embankment including raising (or lowering) by using moorum (brought from outside MD Land), spreading in layer exc 30 cm th watering, ramming, rolling and consolidated with 8 to 10 tonne power roller to required size, shape etc complete all as specified and directed. | 2,060.25 | Cum | 611 ₹12,58,812.75 | 653 ₹13,45,343.25 | 855 ₹17,61,513.75 | 500 ₹10,30,125 Lowest | 500 ₹10,30,125 Lowest | 878 ₹18,08,899.5 | 1,219.94 ₹25,13,381.39 | 900 ₹18,54,225 | 765 ₹15,76,091.25 |
| 7.00 | M &L for Forming embankment including raising (or lowering) by using Approved Earth (brought from Excavation ), spreading in layer exc 30 cm th watering, ramming, rolling and consolidated with 8 to 10 tonne power roller to required size, shape etc complete all as specified and directed. | 2,060.25 | Cum | 221 ₹4,55,315.25 | 273 ₹5,62,448.25 | 490 ₹10,09,522.5 | 150 ₹3,09,037.5 Lowest | 200 ₹4,12,050 | 495 ₹10,19,823.75 | 218.78 ₹4,50,741.49 | 500 ₹10,30,125 | 200 ₹4,12,050 |
| 8.00 | M&L Laying and compacting 200 mm thick (compacted thickness) Granular Sub Base Course (GSB) grading as per Grade I/II as specified Table 400-1 of MoRTH specifications for Road and Bridge works, 2013 as per Design Mix, in a single layer over compacted subgrade with natural sand, crushed gravel, crushed stone, crushed slag or combination thereof as per the grading required The materials are mechanically mixed, spread and leveling on the subgrade by using motor grader of adequate capacity, and rolling with vibratory roller of capacity 80-1 00 KN static weight for achieving required compaction density of atleast 98% of the Maximum Dry Density, consolidating to required gradient and camber with finished surface tolerances as per Table 900-1 of MoRTH specifications for Road and Bridge works, 2013 complete all as specified and directed | 1,235.5 | 10 Sqm | 2,421 ₹29,91,145.5 Lowest | 3,023 ₹37,34,916.5 | 4,000 ₹49,42,000 | 4,096 ₹50,60,608 | 4,600 ₹56,83,300 | 4,300 ₹53,12,650 | 6,650.16 ₹82,16,272.68 | 4,500 ₹55,59,750 | 4,000 ₹49,42,000 |
| 9.00 | M&L for Providing and Laying Dry lean Concrete (DLC) Design Mix concrete M10, 175 mm thick of aggregate gradation as per Table 1 of SP 49:2014 having 7 day average compressive strength not less than 7 MPa Minimum cement content not less than 140 Kg/Cum DLC mixed in Batching Plant, transported to site and laid by electronic sensor paver including spreading and compacting using high amplitude tamping bars of paver (initial compaction) further by double drum smooth wheeled vibratory rollers with 80-100 KN static weight to achieve minimum dry density not less than 98% of maximum Dry Density, necessary finishing etc and tolerances to be as per Table 900-1 of MoRTH specifications for Road and Bridge work 2013 complete all as specified and directed | 1,235.5 | 10 Sqm | 6,651 ₹82,17,310.5 | 8,263 ₹1,02,08,936.5 | 9,500 ₹1,17,37,250 | 6,300 ₹77,83,650 | 8,100 ₹1,00,07,550 | 10,450 ₹1,29,10,975 | 4,655.89 ₹57,52,352.1 Lowest | 11,200 ₹1,38,37,600 | 8,400 ₹1,03,78,200 |
| 10.00 | Supplying and laying 150 micron thick Polythene film, (Virgin Quality) water proof, wrinkle free without puncture as specified in the design with overlap between adjacent strips and at transverse joints as minimum 300mm.
Note :- No additional amount to be paid for overlap of polythene film. | 12,355 | Sqm | 41 ₹5,06,555 | 18.23 ₹2,25,231.65 Lowest | 35 ₹4,32,425 | 84 ₹10,37,820 | 60 ₹7,41,300 | 30 ₹3,70,650 | 89.2 ₹11,02,066 | 25 ₹3,08,875 | 60 ₹7,41,300 |
Tender Value
₹10.1 Cr
EMD Value
₹8.3 L
Closing Date
15 Jun 2026, 6:00 pmClosed
Chief Engineer Bhopal Zone
HQ CHIEF ENGR BHOPAL ZONE, MES SI LINE BHOPAL 462001
CONSTRUCTION OF 02 X HARDSTANDING AREAS OF SIZE 130 X 40 MTR AND 150 X 40 MTR WITH ALLIED INFRA AT CAD PULGAON
2026_MES_766152_1
CEBZ/PUL/TOKEN/29 OF 2025-26
Open Tender
Civil Works
Item Rate
450 days
Pulgaon
As per NIT Documents
4 documents required · 4 mandatory
₹3,000
GE Pulgaon
₹8.3 L
12 Aug 2026
18 May 2026
17 Jun 2026
18 May 2026
15 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Earth work in any kind of soil, excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and directed. | 12,107.9 | Cum | - | - |
| 3 | Earth work in excavation by mechanical means in any kind of soil (Hydraulic excavator) means over areas (exceeding 1.5m but n exceeding 3.00m in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and directed. | 4,670.19 | Cum | - | - |
| 4 | Earth work in Hard Rock where blasting prohibited, excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and directed. | 345.94 | Cum | - | - |
| 5 | Earth work in Hard Rock where blasting prohibited, excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 1.5m but n exceeding 3.00m in depth, 1.5 m in width as well as 10 sqm on plan) exc 1.5 m and n.exc 3.0m ht including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, complete all as specified and directed. | 172.97 | Cum | - | - |
| 6 | M & L for Forming embankment including raising (or lowering) by using moorum (brought from outside MD Land), spreading in layer exc 30 cm th watering, ramming, rolling and consolidated with 8 to 10 tonne power roller to required size, shape etc complete all as specified and directed. | 2,060.25 | Cum | - | - |
| 7 | M &L for Forming embankment including raising (or lowering) by using Approved Earth (brought from Excavation ), spreading in layer exc 30 cm th watering, ramming, rolling and consolidated with 8 to 10 tonne power roller to required size, shape etc complete all as specified and directed. | 2,060.25 | Cum | - | - |
| 8 | M&L Laying and compacting 200 mm thick (compacted thickness) Granular Sub Base Course (GSB) grading as per Grade III as specified Table 400-1 of MoRTH specifications for Road and Bridge works, 2013, in a single layer over compacted subgrade with natural sand, crushed gravel, crushed stone, crushed slag or combination thereof as per the grading required The materials are mechanically mixed, spread and leveling on the subgrade by using motor grader of adequate capacity, and rolling with vibratory roller of capacity 80-1 00 KN static weight for achieving required compaction density of atleast 98% of the Maximum Dry Density. Consolidating to required gradient and camber complete all as specified and directed with finished surface tolerances as per Table 900-1 of MaRTH specifications for Road and Bridge works, 2013 | 1,235.5 | 10 Sqm | - | - |
| 9 | M&L for Providing and Laying Dry lean Concrete (DLC) 150 mm thick of aggregate gradation as per Table 1 of SP 49:2014 having 7 day average compressive strength not less than 7 MPa Minimum cement content not less than 140 Kg/Cum DLC mixed in Batching Plant, transported to site and laid by electronic sensor paver including spreading and compacting using high amplitude tamping bars of paver (initial compaction) further by double drum smooth wheeled vibratory rollers with 80-100 KN static weight to achieve minimum dry density not less than 98% of maximum Dry Density, necessary finishing etc complete all as specified and tolerances to be as per Table 900-1 of MoRTH specifications for Road and Bridge work 2013 | 1,235.5 | 10 Sqm | - | - |
| 10 | Supplying and laying 150 micron thick Polythene film, (Virgin Quality) water proof, wrinkle free without puncture over sand cushion as specified in the design with overlap between adjacent strips and at transverse joints as minimum 300mm. | 12,355 | Sqm | - | - |
| 11 | Material and laying 10 mm thick sand cushion with clean river sand duly clear of residual , organic and deleterious materials spread evenly to uniform thickness laid over DLC layer as specified and directed. (No additionaI amount to be paid for overlap) between adjacent strips and at transverse joints as minimum 300mm. | 123.55 | Cum | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
tender.pdf
Tender Documents • 1.88 MB
BOQ_858122.xls
BOQ • 2.21 MB
corr1.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .