Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC | L1 | Accepted-AOC Accepted being the lowest | |
| 2 | L2₹14.9 L+₹7.4 L (99.7%)Rejected-AOC | L2 | Rejected-AOC Not accepted being not lowest | |
| 3 | L3₹17.0 L+₹9.5 L (127.4%)Rejected-AOC | L3 | Rejected-AOC Not accepted being not lowest | |
| 4 | Rejected-Technical | - | Rejected-Technical Not Admitted since not enlisted in Cat d(v) |
Tender Value
Refer Docs
EMD Value
₹17,000
Closing Date
9 Mar 2022, 6:00 pmClosed
SHRI VINEET MODI
CWE AF North Bangalore Bellary Road JC Nagar Post Bangalore 560006
COMPREHENSIVE MAINT OF ETP PLANT AT CHAF BANGALORE
2022_MES_500820_2
87466CWEAFNBAN
Open Tender
Civil Works
Item Rate
330 days
GE (AF) BANGALORE
AS PER NIT
6 documents required · 6 mandatory
₹500
GE (AF) BANGALORE
₹17,000
Yes
4 May 2022
18 Feb 2022
11 Mar 2022
18 Feb 2022
9 Mar 2022
25 Feb 2022
19 Feb 2022 - 24 Feb 2022
Amount
Supply and applying bio-culture catalyst which meets CPCB (Central Pollution control Board ) norms for maintainance of the ETP to ensure the quality of treated water and long life of the plant (Bio Culture catalyst is very important material for ETP to increase the filteration efficency of Soil media of wetland ) as all as specified and directed by engineer in charge ,
Supply and applying chlorination to ETP treated water using premium calcium Hypochlorite granules /sodium powder all as specified and directed, Make : Sree royal/Aqua tech/Grasim or Equivalent
Collection of effluent samples from treated water and carrying out of the following set of tests from KSPCB approved laboratory and submitting the results in triplicate inclduing necessary transporataion charges all as specified and as directed a) Potential of Hydrogen (pH) b) Bio-chemical Oxygen Demand (BOD) c)Turbidity d) Total Suspended Solids(TSS) e) Coliforms Micro Biological Density Note:- Contractor has to collect and submit Sample every alternative month to Auth-laboratory, and collection of report and submission of the same to the Engineer Incharge.
Taking out filter media gravels 20 to 40 mm carefully from ETP wetland filter bed and depositing at a distance not less 50 mtr where directed and Re-use of cleaned gravels washing /cleaning with using suitable chemical washing and free from any silt , foreign material etc and refilling gravel grade wise to the bed of filtration plant complete all as specified and directed.Location:ETP plant at CHAFB
M & L in replacement of metals of beds of ETP plant (Aggregate 2 to 8 mm size) including taking down and refixing the existing UPVC distributor lines on top of biowet land soil media for replacing aggregate beds all as specied and directed.
M & L in replacement of metals of beds of ETP plant (Aggregate 8 to 20 mm size) including taking down and refixing the existing UPVC distributor lines on top of bio wetland soil media for replacing aggregate beds all as specied and directed.
M & L for provn of plantation in bed surface of ETP plant complete all as specified and directed at site . Note:- 1 nos Sapling = 1 nos (Rose or eqivalent plant)
M & L for taking down and fixing of uPVC pipe of pressure rating 10 Kgf/Cm2 laid in surface/trenches/laid on ground complete,including drilling holes on pipes for watering at a distance as directed with connected items of size 25mm
M & L for taking down and fixing of uPVC pipe of pressure rating 10 Kgf/Cm2 laid in surface/trenches/laid on ground complete including drilling holes on pipes for watering at a distance as directed with connected items of size 50mm
S & F in replacement of CI Foot valve , ISI marked, 100mm bore, flanged and drilled and fixed with bolts and nuts and washers including providing rubber gasket ,mseal,with suitable thickness all as specified and as directed.
Supply and fix in replacement of Non-return/Reflux valve (NRV) with Bypass arrangement, cast iron body, ISI marked, conforming to IS-5312, 100 mm bore, flanged and drilled and fixed with bolts and nuts and washers suitable for suction line including providing rubber gasket of suitable thickness complete all as specified and as necessary connected work . Make :Kirloskar/Leader/SANT/Varun/Venus or equivalent
M & L for Disconnecting/ Dismantling & Removing the burnt out 1.5/2.0 HP submercible pump set, transport to the workshop, servicing, rewinding the motor stator, with proper guage copper enemalled insulating wire, with varnishing, painting, greasing of bearing , cleaning , new gland packing and suitable capacitors,etc and reassemble the same, test and commissioning in original position after completion of job all specified and directed at site
M & L for Disconnecting/ Dismantling & Removing the burnt out 7.5 HP pump set, transport to the workshop, servicing, rewinding the motor stator, with proper guage copper enemalled insulating wire, with varnishing, painting, greasing of bearing , cleaning , new gland packing and suitable capacitors, etc and reassemble the same, test and commissioning in original position after completion of job all specified and directed at site
M & L for Disconnecting/ Dismantling & Removing the burnt out 12.5 HP pump set, transport to the workshop, servicing, rewinding the motor stator, with proper guage copper enemalled insulating wire, with varnishing, painting, greasing of bearing , cleaning , new gland packing and suitable capacitors, etc and reassemble the same, test and commissioning in original position after completion of job all specified and directed at site
S & F in replacement of DOL Starter rating 1.5/2 HP , 3ø , 415 V with Adj OL Relay , in existing location at site, testing and commissioning as per site specifications. Make: Havells , Cat No :IHSDOAH1LA / L & T / BCH or Equivalent
S & F in replacement of fully automatic Star Delta Starter with single phase preventer and adjustable OL Relay of rating 7.5 HP,3ø ,415V in existing panel at site, testing and commissioning as per site specifications. Make: Havells Cat no : IHSASAJ1LA / L & T / BCH or Equivalent
S & F in replacement of fully automatic Star Delta Starter with single phase preventer and adjustable OL Relay of rating 12.5 HP,3ø ,415V in existing panel at site, testing and commissioning as per site specifications. Make: Havells Cat no : IHSASAL1LA / L & T / BCH or Equivalent
S&F in replacement of Submersible cable flat copper four core 4 Sq mm including laying and all with connected work make: Havells/Finolex/Polycab or Equivalent
S&F in replacement of Submersible cable flat copper four core 2.5 Sq mm including laying and all with connected work make: Havells/Finolex/Polycab or Equivalent
M & L for removing old paint by paint removers of burning off by blow lamps and cleaning with scrappers any no of coats any width or grith and preparation of old painted surfaces with priming and applying two coats of synthetic enamel paint on old steel surfaces ,steel angles including danger Notice board ,LT Pannel,Notice for Not drinking water board,pumpsets,pipelines,chamber covers pathway,etc, all as specified and as directed by Engineer-in-charge
Material and labour for PCC 1:2:4 type B-1 using 20 mm graded aggregate for coping of and platform incl. necessary form work fair and finishing without using extra cement complete all as directed.
M&L for De-watering, removing all mosses, algae and dirt from internal walls, floors & mouths of pipes of RCC / under ground sump by using steel wire brush and cleaning with high pressure industrial vacuum sucking machine cleaner including removing of Effulent sludge water completely using High speed vaccum sludge pump set and disposing off the same to a safe distance out side the unit with the permissiion of BWSSB authorities and applying of anti bacterial sterilization spray to internal surfaces using Zero bacterial compound (Sodium hypochlorte) or equivalent approved chemical complete and writing the date of cleaning on outside of tank/ sump using synthetic enamel paint of white colour over black background with letters of size 100mm height x 100mm breadth complete all as specified and directed by Engr-in-charge, for ETP SUMP measuring 5m x 8m x 3m of 1,20,000 Litres Cap.
All as per SI item No 22 above but for ETP UG SUMP measuring 4m x 8m x 3m of 96,000 Liters capacity
All as per SI item No 22 above but for ETP UG Sump measuring 5m x 8m x 3.25m of 1,30,000 litres capacity
All as per SI item No 22 above but for ETP UG sump measuring 9m x 8m x 3.25m of 2,36,000 litres capacity
Taking down old unsv pressure gauge from position and S & F new pressure guage of nominal dia 25 mm, 0-10 Kgf/cm2 rating of ISO 4064 Class B complete all as specified and directed.
M & L in replacement of UPVC pipe gate valve of pressure rating 10 Kgf/Cm2 with connected items of size 25mm including joining & jointing materials, laid in surface/trenches/ground complete all as specified and directed.
M & L in replacement of HDPE Double wall corrugated (DWC)Pipes conforming IS -14930 ISI Marked with connected items of size 100mm all as specified and directed.
M & L in replacement of PVC tap with collor and connected items of size 25mm including joining & jointing materials, as specified and directed
M&L notice plate of 1.6mm thick mild steel sheet vitreous enameled white colour with writing " NOT FOR DRINKING". in 'RED' colour and fixed with MS clamps, nuts and bolts of approved size of HT 25 x 20 cm size.
S&F in replacement of 0.5 Hp,3phase induction motor 415 V 50Hz, for Dozing pump including commissioning and testing in original position and topping up flow control oil of grade 460 of the Dozing system complete as specified and directed at site Make :- Sathya sai or equivalent. Note for Sl No. 1 to 31 :- 1. The firm is responsible for functioning of ETP plant during the currency of contract period. 2. Any sch above item found to become non functional / breakdown, the firm shall locate the problem / fault at site within 24 hours on intimation by JE / Engineer-In-Charge and ensure that the fault is rectified within 48 Hours on locating the fault, failing which an amount Rs 300.00 per hour will be recovered as penalty from contractor dues after expiry of 48 hours 3. The firm is responsible for all spares / items as applicable shall be purchased from original manufacturers / auth distributor / dealer only and GST vouchers shall be submit to Deptt while claiming payments 4. The firm is responsible to carry out check of all the ETP plant system at least once in month to ensure serviceabilty and effectiveness of the complete system for which a maintenance record/certificate duly signed by contractor, JE E/M, Engineer-in-Charge and users rep to be maintained and encl photos with RAR while claiming payments.
B5BUILDING SOLUTIONS
M/S Bhagyawanticonstruction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .