| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.6 L+₹1.3 L (7.28%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Ramesh Enterprises | Aslor Tek |
|---|---|---|---|---|---|
| 1.00 | Chipping and removing the deteriorated damaged concrete surface of RCC structures including all foreign materials and leaving behind only firm and solid concrete including cleaning with water, removing the loose rust deteriorated on the reinforcement by brushing, including applying one coat of Nitozinc primer to the exposed reinforcement rods, including all labours, tool equipment’s, staging propping etc., complete as directed by the Engineer at site. | 147.1 | M2 | 81,934.7 ₹96,682.95 Lowest | 88,848.4 ₹1,04,841.11 |
| 2.00 | Gunitting the prepared concrete surface at an average thickness of 50mm in two layer of 25mm each using op/pp cement mortar (1:3) by volume as per ISI 9082/1978 using guniting equipment the mixture being ejected and shot in to the surface by means of compressed air including treating the existing concrete surface before guniting with watering and applying cement slurry including cost of all materials, labour, lead, lift, T&P, staging, transport etc. complete. | 147.1 | M2 | 4,98,816.1 ₹5,88,603 Lowest | 5,40,445.4 ₹6,37,725.57 |
| 3.00 | Supplying, cutting, bending & tying in position secondary reinforcement wherever using GI weld mesh of size 75 X 50 mm 10gauge to the existing concrete surface prepared as per specification including transporting, fabricating bending & tying in position as per the engineer at site including cost of all materials labours, lead, lift, etc., complete | 147.1 | M3 | 83,994.1 ₹99,113.04 Lowest | 90,907.8 ₹1,07,271.2 |
| 4.00 | Applying DEKGUARD/ equivalent primer by spraying to the newly gunitted concrete surfaces as per manufactures specifications rate including cost of all materials, labours, lead, lifts etc., complete. | 147.1 | M2 | 28,537.4 ₹33,674.13 Lowest | 30,891 ₹36,451.38 |
| 4.20 | Applying two coats of DEKGUARD S/ equivalent top coat to the exposed concrete surfaces by brush/ roller coating continuously rate including cost of all materials, labours, lead, lift, etc., complete. | 237.6 | M2 | 97,891.2 ₹1,15,511.62 Lowest | 1,05,969.6 ₹1,25,044.13 |
| 5.00 | Providing PCC 1:1.5:3 screed concrete for floor using OP cement with 12mm chips for 50mm thickness machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete | 169.1 | M2 | 66,625.4 ₹78,617.97 Lowest | 72,205.7 ₹85,202.73 |
| 6.00 | Dismantling the existing damaged reinforcement concrete including cost of labours, lead, lift, etc. complete. | 8.3 | M2 | 38,296.2 ₹45,189.52 Lowest | 41,491.7 ₹48,960.21 |
| 7.00 | Providing RCC 1:1.5:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 27.3 | M3 | 2,63,417.7 ₹3,10,832.89 Lowest | 2,85,366.9 ₹3,36,732.94 |
| 8.00 | Providing HILTI joint arrangements to the rods by drilling holes into the old concrete and new concrete to a required depth and injecting motor HIT - RE 500 @ 0.50ml./mm chemicals, rate including the cost of chemical, drilling arrangements, labour charges, lead, lift, etc., complete | 28,000 | mm | 2,24,000 ₹2,64,320 Lowest | 2,24,000 ₹2,64,320 Lowest |
| 9.00 | Supplying and providing RTS reinforcement including cutting, bending, tying, fixing in position rate including cost of all materials, labour, lead, lift, etc., complete. | 2,180.8 | Kg | 2,04,995.2 ₹2,41,894.34 Lowest | 2,22,441.6 ₹2,62,481.09 |
Tender Value
Refer Docs
EMD Value
₹14,900
Closing Date
13 Nov 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
CE SE C TTPS 345 2025 26
2025_EB_618572_1
CE SE C TTPS 345 2025 26
Open Tender
Civil Works - Others
Item Rate
30 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,900
Yes
3 Dec 2025
29 Oct 2025
14 Nov 2025
29 Oct 2025
13 Nov 2025
29 Oct 2025
Chipping and removing the deteriorated damaged concrete surface of RCC structures including all foreign materials and leaving behind only firm and solid concrete including cleaning with water, removing the loose rust deteriorated on the reinforcement by brushing, including applying one coat of Nitozinc primer to the exposed reinforcement rods, including all labours, tool equipment’s, staging propping etc., complete as directed by the Engineer at site.
Gunitting the prepared concrete surface at an average thickness of 50mm in two layer of 25mm each using op/pp cement mortar (1:3) by volume as per ISI 9082/1978 using guniting equipment the mixture being ejected and shot in to the surface by means of compressed air including treating the existing concrete surface before guniting with watering and applying cement slurry including cost of all materials, labour, lead, lift, T&P, staging, transport etc. complete.
Supplying, cutting, bending & tying in position secondary reinforcement wherever using GI weld mesh of size 75 X 50 mm 10gauge to the existing concrete surface prepared as per specification including transporting, fabricating bending & tying in position as per the engineer at site including cost of all materials labours, lead, lift, etc., complete
Applying DEKGUARD/ equivalent primer by spraying to the newly gunitted concrete surfaces as per manufactures specifications rate including cost of all materials, labours, lead, lifts etc., complete.
Applying two coats of DEKGUARD S/ equivalent top coat to the exposed concrete surfaces by brush/ roller coating continuously rate including cost of all materials, labours, lead, lift, etc., complete.
Providing PCC 1:1.5:3 screed concrete for floor using OP cement with 12mm chips for 50mm thickness machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete
Dismantling the existing damaged reinforcement concrete including cost of labours, lead, lift, etc. complete.
Providing RCC 1:1.5:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Providing HILTI joint arrangements to the rods by drilling holes into the old concrete and new concrete to a required depth and injecting motor HIT - RE 500 @ 0.50ml./mm chemicals, rate including the cost of chemical, drilling arrangements, labour charges, lead, lift, etc., complete
Supplying and providing RTS reinforcement including cutting, bending, tying, fixing in position rate including cost of all materials, labour, lead, lift, etc., complete.
Providing shuttering for supporting the reinforced cement concrete surfaces rate including cost of all materials, labour, lead, lift, tools etc., complete.
Providing two coats of anticorrosive black paint to the new surface over a one coat of white cement primer including cost of all materials, labour, lead, lift, etc., complete.
Providing two coats of snowcem painting of approved colour & quality including cost of all materials, scaffolding charges, labours, lead, lift, curing, etc. complete
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_739393.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .