Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.8 LAccepted-AOC 545 LAXMI PLAZA LAXMI INDUSTRIAL ESTATE NEW LINK ROAD ANDHERI WEST MUMBAI 400 053 | MUMBAI SUBURBAN | MAHARASHTRA | 400053 | ₹69.8 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹72.3 L+₹2.5 L (3.51%)Rejected-AOC | ₹72.3 L+₹2.5 L (3.51%) | L2 | Rejected-AOC Not L1 bidder |
| 3 | L3₹73.0 L+₹3.1 L (4.48%)Rejected-AOC | ₹73.0 L+₹3.1 L (4.48%) | L3 | Rejected-AOC Not L1 bidder |
| 4 | L4₹73.9 L+₹4.1 L (5.84%)Rejected-AOC | ₹73.9 L+₹4.1 L (5.84%) | L4 | Rejected-AOC Not L1 bidder |
| 5 | L5₹74.8 L+₹4.9 L (7.07%)Rejected-AOC | ₹74.8 L+₹4.9 L (7.07%) | L5 | Rejected-AOC Not L1 bidder |
| Sl No | Description | Qty | Unit | Rajesh Infrastructure Pvt Ltd L12 | M/s Ankur Associates L13 | LEAKSEAL L14 | HERITAGE INFRA MEGA STRUCTURE INDIA PVT.LTD L6 | ADMIRECON INFRASTRUCTURE PVT LTD. L1 | M/s. Purva Associates L9 | Ranuja Dev Corporation L4 | BALAJI ENTERPRISES L5 | KHUSHBU ENTERPRISE L8 | M. S. SHAH AND ASSOCIATES L11 | Bawge And Sons L10 | M/s Mohd Altaf Hanif Qureshi L2 | KUMAWAT INFRASTRUCTURE L7 | ACCURATE STRUCT L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supplying and erecting protective net made up of Nylon rope with rope dia. of 10mm. having mesh size of 75mmx75mm with an overlay of 1" square nylon mesh with an additional overlay of good quality hassien cloth at the 2nd floor level along the building line with an average 3m. width from the building line with necessary MS supporting structures, including costs of all materials, labour charges, removing & disposal of the net after completion of the work etc. complete. | 2,400 | Sqm | 50 ₹1,20,000 | 269 ₹6,45,600 | 65 ₹1,56,000 | 118 ₹2,83,200 | 200 ₹4,80,000 | 60 ₹1,44,000 | 220 ₹5,28,000 | 295 ₹7,08,000 | 132 ₹3,16,800 | 350 ₹8,40,000 | 70 ₹1,68,000 | 50 ₹1,20,000 | 40 ₹96,000 Lowest | 100 ₹2,40,000 |
| 2.00 | Dismantling existing China mosaic type waterproofing layer from terrace by either mechanical or manual means, as required, including stacking material within 50 metres lead For thickness of tiles 10 mm to 25 mm, without damaging the RCC Slab . The rate should include cost of all materials , labour charges etc. complete. | 6,200 | Sqm | 120 ₹7,44,000 | 215 ₹13,33,000 | 195 ₹12,09,000 | 94.4 ₹5,85,280 | 125 ₹7,75,000 | 170 ₹10,54,000 | 240 ₹14,88,000 | 130 ₹8,06,000 | 200 ₹12,40,000 | 75 ₹4,65,000 Lowest | 155 ₹9,61,000 | 95 ₹5,89,000 | 200 ₹12,40,000 | 121 ₹7,50,200 |
| 3.00 | Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5 sqm and under or for continous stretch for parapet wall , including cutting the patch in proper shape, raking out joints and preparing and plastering the wall surface with white cement based polymer modified self curing mortar with provision of water dripping mould at the bottom of parapet wall (just above the terrace surface coving/watta) including disposal of rubbish, labour charges curing etc. all complete as per the direction of Bank's Engineer-In-Charge. | 1,600 | Sqm | 400 ₹6,40,000 Lowest | 807 ₹12,91,200 | 755 ₹12,08,000 | 885 ₹14,16,000 | 800 ₹12,80,000 | 600 ₹9,60,000 | 650 ₹10,40,000 | 512 ₹8,19,200 | 460 ₹7,36,000 | 650 ₹10,40,000 | 650 ₹10,40,000 | 600 ₹9,60,000 | 400 ₹6,40,000 Lowest | 770 ₹12,32,000 |
| 4.00 | Filling all the minor cracks upto 3 mm cracks with non-shrink compound using spatula or putty knife as per manufacturer specifications (Sealing of Plaster, IPS and non structural cracks including cots of all materials, labour charges etc. complete. | 500 | Mt | 100 ₹50,000 | 75 ₹37,500 | 125 ₹62,500 | 53.1 ₹26,550 | 100 ₹50,000 | 150 ₹75,000 | 295 ₹1,47,500 | 50 ₹25,000 | 20 ₹10,000 Lowest | 90 ₹45,000 | 25 ₹12,500 | 60 ₹30,000 | 85 ₹42,500 | 35 ₹17,500 |
| 5.00 | Chipping and removing the damaged/debonded concrete surface of the structural members using chisels/mild mechanical instruments and clean the surface thoroughly with potable water including removing the dirts /lose particles with electric blower and keep dry the surface for 24 hours. Providing, mixing and applying bonding coat of approved make of adhesive on chipped portion of RCC as per manufacture's specifications. Before applying the bonding coat, treat the exposed reinforcement if any using the rust removing chemical of approved make and applying Zinc rich epoxy primer of approved make as per the manufacurer's specification. The rate including costs of all materials, labour charges, curing, removing the debris from site to dumpyard in the premeises etc.complete in all respect.
SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area. | 100 | Sqm | 350 ₹35,000 | 430 ₹43,000 | 1,350 ₹1,35,000 | 472 ₹47,200 | 200 ₹20,000 | 500 ₹50,000 | 305 ₹30,500 | 550 ₹55,000 | 150 ₹15,000 Lowest | 300 ₹30,000 | 250 ₹25,000 | 280 ₹28,000 | 175 ₹17,500 | 300 ₹30,000 |
| 6.00 | Providing, mixing and applying SBR polymer of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 medium graded quartz or silt/clay/organic matter free Gujarat river sand with polymer minimum 2% by wt. of cement used) for thickness upto 30mm with 12 mm average thickness per layer as per manufacturer's specifications and directions of Engineer-in-charge including costs of all materials , labour charges, curing etc. complete. | 100 | Sqm | 600 ₹60,000 | 1,000 ₹1,00,000 | 860 ₹86,000 | 826 ₹82,600 | 1,500 ₹1,50,000 | 750 ₹75,000 | 3,063 ₹3,06,300 | 125 ₹12,500 Lowest | 900 ₹90,000 | 700 ₹70,000 | 650 ₹65,000 | 730 ₹73,000 | 1,180 ₹1,18,000 | 675 ₹67,500 |
| 7.00 | Cleaning the terrace surface in all respect by removing the dirt and debris manually and mechanically using electric blower. Applying bonding coat of approved make on the prepared surface as per the manufacurer's specification. Then, grading roof having average thickness of 50 mm for water proofing treatment with Cement concrete 1:2:4 (1 cement : 2 well graded Gujarat river coarse sand :
4 well graded stone aggregate of size 20mm down ) mixed with waterproofing additives of approved make as per the manufacture's specifications including costs of all materials, labour charges, curing etc. complete. | 230 | Cum | 8,000 ₹18,40,000 | 13,000 ₹29,90,000 | 10,500 ₹24,15,000 | 11,800 ₹27,14,000 | 7,000 ₹16,10,000 | 8,000 ₹18,40,000 | 6,500 ₹14,95,000 Lowest | 8,900 ₹20,47,000 | 12,500 ₹28,75,000 | 8,000 ₹18,40,000 | 17,000 ₹39,10,000 | 10,500 ₹24,15,000 | 8,000 ₹18,40,000 | 7,100 ₹16,33,000 |
| 8.00 | Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof as well as parapet wall in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes/electric blower, complete in all respect as per the manufacturer's specifications and direction of Engineer- in-Charge. The rate includes costs of all materials, labour charges, curing etc.complete. | 6,200 | Sqm | 850 ₹52,70,000 | 430 ₹26,66,000 | 805 ₹49,91,000 | 413 ₹25,60,600 | 400 ₹24,80,000 | 595 ₹36,89,000 | 350 ₹21,70,000 | 450 ₹27,90,000 | 446 ₹27,65,200 | 700 ₹43,40,000 | 295 ₹18,29,000 Lowest | 473 ₹29,32,600 | 630 ₹39,06,000 | 496 ₹30,75,200 |
| 9.00 | Providing the brickwork pedestals of size about 600mmx300mmx300mm @1200mm c/c across the gap of about 3m on the terrace. The brickwork shall be properly plastered with cement mortar 1:4. Then, lifting/shifting the existing water supply pipes laid on the terrace surface and placing it on the brick pedestals without any damage and clamped properly on the pedestals. These sets of pedestals shall be provided at 8 locations. The work also includes shifting and laying water supply pipes without any damage of pipes and place on the cross beam nearby at 2 locations and clamping properly on the terrace floor. The work shall be carried out as per the directions of NABARD (Bank) Engineer-in-charge. The rate includes costs of replacement of damged plumbing joints/couplings/fittings of pipes if any required while shifting the pipes, costs of clamps , costs of all materials, labour charges, curing etc. complete. | 1 | Lumpsum | 50,000 ₹50,000 | 2,00,000 ₹2,00,000 | 5,00,000 ₹5,00,000 | 11,800 ₹11,800 Lowest | 25,000 ₹25,000 | 45,000 ₹45,000 | 24,000 ₹24,000 | 1,10,000 ₹1,10,000 | 40,000 ₹40,000 | 1,00,000 ₹1,00,000 | 2,00,000 ₹2,00,000 | 24,900 ₹24,900 | 20,000 ₹20,000 | 22,700 ₹22,700 |
| 10.00 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m. of initial lead, for all leads including all lifts involved. | 230 | Cum | 800 ₹1,84,000 | 8 ₹1,840 Lowest | 800 ₹1,84,000 | 1,180 ₹2,71,400 | 500 ₹1,15,000 | 1,500 ₹3,45,000 | 710 ₹1,63,300 | 460 ₹1,05,800 | 725 ₹1,66,750 | 800 ₹1,84,000 | 1,000 ₹2,30,000 | 250 ₹57,500 | 725 ₹1,66,750 | 1,000 ₹2,30,000 |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
6 Aug 2025, 3:00 pmClosed
CGM
NABARD HO BKC Mumbai
RE-TENDER FOR TERRACE WATERPROOFING WORKS AT BANK RESIDENTIAL QUARTERS, NABARD NAGAR, THAKUR COMPLEX, KANDIVALI (EAST), MUMBAI -400101
2025_NABA_870118_1
62979
Open Tender
Civil Works
Item Rate
NABARD NAGAR, THAKUR COMPLEX, KANDIVALI (EAST)
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.8 L
Yes
14 Nov 2025
23 Jul 2025
7 Aug 2025
23 Jul 2025
6 Aug 2025
23 Jul 2025
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .