| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.2 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹6.2 L+₹6,221.21 (1.01%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹6.2 L+₹6,898.76 (1.12%)Rejected-Finance VILL SERPUR ETOWARIBAR P O P S CONTAI DIST PURBA MEDINIPUR PIN 721401 | CONTAI | PURBA MEDINIPUR | WEST BENGAL | 721401 | 3 | Rejected-Finance L3 |
Tender Value
₹6.2 L
EMD Value
₹12,319
Closing Date
8 Dec 2025, 5:00 pmClosed
Chairman, Contai Municipality
Hatabari, Contai
Construction of Road Crossing Drain the House Booth no. - 97
2025_MAD_946708_1
WBMAD/ULB/CONTAI/188/APAS/B 97/2025-26
Open Tender
CIVIL WORKS
Percentage
60 days
Contai Municipality
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,319
18 Apr 2026
13 Nov 2025
10 Dec 2025
13 Nov 2025
8 Dec 2025
13 Nov 2025
P.W.D, Page No. 1, Item No.- 2 (a)
Earth work in excavation of foundation trenches or drains. in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing. Spreading or stacking the spils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches. leveling. dressing and ramming the bottom. bailing out water as required complete . (a) Depth of foundation upto 1500mm For Priority No. 01- 3.85 For Priority No. 04- 15.1875 For Priority No. 07- 4.86 For Priority No. 18 - 52.14375
Page No.- 23 / Item No.- 1(a)
(I) Cement concrete with graded jhama khoa (30 mm size excluding shuttering) In ground floor (a) 1:3:6 proportion For Priority No. 01- 0.33 For Priority No. 04- 1.6875 For Priority No. 07- 0.54 For Priority No. 18 - 5.79375
P.W.D, Page No. 47, Item No. 3
supplying and laying polythene Sheet ( 150 gm / sq.m) over damp proof couse or below flooring or roof terracing or in foundation trenches. For Priority No. 01- 5.00 For Priority No. 04- 27.00 For Priority No. 07- 31.20 For Priority No. 18 - 92.70
P.W.D, Page No.- 26, Item no.- 10(i)
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety For Priority No. 01- 2.40 For Priority No. 04- 7.20 For Priority No. 07- 5.43 For Priority No. 18 - 24.72
P.W.D, Page No.- 43, Item no.- 40 (i)(I).
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m. (i)Tor steel JSW/JSPL/SHYAM/SRMB/BMASL/ELETROSTEEL/ SSL For Priority No. 01- 0.23611 For Priority No. 04- 0.31546635 For Priority No. 07- 0.248796 For Priority No. 18 - 1.07713445
P.W.D, Page No.- 42, Item no.- 36 (f).
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) i) Steel suttering or 9 to 12 mm thick approved quality ply board suttering in any concrete work. For Priority No. 01- 14.80 For Priority No. 04- 63.00 For Priority No. 18 - 216.30
P.W.D, Page No.- 42, Item no.- 36 (f).
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) a) 25 to 30 mm thick wooden shuttering with out staging in foundation. For Priority No. 07- 24.60
Page No.-1, Item No.-3
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. For Priority No. 01- 0.77 For Priority No. 04- 3.0375 For Priority No. 18 - 10.42875
P.W.D (Roads)Page No.- 270/ Item No. - 8.07
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.) For Priority No. 01- 1 For Priority No. 04- 1 For Priority No. 07-1 For Priority No. 18 -1
Add 18% GST (Sl No. 1 to 9)
Add 1% Welfare Cess
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_2252062.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .