| 1 | L1₹14.5 CrAccepted-AOC NAHAR KHAN SARAI BADAUN | BADAUN | BUDAUN | UTTAR PRADESH | ₹14.5 Cr | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹14.6 CrRejected-Finance R P S MARKET DATAGANJ DISTRICT BADAUN UTTAR PRADESH | DATAGANJ | BADAUN | UTTAR PRADESH | ₹14.6 Cr | L2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | R H Construction L1 | RISHI VISHWAKARMA CONSTRUCTION (R.V. CONSTRUCTION) L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m As per MORT&H Specification 2019, S.No. 3.06 (Clause-301) | 18,144 | Cum | 55.5 ₹10.1 L | 55 ₹10.0 L |
| 2.00 | Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain anmd foundation of other structures graded and compacted to meet requirement of table 300-2 | 18,144 | Cum | 64 ₹11.6 L | 63 ₹11.4 L |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. As per MORT&H Specification 2019, S.No. 3.16 (Clause-305) | 3,217.8 | Cum | 119 ₹3.8 L | 118 ₹3.8 L |
| 4.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. As per MORT&H Specification 2019, S.No. 3.16 (Clause-305) with 1 Km Cartage | 948.6 | Cum | 179 ₹1.7 L | 175 ₹1.7 L |
| 5.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per MORTH 2019 S.No. 4.01 clause 401A (Grading -1 Material) | 6,720 | Cum | 4,750 ₹3.2 Cr | 4,800 ₹3.2 Cr |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. As per MORT&H Specification 2019, 4.14 (Clause-406B) | 5,194 | Cum | 4,900 ₹2.5 Cr | 4,950 ₹2.6 Cr |
| 7.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification 2019 clause No. 505 complete in all respects. | 2,100 | Cum | 10,400 ₹2.2 Cr | 10,450 ₹2.2 Cr |
| 8.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 As per MORT&H Specification 2019, S.No. 3.18 (Clause-305) with 1 KM cartage | 746.64 | Cum | 184 ₹1.4 L | 184 ₹1.4 L |
| 9.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 As per MORT&H Specification 2019, S.No. 3.18 (Clause-305) | 2,532.72 | Cum | 121 ₹3.1 L | 121 ₹3.1 L |
| 10.00 | Providing & applying Primer coat with bitumen emulsion (Slow setting type-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg/Sqm. Using mechanical means including cost of all material, labour, T&P etc. required for proper completion of the work as per MORT&H specifications (2001) No. 502.8 | 28,000 | Sqm | 38 ₹10.6 L | 38 ₹10.6 L |
Tender Value
₹15.3 Cr
EMD Value
₹30 L
Closing Date
28 Feb 2026, 12:00 pmClosed
Superintending Engineer,
Superintending Engineer Badaun-Pilibhit Circle, PWD, Bareilly (UP)
WIDENING AND STRENGTHENING WORK OF USAWAN AKBARPUR SATHRA MATHLA KATRA ROAD (O.D.R.) KM 01 TO 12 UNDER DATAGANJ VIDHANSABHA IN DISTRICT BADAUN FY 2025-26
2026_CEBLY_1117384_1
683/7NividaPD ET-8/25-26 dt 29-01-26
Open Tender
Civil Works - Roads
365 days
Budaun
Please Refer Tender Documents
4 documents required · 4 mandatory
₹2,714
₹30 L
Yes
Bareilly
20 Mar 2026
17 Feb 2026
28 Feb 2026
17 Feb 2026
28 Feb 2026
17 Feb 2026
18 Feb 2026
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m As per MORT&H Specification 2019, S.No. 3.06 (Clause-301)
Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain anmd foundation of other structures graded and compacted to meet requirement of table 300-2
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. As per MORT&H Specification 2019, S.No. 3.16 (Clause-305)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. As per MORT&H Specification 2019, S.No. 3.16 (Clause-305) with 1 Km Cartage
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per MORTH 2019 S.No. 4.01 clause 401A (Grading -1 Material)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. As per MORT&H Specification 2019, 4.14 (Clause-406B)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification 2019 clause No. 505 complete in all respects.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 As per MORT&H Specification 2019, S.No. 3.18 (Clause-305) with 1 KM cartage
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 As per MORT&H Specification 2019, S.No. 3.18 (Clause-305)
Providing & applying Primer coat with bitumen emulsion (Slow setting type-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70kg/Sqm. Using mechanical means including cost of all material, labour, T&P etc. required for proper completion of the work as per MORT&H specifications (2001) No. 502.8
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.As per MORT&H Specification 2019, S.No. 5.02 (Clause-503I)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification 2019 clause No. 505 complete in all respects.
Providing and laying bituminous concrete (Grading-II) with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per As per MORT&H Specification 2019, S.No. 5.05 (Clause-507B)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per MORTH 2019 S.No. 9.01 clause 304.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days as per MORTH 2019 S.No. 9.03 clause 304
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and MORT&H sr. no. 12.05 Technical Specifications1300.as per MORTH 2019 S.No. 12.05 clause 1300
Supply & laying of compacted 40 mm gauge brick ballast around and below hume pipe (As per N.S. Item No. 8)
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications as per MORTH 2019 S.No. 13.02 clause 1300& 2200
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and MORT&H sr. 12.08 Technical Specifications 1500,1700 & 2100.
Laying Reinforce cement concrete pipe NP 4 / Prestressed concrete pipe on first Class bending in single row
Plain/Reinforced Cement Concrete in sub structuree complete as per drawing and Technical Specifications 1500,1700 & 2200
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.19 MB
SBD.pdf
Tender Documents • 2.52 MB
BOQ_2076196.xls
BOQ • 0.33 MB
ADDENDUM1.pdf
Additional Documents • 11.12 MB
Download all tender documents and submit your bid